SOLAS II-1/15.8 and ICLL Regulation 22 cover machinery sea inlets and overboard discharges. They call for readily accessible valves of steel, bronze or other approved ductile material, never ordinary cast iron. SOLAS II-1/26 covers essential auxiliaries, and II-1/48 covers bilge alarms in unattended machinery spaces.
IMO Resolution MEPC.378(80), the 2023 Biofouling Guidelines, is recommendatory guidance. It treats sea chests, gratings and internal seawater cooling systems as niche areas. Australia and New Zealand enforce their own national biofouling rules at arrival. Log MGPS anode currents against the maker's setpoints, and record MGPS repair and maintenance in the Biofouling Record Book.
Isolate rising LT or HT temperatures step by step. Vent air-bound sea chests first. Switch the 3-way temperature controller to manual to rule out sensor or actuator hunting. Record the plate-pack dimension before opening a titanium PHE. Keep lube oil pressure above cooling water pressure, and keep HT inhibitor and chlorides inside the engine maker's limits.
Marine central cooling fault symptoms, root causes, statutory or maker anchors, and Chief Engineer isolation actions.
Observed Engine-Room Symptom
Primary Mechanical or Chemical Root Cause
Statutory, Class or Maker Anchor
Immediate Diagnostic & Corrective Action
Unsteady seawater pump discharge pressure and rising LT outlet temperature after rolling or shifting suctions
Air pocket at the top of the high or low sea chest, a part-choked duplex strainer basket, or vortexing at shallow draught
SOLAS II-1/26.6 (machinery designed to operate at 15° static heel, 22.5° roll and 7.5° pitch) and II-1/26.7 (provision for cleaning, inspection and maintenance)
Open the sea-chest vent until solid water flows. Shift from low to high suction in shallow, silty water. Isolate, depressurise and clean the standby strainer basket.
High seawater differential pressure across the central titanium PHE with steady seawater pump amps
Barnacle shell, mussel spat or carbonate scale blocking the narrow plate channels, for example when MGPS anode output is low
PHE maker's manual and IMO Res. MEPC.378(80) (2023 Biofouling Guidelines)
Put the standby cooler in service and back-flush if piped. Record the plate-pack dimension before opening. Brush plates with soft nylon brushes only, and check MGPS anode current.
Rhythmic LT or HT temperature swings at steady engine load with clean coolers
Backlash in the 3-way valve actuator linkage, a sticking pneumatic positioner, poor Pt100 thermowell contact, or PID gain set too high
Valve and control system maker's manual
Put the 3-way valve controller in manual at steady engine load. If the temperature flattens at once, service the actuator, clean and refill the Pt100 pocket, and retune the loop.
Rising chloride and conductivity readings in LT water with no visible external leak
Pinholed titanium PHE plate (for example from wire-brush damage) or a perished NBR/EPDM gasket letting seawater cross over while the pumps are stopped
Engine and cooler maker's water-treatment specification
Check that LT fresh water pressure stays above seawater pressure while running. Isolate the suspect PHE and pressure-test one side within maker limits. Dye-penetrant check cleaned plates, then flush and redose the LT water.
Honeycomb pitting on the wet outer wall of cast-iron cylinder liners, or frequent HT expansion-tank venting
Depleted nitrite-borate or organic-acid inhibitor, blocked deaeration lines, low header-tank static head, or combustion gas leakage
Engine maker's water-treatment and maintenance manual
Test HT inhibitor, pH and chlorides against engine maker limits and top up with distillate only. Clear the deaeration lines to the header tank. Check header vents for combustion gas.
Weeping sea-chest distance piece, stiff overboard valve spindle, or bilge-well high-level alarm in an unattended machinery space
Galvanic wastage at the steel distance-piece weld neck, missing sea-chest anodes, or worn non-metallic expansion bellows
SOLAS II-1/15.8, II-1/26.9 and II-1/48, ICLL Reg. 22, IACS UR Z3 and UR P2
Test bilge-well alarms. Check that sea-valve controls can be reached and worked in time (II-1/48.3). Inspect rubber bellows at the I/10(a) surveys. Report wastage to class and arrange an approved repair.
SOLAS Chapter II-1 Regulation 15 and Load Line Convention Regulation 22 cover hull openings below the freeboard deck on cargo ships and below the bulkhead deck on passenger ships. Machinery sea inlets and overboard lines need readily accessible valves between the pipework and the shell plating, or on the sea chest. Valve position must be easy to see. SOLAS II-1/15.8.5 and ICLL Reg. 22 call for steel, bronze or other approved ductile material. Ordinary cast iron is not accepted. IACS UR P2 also bars ordinary cast iron for sea valves and ship-side pipes, and asks for a hydraulic test of ship-side valves below the load waterline.
SOLAS Regulation II-1/26 sets general machinery rules. Regulation 26.3 asks that normal propulsion can be kept or restored if one essential auxiliary fails. Automatic standby pump cut-in is not in Regulation 26. It comes from the rules for periodically unattended machinery spaces (SOLAS II-1 Part E) and from class rules. Regulation 26.6 says machinery must be designed to operate at up to 15° static heel either way, rolling up to 22.5° and pitching up to 7.5°.
Regulation 26.7 asks for provision that makes cleaning, inspection and maintenance of machinery easier. Cross-connected sea chests and duplex strainers are one way to make cooling-system cleaning easier. Regulation 26.9 covers non-metallic expansion joints in pipes that pass through the ship's side, where both sit below the deepest load waterline. They are inspected at the surveys in SOLAS Regulation I/10(a) and replaced as needed or at the maker's interval.
In unattended machinery spaces, SOLAS Regulation 48.1 asks for bilge wells and high-level alarms that detect leaks at normal angles of heel and trim. Regulation 48.3 deals with controls for sea-inlet valves, discharges below the waterline and bilge injection. They must be placed so there is time to reach and operate them if water floods in. Where the possible flood level makes it necessary, they must work from above that level.
Under IACS UR Z3 and IMO Resolution A.1207(34), the outside of the bottom is examined twice in each five-year special survey period, with no more than 36 months between the two. At these bottom surveys the surveyor examines sea chests, gratings, sea connections, overboard valves and their fastenings. Valves and cocks need not be opened up more than once in a special survey period unless the surveyor thinks it necessary.
In ice or below-zero waters, check the steam or air sea-chest clearing connections and any warm LT recirculation line to the low sea chest. This is good practice to stop ice blocking the gratings. Wasted distance pieces, seized hull valves or dead bilge alarms can lead to Port State Control detention under IMO Resolution A.1206(34).
Switch from the low sea chest to the high sea chest before shallow, muddy or river approaches so silt, sand and stones stay out of pump wear rings and PHE channels.
Vent the active sea chest after undocking, heavy rolling or a suction changeover until air-free seawater flows steadily, then put the standby cooling pumps on automatic standby.
Test bilge-well high-level alarms (SOLAS II-1/48.1). Check clear access, clear open/shut indicators and smooth spindle travel on all sea-inlet, overboard and bilge-injection valves (II-1/48.3).
Inspect non-metallic ship-side expansion bellows at the SOLAS I/10(a) surveys for blistering, distortion, slack tie rods, paint on the rubber and expired maker service dates (SOLAS II-1/26.9).
Before slacking any sea-strainer cover afloat, close, lock and tag the inlet and discharge valves. Open the strainer drain and vent to prove zero pressure. Crack the cover nuts evenly, keeping them on the threads until the seal breaks.
Before any diver or ROV works on sea-chest gratings or hull coolers, lock out ICCP and engage the turning gear. Lock the sea-chest suction, overboard and steam or air blow-out valves, hoist Code Flag Alpha and issue a diving permit to work.
Hull sides can look clean while sea chests, grating slots, crossover lines and box-cooler chests foul quickly. Warm, sheltered water lets barnacles, mussels and tubeworms settle. Broken shell then lodges across PHE inlet ports or box-cooler tubes, and scavenge air, lube oil and jacket water temperatures rise.
IMO Resolution MEPC.378(80) is the 2023 set of Guidelines for the control and management of ships' biofouling. It was adopted on 7 July 2023 and replaced MEPC.207(62). It names sea chests, gratings and internal seawater cooling systems as niche areas that need attention in the Biofouling Management Plan.
Keep the legal status clear. MEPC.378(80) is recommendatory guidance, not a mandatory convention annex. Australia (pre-arrival reporting under the Biosecurity Act 2015) and New Zealand (MPI Craft Risk Management Standard for Biofouling) enforce their own national rules at arrival. Keep the AFS certificate current as well, since MEPC.331(76) added cybutryne to the AFS Convention controls.
An impressed-current Marine Growth Prevention System (MGPS), also called ICAF, protects seawater pipes and cooler chests. Copper anodes in the sea chest or strainer release a little copper to deter larvae from settling. Aluminium or soft-iron anodes form a thin film that protects the pipework against corrosion.
Anode output depends on seawater flow, so link the MGPS panel to the seawater pump running signal or a flow switch, as the maker's manual directs. The current then steps down or cuts out when the sea chest is still. Log anode currents against the maker's setpoints. Record MGPS repair and maintenance in the Biofouling Record Book (MEPC.378(80) Section 11).
A drained sea chest, box-cooler trunk or cofferdam is an enclosed space. Use the ship's SMS entry permit, in line with IMO Resolution MSC.581(110) (adopted 27 June 2025, replacing A.1050(27)) and SOLAS Regulation XI-1/7. Rotting marine growth uses up oxygen and gives off hydrogen sulphide (H2S) and carbon dioxide (CO2).
Ventilate well, then stop the fans so the air settles (about 10 minutes on the IMO example permit). Test from outside at several levels with the portable instrument SOLAS XI-1/7 requires. SOLAS also asks for suitable means to calibrate it. Look for 20.9% oxygen by volume, below 0.5% CO2, below 1% LFL and below 50% OEL for toxic gases.
Restart the ventilation before entry and keep it running. Set the permit length from the risk assessment, never more than eight hours. Rig positive-pressure SCBA and rescue gear at the opening before anyone goes in.
Log MGPS / ICAF anode currents and voltages daily or weekly against the maker's setpoints for fresh, brackish and open-sea water. Record maintenance and anode renewals in the Biofouling Record Book (MEPC.378(80) Section 11).
Investigate a zero-current reading on any MGPS channel at once. Tell an open-circuit cable, blown rectifier fuse or painted anode apart from a fully used copper anode.
At drydock, check that painters mask all sea-chest zinc or aluminium anodes, MGPS anode sleeves and grating hinge pins, so anti-fouling paint never covers a working anode.
Check the MGPS low-flow or pump-stopped interlock as the maker's manual directs, so the current does not over-drive a still sea chest during long port stays.
3. Hull Box Coolers vs Central Titanium Plate Heat Exchangers (PHE): Fouling, Pinch Dimensions & Pressure Hierarchy
Ships reject LT fresh water heat to the sea in one of two ways. Box coolers sit in the hull and are found on tugs, offshore support vessels and inland or coastal ships. Central titanium plate heat exchangers with pumped seawater are found on deep-sea ships such as LNG carriers, container ships, bulk carriers and tankers.
A box cooler hangs a coated copper-alloy U-tube bundle inside a slotted hull chest. Warm LT water in the tubes heats the seawater around them. The warm water rises out through the upper slots and draws cool water in at the bottom, even alongside. No seawater pumps, strainers or seawater mains are needed.
Box coolers fail in three separate ways. First, if the MGPS copper anode in the chest fails, barnacles and mussels bridge the tube gaps and stop the natural flow. Second, if the small vent pipe from the top of the chest blocks, trapped air covers the upper tubes. The bundle stays clean, but much of its cooling area is lost.
Third, if the epoxy coating is scraped off the tubes with metal tools, or the hull anodes waste away, the copper-alloy tubes and bare hull steel form a galvanic couple. The hull chest or tube-sheet joints then pit quickly.
Central PHEs use corrugated Grade 1 titanium plates that resist seawater corrosion well. The plates are thin, and the clip-on or glued gaskets (NBR, HNBR or EPDM, chosen to the maker's rating) need careful handling. Follow the PHE maker's manual for every overhaul.
Before loosening any tie bolt on an isolated, drained and cooled PHE, measure and record the plate-pack dimension across the top and bottom guide bars. The maker's minimum and maximum (often called the A-dimension) may be on the nameplate. Slacken the tie bolts a little at a time in diagonal pairs so the follower plate moves back squarely.
Clean titanium plates only with a fresh water jet within the maker's pressure and distance limits, soft nylon brushes, or maker-approved weak-acid cleaning-in-place for scale. Never use steel wire brushes, scrapers or hydrochloric acid. Iron particles damage the titanium's protective oxide film and can start crevice corrosion and pinholes.
To find a leaking plate, dye-penetrant check the clean, dry plates, paying attention to contact points and port rings. Then pressure-test one side within the maker's test pressure. Keep the double-gasket leak grooves at the ports clear, so a failed port seal shows as a visible drip instead of mixing the two fluids unseen.
Keep the pressures in the right order across every cooler. Lube oil pressure at the lube oil coolers should be higher than LT fresh water pressure. LT fresh water pressure, held up by the expansion tank head when pumps stop, should be higher than seawater head.
With pressures in that order, a pinhole leaks clean LT water out to sea, or a trace of oil into the LT expansion tank where it shows at the sight glass. Seawater is not pushed into the engine or its lube oil.
Trend seawater and LT fresh water inlet and outlet temperatures (the cooler approach temperature) and differential pressure at steady engine load. This separates real plate fouling from warm tropical seawater.
Before loosening PHE tie bolts, clean and lightly grease the threads with the maker's recommended anti-seize paste, and record the plate-pack dimension at all four corners.
Never tighten a weeping PHE past the maker's minimum plate-pack dimension. Metal-to-metal contact crushes the titanium corrugations and can ruin the whole plate pack.
Check the double-gasket corner leak vents on every PHE during rounds, so a weeping seal drips visibly into the tray instead of tracking into the other fluid.
On box-cooler ships, check that the chest air vents are clear after undocking. Rest lifted U-tube bundles on timber or rubber cradles so the tube coating is not scratched.
4. Isolating 3-Way LT & HT Thermostatic Control Valve Hunting vs Cooler Fouling
Do not strip down a clean central PHE when LT or HT temperatures swing or creep up. The fault may be in the 3-way valve loop instead. On two-stroke and four-stroke plants, electric or pneumatic 3-way valves (or wax-element valves on small circuits) mix bypass water with cooled water. They hold LT and HT temperatures steady from full sea load down to dead slow.
Check the valve position before touching a spanner. If the LT 3-way valve is already 100% open to the cooler with no bypass, and seawater flow is air-free, the cooler is short of capacity. The cause is fouling or too little seawater flow.
If the temperature swings by several degrees while the valve hunts in mid-stroke (for example between 35% and 75% open to the cooler), switch the controller from automatic to manual at steady engine load. Follow the maker's manual for this test.
If the temperature flattens as soon as the valve is held in manual, the cooler is not the problem and the fault sits in the control loop. Possible causes are a sticking valve shaft gland, worn linkage pins between actuator and valve, or water and oil in the pneumatic positioner.
Other causes are a dry or corroded Pt100 pocket that slows the reading, or loop gain and integral time tuned at full load that turn unstable at low harbour flow. On wax-element valves, the wax capsules lose stroke over time and stop opening fully to the cooler. Check full travel in a heated water bath at the maker's overhaul interval, and check the manual override screws.
Compare the controller output signal (4 to 20 mA) with the pointer on the 3-way valve to spot actuator sticking, sheared shaft keys or slipped feedback sensors.
Make sure the Pt100 sensor sits several pipe diameters past the 3-way mixing point, in a clean pocket filled with heat-transfer paste or oil, so unmixed hot and cold water does not cause false hunting.
Drain water and oil from the control-air filter-regulators feeding pneumatic 3-way valve positioners every week.
Check the actuator's fail-safe action against the engine maker's design, so loss of control air or 24 V DC power moves the 3-way valve toward cooling rather than full hot bypass.
Closed HT fresh water circuits cool cylinder liners, cylinder covers, exhaust valve cages and some charge air or turbocharger parts. Metal temperatures are high and combustion causes strong vibration.
Poor water treatment harms the engine in two ways. Hard shore water bakes scale onto hot cylinder covers, which blocks heat transfer until thermal stress cracks them. Too little inhibitor or low static pressure lets vapour bubbles collapse against the vibrating liners. This cavitation cuts honeycomb pits into the cast-iron wall and the lower O-ring lands.
Dose and test the HT and LT circuits exactly as the engine and cooler maker's water-treatment manual says. Use low-chloride distilled water from the fresh water generator, not shore or drinking water. Engine makers specify inhibitors such as buffered nitrite-borate, or approved molybdate or organic-acid products where aluminium or soldered cooler parts are fitted.
Never mix inhibitor types without draining and flushing first. A badly under-dosed nitrite inhibitor can be worse than plain water, because it leaves parts of the steel unprotected and focuses attack into deep pits. Bacteria can also use up nitrite, for example by turning it into nitrate. A nitrite drop together with falling pH calls for a lab test.
Test the cooling water on board at the engine maker's interval, for example weekly. Check inhibitor, pH, chlorides and hardness or conductivity. Send samples to a shore laboratory at the maker's interval as a cross-check.
Treat any step up in chlorides as a warning. Possible causes are seawater getting in through a cooler, salty distillate from the fresh water generator (check the salinometer dump alarm), or make-up with drinking water by mistake.
Keep the small deaeration lines from cylinder tops and turbocharger casings clear back to the HT expansion tank. Check the expansion tank level alarms and static head. On dual-fuel engines, watch for gas alarms at the header vents, which can mean a liner or head seal leak.
Keep standby engines pre-warmed to the engine maker's standby temperature, so they take load at once without thermal shock or cold corrosion of the liners.
Marvel Solutionz offers remote engineering support for owners, superintendents and Chief Engineers dealing with cooler fouling, liner cavitation or sea-valve readiness. A 1-hour consultancy is $350 USD (+ 5% sales tax). The LNG, Dual-Fuel (DF) & Spark-Gas (SG) Academy is $395 USD self-paced (+ 5% sales tax), and Corporate Team Training for up to 10 engineers is $3,500 USD (+ 5% sales tax).
Feed HT and LT expansion-tank make-up only from low-chloride distillate, never from the drinking water line. Fit a non-return valve and a meter or log entry so hidden water losses show early.
Log HT and LT inhibitor, pH and chloride results weekly against the engine maker's upper and lower limits, with regular shore lab cross-checks.
Feel the deaeration pipes from the engine top to the HT expansion tank during rounds. A cold pipe points to a blocked orifice trapping air and steam around the cylinder heads.
Check the HT expansion-tank sight glass and vent for oil sheen, gas bubbles or sudden level surges. These can point to a leaking liner O-ring, a cracked cylinder cover or a leaking fuel or lube oil heater or cooler.
Frequently Asked Questions
Which SOLAS and Load Line regulations govern ship-side sea chests and overboard valves?
SOLAS Regulation II-1/15.8 (including 15.8.3 and 15.8.5) and Load Line Regulation 22 cover machinery sea inlets and overboard discharges. Local control with open/closed indicators in manned machinery spaces is Reg. 22(2) in the 1966 Convention and Reg. 22(3) in the 1988 Protocol. Valve and fitting materials are Reg. 22(5) in 1966 and Reg. 22(6) in the 1988 Protocol. Valves must be readily accessible and made of steel, bronze or other approved ductile material, never ordinary cast iron. SOLAS II-1/26.9 covers survey inspection of non-metallic expansion joints below the waterline. SOLAS II-1/48 covers bilge alarms in unattended machinery spaces and controls that can be reached in time if water floods in.
Is IMO Resolution MEPC.378(80) on sea-chest biofouling mandatory under MARPOL?
No. IMO Resolution MEPC.378(80) (adopted 7 July 2023, replacing MEPC.207(62)) is recommendatory guidance, not a MARPOL annex. Some countries enforce their own rules at arrival. Australia requires pre-arrival biofouling reporting under the Biosecurity Act 2015, and New Zealand applies the MPI Craft Risk Management Standard for Biofouling. Keep the Biofouling Management Plan and Record Book up to date for those ports.
How can an engineer tell whether high LT cooling temperature comes from a fouled PHE or a faulty 3-way thermostatic valve?
First check whether the LT 3-way valve is already 100% open to the cooler with air-free seawater flow. If so, the cooler is short of capacity from fouling or low seawater flow. If the temperature swings while the valve hunts in mid-stroke, switch the controller to manual at steady engine load, as the maker's manual directs. If the temperature settles at once in manual, the fault is in the actuator, linkage, Pt100 pocket or tuning, not the plates.
Why must engineers record the tightening dimension before opening a titanium plate heat exchanger?
Titanium PHE plates seal and support each other at the corrugation contact points when the pack is compressed to the maker's dimension (the A-dimension). Slacking tie bolts unevenly can twist the follower plate. Tightening past the maker's minimum crushes the gaskets and bends the thin plates for good. Clean with soft nylon brushes, a controlled fresh water jet or maker-approved chemicals, never steel wire brushes.
What precautions apply before crew enter a drained sea chest or box-cooler trunk for inspection?
A drained sea chest or box-cooler chest with marine growth can be short of oxygen and hold H2S or CO2. Use the ship's SMS permit to work, in line with IMO Resolution MSC.581(110) (adopted 27 June 2025, replacing A.1050(27)) and SOLAS Regulation XI-1/7. Lock and blank all connected seawater, steam and air valves and isolate ICCP and MGPS power. Ventilate well, then stop the fans until the air settles (about 10 minutes on the IMO example permit). Test from outside at several levels for 20.9% oxygen, below 0.5% CO2, below 1% LFL and below 50% OEL for toxic gas. Restart the ventilation, keep the permit to no more than 8 hours, and post an attendant with SCBA and rescue gear at the opening (never EEBDs).
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/central-cooling-sea-chest-box-cooler-and-plate-heat-exchanger-guide/