SOLAS II-1/28 and II-1/31 set the rules for bridge control of a controllable pitch propeller (CPP). The bridge must control shaft speed, thrust direction and blade pitch, with one control lever per independent propeller and overload protection where needed (31.2.1). If remote control fails, an alarm is given and the set speed and thrust direction should be kept until local control takes over, unless the flag accepts this is impracticable (31.2.7). Propeller speed and pitch position must be shown on the navigating bridge (31.2.8.2).
Pitch drift, slow astern response and stern tube alarms can come from five places. The first is a sticking proportional valve spool or a drifting feedback transducer at the oil distribution (OD) box. The second is worn hub servo seals letting oil bypass. The third is seawater getting past a damaged stern seal and breaking down an ester-based environmentally acceptable lubricant (EAL). The fourth is an oily slip-ring lifting the shaft earthing brushes. The fifth is confusion on the bridge or in the ECR about how to lift the EEXI shaft or engine power limit (ShaPoLi or EPL).
Under MARPOL Annex VI Regulation 3.1 and MEPC.335(76), as amended by MEPC.375(80) and MEPC.390(81), the ShaPoLi or EPL limit may be lifted only to keep the ship safe or to save life at sea. If the limit is lifted early but the extra power is never used, log it in the bridge and engine-room logbooks and reset it promptly (paragraph 3.3). If the extra power is used, the master signs an entry on the Onboard Management Manual (OMM) record page (paragraph 3.2). The ship reports without delay to its flag or RO and to the destination port authority (paragraph 3.4). The limit is then restored and the flag or RO confirms it (paragraph 3.5).
Varnished or silted proportional valve spool, loose linkage or zero drift on the yoke feedback transducer, air in the servo oil, or oil bypassing a worn hub servo-piston seal.
Change over smoothly to ECR or local OD-box pitch control (SOLAS II-1/31.2.5 & 31.2.6). Check servo pump pressure and oil temperature against the propeller maker's limits. Look for bronze or rubber debris in the return filters. Recalibrate the feedback transducer at zero and at full ahead and full astern.
Loss of bridge remote CPP control signal or electric control-power failure on port approach
Remote propulsion control failure alarm & the ship's own fail-safe pitch design (SOLAS II-1/31.2.6 & II-1/31.2.7)
24 V DC / UPS control-bus earth fault, broken telegraph potentiometer or CAN-bus channel, or an open-circuit solenoid coil on the proportional actuator.
Confirm the remote-control failure alarm is given (II-1/31.2.7). Where it sounds, and whether it is audible and visual, is set by class rules and the maker. Check the pitch holds as set, or does what the ship's posted failure-mode notice says, while an engineer takes local pitch control.
Falling stern tube gravity header tank level or rising tank level with high water content at bottom sample cock
Forward/aft stern tube lip seals or air-regulated stern seal & EAL oil circuit (IACS UR Z21 Rev.4 & US VGP / VIDA)
Fishing-line or rope damage to the aft lip seals, wrong header-tank height or air-regulator setting, a leaking stern tube oil cooler, or water breaking down an ester-based EAL.
Check the daily header-tank consumption log and drain the water pot at the bottom. Where a higher header tank is fitted, change over as the seal maker says so oil pressure stays above sea pressure. Check air-seal flow and pressure where fitted. Send an oil sample for water, TAN and wear metals (at least every 6 months where UR Z21 Method 2 or 3 surveys are used).
Elevated shaft-to-hull electrical potential (mV) or frosted EDM pitting on main bearings, thrust pads or bull gear
Oil mist or grease glazing the copper, bronze or stainless slip-ring track, worn brushes sticking in their holders with weak springs, or a broken bonding strap to the hull.
Clean the slip-ring track only by the non-abrasive method in the earthing-device maker's manual. Check the brushes move freely with correct spring pressure, and renew them at the maker's wear marks. Check shaft-to-hull voltage stays within the maker's millivolt limit across the full rpm range.
Heavy-weather, ice or strong-current navigation requiring propulsion power above the EEXI limited power (MCR_lim)
Heavy weather, ice, collision or grounding avoidance, or a machinery casualty that needs the power reserve to keep the ship safe (MARPOL Annex VI Reg. 3.1).
The master or officer of the watch lifts the limit from the bridge as the OMM describes, or breaks the mechanical EPL seal with the master's permission where there is no bridge control. If the limit is lifted early and the reserve is not used, log the event, the power used and the reset in both logbooks (MEPC.390(81) para. 3.3). If the reserve is used, keep the system records and have the master sign the OMM record page (para. 3.2). Report without delay to the flag or RO and the destination port authority (para. 3.4). Restore the limit for flag or RO confirmation (para. 3.5).
Inability to declutch or reach zero propeller thrust before main-engine start or shaft-generator synchronisation
Shifted zero-pitch proximity switch at the OD box, low standby pump pressure stopping the blades from centring, or a leftover ahead or astern pitch offset overloading the engine start or PTO generator.
Start the standby CPP hydraulic pump. Check the mechanical pitch pointer on the OD box matches the bridge indicator (SOLAS II-1/31.2.8.2) and the ECR display at zero thrust. Adjust the zero-pitch limit switch as the maker's manual says, and confirm the starting-air and turning-gear interlocks.
SOLAS II-1/28 asks for enough astern power to control the ship properly in any normal situation. The propulsion plant must be able to reverse thrust in time to stop the ship within a reasonable distance from full ahead service speed. The stopping times, headings and distances found on sea trials are kept on board for the master's use. Ships with more than one propeller also keep the results of trials with one or more propellers out of use.
Where the bridge controls the main engine, Regulation 31.2 says it must handle shaft speed, thrust direction and, on a CPP, blade pitch in every sailing and manoeuvring condition. Each independent propeller has one control lever, and related services run automatically, with overload protection where needed (31.2.1). A bridge emergency stop works independently of the bridge control system (31.2.3). Bridge orders also show in the main machinery control room and at the manoeuvring platform (31.2.4). Only one station may control the engine at a time, and a transfer of control must not change thrust much (31.2.5).
If the remote control system fails, Regulation 31.2.7 asks for an alarm. It also asks for the set speed and thrust direction to be kept until local control is working, unless the flag accepts that this is impracticable. So the pitch should stay where it was set. Designs differ, though, and a CPP fault can leave the blades at full ahead, full astern or zero pitch. Every crew must know their own ship's failure mode. Regulation 31.2.8.2 asks for propeller speed and pitch position indicators on the navigating bridge. Indicators in the ECR and at the local stand come from class rules and the maker's design.
Before arrival and departure, run the CPP from full ahead to full astern, check the standby hydraulic pump starts by itself, and check control transfer to the ECR happens without a big change in thrust (SOLAS II-1/28 & II-1/31.2.5). Record the time of the test in the deck and engine logbooks.
Test the bridge emergency stop, which must work independently of bridge control (SOLAS II-1/31.2.3). On ships built on or after 1 July 2004, check the officer of the watch gets a warning before an automatic slowdown or shutdown (II-1/31.2.10).
Post a notice at the bridge console, the ECR and the OD box saying exactly what this ship's CPP does on an electric or hydraulic failure (SOLAS II-1/31.2.7; OCIMF SIRE 2.0 inspectors expect it). Drill watch engineers on local pitch control by solenoid or hand lever (II-1/31.2.6).
Check the bridge pitch indicator (SOLAS II-1/31.2.8.2) agrees with the ECR display and the mechanical pointer on the OD box at full ahead, zero thrust and full astern.
A CPP sends high-pressure oil from a power pack or gearbox-driven pump into a non-rotating oil distribution (OD) box at the forward end of the hollow shaft. From there, oil runs down tubes inside the shaft to a servo piston in the propeller hub, or to an inboard servo cylinder that moves a push-pull rod. Working pressures, oil grades and valve settings differ a lot between designs and ice classes. Take every pressure, temperature and clearance figure from the propeller maker's manual.
When the bridge reports pitch hunting, a lag, or pitch that will not reach the order at high speed, first separate electronic faults from internal leaks. Compare the pitch demand signal (4-20 mA or CAN bus) with the feedback from the LVDT or potentiometer on the OD-box yoke. Loose linkages, worn rod ends, damp terminal boxes or thermal zero shift make the controller hunt around the set point. That heats the oil and wears the OD-box sealing rings. Next, check the proportional valve. Fine silt, rubber fragments or varnish from old oil can make the spool stick. It then ignores small corrections until the error grows and it jumps past the set point.
If local control at the OD box still gives slow astern movement, frequent standby pump starts or hot return oil, suspect an internal leak. Likely places are the OD-box high-pressure seals, cracked O-rings on the transfer tubes, or worn piston rings in the hub servo cylinder. On ships with a shaft generator (PTO) running at constant shaft speed, the load control must cut pitch automatically when engine torque nears the maker's limit. It must also do so when heavy seas make propeller torque swing. This protects the engine from overload and the shaft generator from frequency dips.
Trend CPP standby pump starts, cooler outlet oil temperature and duplex filter differential pressure every watch against the propeller maker's baselines.
Inspect return-line magnetic plugs and filter elements at each changeover for white metal, bronze or rubber particles that point to OD-box seal or hub crank-pin pad wear.
Verify zero-pitch interlock switches, clutch permissives and the PTO pitch-reduction overload protection before engaging shaft generators or starting main engines.
Test hydraulic oil cleanliness (particle count), viscosity and water content by shore laboratory analysis at the interval in the propeller maker's manual.
A stern tube seal must stop oil leaking out to sea and stop seawater getting in. Oil-lubricated stern tubes do this in one of two ways. The first uses rubber lip seals fed from one or two gravity header tanks. The tanks sit high enough above the waterline to keep oil pressure above sea pressure, as the seal maker designs. The second uses an air-regulated seal. Controlled air in an aft chamber balances the sea pressure, and any small oil or water leak drains to a tank inboard.
In US waters, the EPA 2013 Vessel General Permit called for EALs at oil-to-sea interfaces unless technically infeasible. Those terms carry on under the Vessel Incidental Discharge Act until the new federal rules take effect. Charterers may ask for EALs too. So stern tubes, CPP hubs, thrusters and fin stabilisers may run on EALs, and many of these are synthetic esters. Unlike mineral oil, an ester reacts with free water when warm. It splits into acids and alcohols, so the Total Acid Number (TAN) rises and the viscosity changes. Seals made of the wrong rubber can soften, and the bearing oil film gets thinner. Even a small net or rope wrap that lifts the aft seal can spoil the oil fast if daily drain-pot checks are missed.
IACS UR Z21 Rev.4 covers surveys of propeller shafts and tube shafts. For oil-lubricated shafts the base survey interval is 5 years, using one of three methods. Method 1 draws the shaft and includes inspection of bearings and seals and crack testing of the forward taper. Method 2 removes the propeller and crack-tests the forward taper without drawing the shaft. Method 3 is an in-place check of bearing wear, seals and liners, with no shaft or propeller removal. Methods 2 and 3 each have conditions that must be met first.
The method allowed depends on how the propeller is fitted. Flanged shafts may use any of the three methods every 5 years (para. 2.3.1.1). Keyless shafts may use Method 3 every 5 years, but Method 1 or 2 must be done at least every 15 years, with one 3-month extension at most (para. 2.3.1.2). Keyed shafts may use only Method 1 or 2 (para. 2.3.1.3). Closed-loop fresh-water-lubricated shafts need a Method 1 survey at least every 15 years, again with one 3-month extension at most (para. 2.4).
To use Method 2 or 3 on an oil-lubricated shaft, there must be no grinding or welding repairs to the shaft or propeller. The surveyor must see an oil sample checked for water (para. 1.2.13). Service records, such as oil and bearing temperatures and oil consumption, must be kept (para. 1.2.12). The oil must be analysed at least every 6 months, using IACS Recommendation 36 as guidance (para. 1.2.14). A typical analysis tracks water, viscosity, TAN and wear metals.
Log stern tube and CPP hub header-tank levels, air-seal flow and pressure (where fitted) and drain-pot water or oil every watch. Investigate any sudden change in consumption at once.
Where high and low stern tube header tanks are fitted, change over between loaded and ballast draughts exactly as the seal maker says, so oil pressure neither blows past the aft seals nor falls below sea pressure.
On EAL-filled stern tubes and CPP hubs, keep seal compatibility records on board and keep water content below the EAL and seal makers' limits. Send shore lab samples at least every 6 months (IACS UR Z21 Rev.4 asks for this where Method 2 or 3 surveys are used).
Inspect the rope guard and net cutters at every drydocking or approved in-water survey, and confirm which shaft survey methods your shaft may use (flanged, keyless or keyed) under IACS UR Z21 Rev.4.
A propeller shaft runs on oil films in the engine bearings, thrust bearing, gearbox and stern tube bushes. These films insulate it from the hull, so the shaft can build up a voltage. Sources include the galvanic cell between the bronze propeller and the steel hull, return current from impressed-current cathodic protection (ICCP), and stray magnetic fields in motors or alternators. If the earthing path through the slip-ring fails, the voltage discharges through the thinnest oil film. This can be at the aft stern tube bush, the thrust pads, the gear mesh or the crankshaft journals.
These sparks (electrical discharge machining, EDM) leave a dull, frosted pitting on white metal and journals and speed up carbon build-up in the oil. Loss of the earth path can also reduce the cathodic protection reaching the propeller and raise its corrosion risk. Keeping the earthing device in good order is part of normal machinery maintenance.
Upkeep is simple if two common mistakes are avoided. First, oil mist or grease on the slip-ring band forms a glaze under the brushes that blocks current. Wipe the track clean and use only the cleaner or burnishing stone the earthing-device maker approves. Never use coarse emery cloth, which scores the silver band and ruins brush seating. Second, where a shaft millivolt monitor is fitted with its own sensing brushes, log the peak and RMS readings at sea load. Check they stay below the limit set by the earthing-device and engine or gearbox makers.
Inspect the shaft earthing slip-ring and brush holders weekly: oil-free track, brushes moving freely, correct spring tension and intact braided copper bonding straps to the hull.
Clean a glazed slip-ring band only by the method in the earthing-device maker's instructions. Never use coarse emery paper or grease on current-carrying tracks.
Log shaft-to-hull millivolt readings across the sea-load rpm range (using the monitoring brushes) against the maker's limit, and renew brushes before they reach the wear-line marks.
Check propeller bonding during drydocking, including CPP hub-to-blade bonding links where the propeller maker specifies them, so the ICCP or sacrificial anodes protect the blades.
The EEXI rules in MARPOL Annex VI (Regulations 19, 23 and 25, added by MEPC.328(76) on 17 June 2021) apply to many ship types of 400 GT and above. The attained EEXI is recorded in the EEXI Technical File and on the International Energy Efficiency (IEE) Certificate. Many existing ships meet the required EEXI with an overridable shaft power limitation (ShaPoLi) or engine power limitation (EPL).
These systems follow the 2021 ShaPoLi and EPL guidelines in MEPC.335(76), adopted on 17 June 2021. MEPC.375(80), adopted on 7 July 2023, changed the reporting rules in paragraphs 3.2 and 3.4 and added a reporting appendix. MEPC.390(81), adopted on 22 March 2024, changed paragraphs 2.1.1.3, 2.2.1 and 3.3 and added Section 6. On a ShaPoLi ship, the system works out shaft power from torque and shaft speed, added up over all shafts (paragraph 1.1). It caps power at the limited value (MCR_lim), while the full rated power stays available as a reserve.
MEPC.390(81) Section 6 asks for the pilot card, wheelhouse poster and manoeuvring booklet to be updated, as they apply, with manoeuvring data at full power and at limited power. Under IMO Resolution A.601(15), a pilot card is recommended for every SOLAS ship. The wheelhouse poster and manoeuvring booklet are for ships 100 m long or more, and for every chemical tanker and gas carrier whatever its size. The OMM states how long it takes to lift the limit (MEPC.335(76) paragraphs 4.3.1.11 and 4.3.2.7).
MEPC.390(81) paragraph 3.3 separates two cases. In the first, the crew lifts the limit early because they expect danger, then never uses the extra power. They note the event in the bridge and engine-room logbooks. The engine-room log also shows the power actually used while the limit was off. The limit is put back on promptly, and the reset is logged in both books. The report to flag and port in paragraph 3.4 is tied to actual use of the reserve.
In the second case, the extra power is actually used. A ShaPoLi system keeps a continuous record of shaft speed, torque and power, and an EPL system records when it runs unlimited (paragraph 2.2.5). The master signs an entry on the OMM record page kept on board (paragraph 3.2). It lists the ship's type, IMO number and tonnage, and its limited and full power. It gives the position and time when use of the reserve began and when the limit was restored. It also states the reason. If weather was the reason, it gives the Beaufort force and wave height, or the ice state. If the reason was avoiding danger, it includes evidence. The system's own records for the period are attached. The evidence and records (items 3.2.8 and 3.2.9) go to the flag or RO for checking.
Under paragraph 3.4, the ship then reports without delay to its flag, or the RO that issued its IEE Certificate, and to the destination port authority. The report carries the paragraph 3.2 details. Under paragraph 3.5, the crew puts the limit back, or fits a replacement, as soon as it is safe. The flag or RO then confirms this at the first chance, using evidence such as power logs or photos of a renewed seal. Any fault in the limitation system is reported under paragraph 3.6.
Under IMO Resolution A.1206(34), PSC officers check the IEE Certificate (Appendix 18, paragraph 2.1.7) and the EEXI Technical File and verified OMM (Appendix 12, Part B, items 25 and 26). A missing IEE Certificate or EEXI Technical File may be a ground for detention (Appendix 2). Lifting the limit without the right reports gives the PSCO a reason to inspect more closely (Appendix 18, paragraph 2.5.3.15). PSCOs also check that the system is fitted, certified and put back correctly (paragraphs 2.6.12, 2.6.13.1 and 2.6.14.11). If they find an override that was never reported, MEPC.335(76) paragraph 3.7 asks for the limit to be restored at once, with the flag or RO attending at that port.
Keep the flag- or RO-verified OMM on board with the IEE Certificate and EEXI Technical File, ready for inspection (MARPOL Annex VI Regs. 5.4, 23 & 25, MEPC.335(76) Section 4, IMO Res. A.1206(34) Appendix 12 Part B items 25-26).
Check the pilot card, wheelhouse poster and manoeuvring booklet (as they apply under IMO Res. A.601(15)) show manoeuvring data at both limited and full power (MEPC.390(81) Section 6). Check the OMM states the time needed to lift the limit (MEPC.335(76) paras. 4.3.1.11 & 4.3.2.7), and tell embarking pilots.
Train bridge and engine officers on the OMM override and reset steps, and repeat the training after key crew changes. Keep any password or PIN on board and known, so nobody hesitates to release power when the ship or a life is at risk (MARPOL Annex VI Reg. 3.1, MEPC.390(81) para. 2.2.1).
Keep the two cases apart. If the limit is lifted early but the reserve is not used, log the event, the power used and the reset in both logbooks (MEPC.390(81) para. 3.3). If the reserve is used, keep the system records and have the master sign the OMM record page (MEPC.375(80) para. 3.2). Then report without delay to the flag or RO and the destination port authority (para. 3.4), and restore the limit for flag or RO confirmation (para. 3.5).
Frequently Asked Questions
What does SOLAS Regulation II-1/31.2.7 require if the bridge controllable pitch propeller remote control fails?
Regulation 31.2.7 asks for an alarm when remote propulsion control fails. It also asks for the set speed and thrust direction to be kept until local control is working, unless the flag accepts that this is impracticable. Where the alarm sounds, and whether it is audible and visual, is set by class rules and the maker. CPP failure modes also differ between ships. Some hold pitch, while others can go to full ahead, full astern or zero pitch. OCIMF SIRE 2.0 inspectors expect the ship's own failure mode to be posted on the bridge and in the engine room. Crews should also drill local pitch control (SOLAS II-1/31.2.6).
Why does seawater ingress degrade biodegradable EAL stern tube lubricants faster than mineral oil?
Many Environmentally Acceptable Lubricants (EALs) used in stern tubes and CPP hubs are synthetic esters. In US waters, the EPA Vessel General Permit terms, carried on under VIDA, call for EALs at oil-to-sea interfaces unless technically infeasible. When seawater gets past a damaged aft seal and mixes with the warm oil, the ester reacts with the water and forms organic acids and alcohols. The Total Acid Number (TAN) rises and the viscosity shifts. Seals can swell and the bearing can wipe if this is not caught early. Check the drain pot daily and send oil to a shore lab at least every 6 months (IACS UR Z21 Rev.4 asks for this where Method 2 or 3 surveys are used).
When can a ship override its EEXI SHaPoLi or EPL power limit, and who must be notified?
Only to keep the ship safe or to save life at sea (MARPOL Annex VI Regulation 3.1), never to make up time. The master or officer of the watch makes the call. If the limit is lifted early but the extra power is not used, the crew logs the event, the power used and the reset in the bridge and engine-room logbooks (MEPC.390(81) paragraph 3.3). If the extra power is used, the system keeps its records and the master signs the OMM record page (MEPC.375(80) paragraph 3.2). The ship reports without delay to its flag or RO and to the destination port authority (paragraph 3.4). The crew restores the limit once safe, and the flag or RO confirms it (paragraph 3.5).
How does propeller shaft earthing prevent main-bearing and gear-tooth spark erosion?
Oil films insulate the turning shaft from the hull. Galvanic current between the bronze propeller and the steel hull, plus ICCP and stray magnetic currents, can build a voltage on the shaft. A clean slip-ring with free-moving silver-graphite brushes bonds the shaft to the hull and keeps the voltage low. If oil glaze or worn brushes break that path, current jumps across thin bearing and gear oil films. This causes frosted spark-erosion (EDM) pitting.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/controllable-pitch-propeller-stern-tube-seal-and-shapoli-override-guide/