LNG Fuel Gas Supply System (FGSS) & Gas Valve Unit (GVU) Purge and Tightness Checklist
IGF Code checklist for LNG fuel gas supply systems (FGSS), gas valve unit (GVU) double block-and-bleed valves, tightness testing, nitrogen purging and BOG.
Under the IGF Code (IMO Resolution MSC.391(95)), each gas supply line has a manual stop valve and an automatic master gas fuel valve outside the machinery space (9.4.2), and each gas consumer has a double block-and-bleed arrangement: two fail-to-close shut-off valves in series with a fail-to-open vent valve between them (9.4.4–9.4.5). The double block-and-bleed valves are usually grouped with pressure regulation and inert-gas connections in a gas valve unit (GVU).
Many GVU designs run an automatic tightness (valve-proving) test before gas admission is allowed, to confirm that the shut-off and vent valves are not leaking.
Double-wall gas pipes or ducts in machinery spaces need mechanical underpressure ventilation of at least 30 air changes per hour (9.6.1 and 13.8.1); gas detection in those ducts alarms at 30% LEL and shuts off the gas supply at 60% LEL on two detectors (Chapter 15, Table 1).
Valve-proving sequence set by the GVU maker: the space between the two shut-off valves is pressurised or vented and the pressure change monitored over a set time
Gas mode is blocked if the pressure change exceeds the maker’s limit, indicating a leaking shut-off or vent valve seat
Review tightness test pass/fail logs and include the GVU valves in the PMS and class survey programme
Post-Stop Venting & Nitrogen (N2) Purge
When the master gas fuel valve shuts automatically, the gas branch downstream of the double block-and-bleed valves is vented automatically (IGF Code 9.4.7); where fitted, nitrogen then purges the line to the vent mast
Gas left in engine-room piping is a hazard during maintenance and can upset the next gas start
Check nitrogen supply pressure, non-return valves and purge-complete confirmation before any gas pipe flange is opened
Double-Wall Gas Pipe / Duct Ventilation
Mechanical underpressure (extraction) ventilation of at least 30 air changes per hour; may be reduced to 10 per hour if the duct is filled with nitrogen automatically on gas detection (IGF Code 9.6.1.2 and 13.8.1)
Loss of ventilation in a duct inside a machinery space shuts off the gas supply to that space (IGF Code Chapter 15, Table 1)
Test duty/standby fan changeover and the loss-of-ventilation alarm at the intervals in your PMS
Gas Detection Loop
Alarm at 20% LEL and safety action at 40% LEL on two detectors (IGF Code 15.8.6); in ventilated ducts around gas pipes in machinery spaces, alarm at 30% LEL and shutdown at 60% LEL (15.8.7 and Table 1)
Poorly calibrated detectors risk late leak detection or nuisance gas trips
Calibrate with certified span gas as the detector maker requires and record results in the gas detection log
1. Inside the Gas Valve Unit (GVU): Pressure Regulation, Double Block-and-Bleed & Valve Proving
The gas valve unit (GVU), either in a gas-tight ventilated enclosure in the engine room or in a dedicated GVU space, is the safety and pressure-control interface between the ship’s LNG fuel gas supply system (FGSS) and each dual-fuel or spark-gas engine. Gas arrives from the FGSS vaporiser and heater at the pressure and temperature the system is designed for, and the GVU pressure control valve sets the gas pressure to the engine in step with the engine’s charge-air pressure.
Before an engine may start on gas, many GVU control systems run a valve-proving sequence. Typically, the space between the two shut-off valves is pressurised and isolated to show that the downstream shut-off valve and the vent valve hold pressure, then vented and isolated to show that the upstream shut-off valve does not let gas through from the supply. The exact steps, times and limits are set by the GVU maker.
Check the GVU gas filter differential pressure regularly; fine particles and oil carry-over from boil-off gas (BOG) compressors are a common cause of shut-off valve and gas admission valve seat leakage.
Check that the instrument air supplying the GVU valve actuators meets the maker’s dryness, cleanliness and pressure requirements.
Check that the vent mast outlet and any flame screen are clean, unobstructed and drained of rainwater.
Confirm that the remote emergency stops work from each location required by IGF Code 15.11.4 (such as the navigation bridge, engine control room and fire control station) and that the master gas fuel valve can be operated from the locations listed in 9.4.3.
2. FGSS Vaporisers, Gas Temperature & Methane Number (MN)
On LNG-fuelled ships, fuel gas reaches the GVU either as boil-off gas (BOG) from the tank vapour space or as LNG vaporised in a heat exchanger, often heated by a glycol-water circuit. Methane boils at a lower temperature than ethane and propane, so BOG is mostly methane and has a high methane number, while LNG that has aged or is force-vaporised carries more ethane and propane and has a lower methane number.
If the supply switches quickly from BOG to forced vaporisation without the engine control allowing for the change in methane number, or if heater fouling lets gas that is too cold reach the GVU, the engine may knock or GVU components may be exposed to temperatures below their rating.
Check the methane number and composition on the LNG bunker delivery note after every bunkering (the form annexed to the IGF Code includes both) and enter the methane number in the engine control system if it needs manual input.
Monitor gas heater outlet temperature and the low-temperature alarm and trip set by the FGSS maker, to protect GVU seals and prevent liquid carry-over.
Verify glycol-water circulation pump auto-standby start and check the gas detection on the glycol expansion tank.
Track fuel tank pressure and temperature against the design range: IGF Code 6.9 requires them to be kept within the design range at all times, and venting is not acceptable for pressure control except in an emergency.
3. Preparing Engineers for IGF Code Surveys & Vetting
Whether you are preparing an LNG carrier, a dual-fuel container ship or an onshore LNG-to-power facility, combining hands-on GVU fault drills with structured inspection checklists reduces surprises during class surveys and vetting.
Run Lab 01 (GVU tightness test, nitrogen purge and diesel-to-gas switchover) free for 5 minutes in our simulator at /lng-academy/; Lab 04 (double-wall ventilation loss and gas alarm recovery) is part of the full course.
Cross-check ship-shore LNG bunkering ESD link test records using the SeaReady IGC & IGF Code Checklist.
Book a 1-hour technical consultancy session ($350 USD + 5% sales tax) at 12:00 PM – 1:00 PM Central Time (CT) to review recurring FGSS or GVU alarms with Marvel Solutionz.
Frequently Asked Questions
Why does a Gas Valve Unit (GVU) fail its pre-entry tightness test?
A tightness test fails when the pressure trapped between the double block-and-bleed valves rises or falls by more than the maker’s limit during the test time. Common causes are debris or pipe scale on a valve seat, a slow solenoid pilot, or low actuator air pressure.
What ventilation rate does the IGF Code require for double-walled gas piping?
The IGF Code (IMO Resolution MSC.391(95), 9.6.1.2 and 13.8.1) requires the space around gas fuel piping in a ventilated pipe or duct to have mechanical underpressure ventilation of at least 30 air changes per hour. This can be reduced to 10 air changes per hour if the duct is filled with nitrogen automatically when gas is detected. The alternative in 9.6.1.1 is a double-wall pipe whose annular space is kept with inert gas at a higher pressure than the gas fuel.
When must the gas fuel line be vented or purged?
IGF Code 9.4.7 requires the gas branch downstream of the double block-and-bleed valves to be ventilated automatically when the master gas fuel valve shuts down automatically. Where the system has a nitrogen purge, the maker’s procedure sets when it runs, and gas piping must always be made gas-free before it is opened for maintenance.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/lng-fgss-and-gvu-double-block-and-bleed-purge-checklist/