Key Takeaways (TL;DR)

  • When two or more synchronous generators run in parallel on an islanded marine switchboard or onshore power-plant bus, governor speed droop shares active power (kW) while the Automatic Voltage Regulator (AVR) reactive droop (quadrature current compensation) shares reactive power (kVAr).
  • Unbalanced AVR voltage setpoints or reversed droop CT connections cause circulating reactive current (one alternator over-excited with lagging power factor, the other under-excited with leading power factor), risking stator over-current or a loss-of-excitation (ANSI 40) trip.
  • Routine checks of brushless rotating rectifier diodes, winding insulation resistance and polarisation index (IEEE 43), and reverse power (ANSI 32), loss of field (40), voltage-restrained overcurrent (51V) and frequency (81) protection settings help prevent cascade blackouts.

Generator Parallel Operation Faults, Electrical Signatures & Corrective Actions

Fault / Trip ConditionPrimary Electrical SignatureRoot Cause on Gas / DF / Marine SetsImmediate Corrective Action
kVAr Circulating Current / Power Factor SplitSame bus voltage, but one generator shows high current at a low lagging power factor while the other shows low current or a leading power factorAVR voltage setpoint mismatch, reversed droop CT connections, or unequal reactive droop settings between AVRsMatch no-load terminal voltages closely before synchronising, check droop CT polarity, and set the same reactive droop on all sets
ANSI 32 Reverse Power TripBreaker trips during unloading or after a gas trip when the set starts to motor (draw power from the bus)Governor speed reference not lowered cleanly during unloading, a sluggish fuel actuator, or closing the breaker with the incoming set running slowClose the breaker only with the incoming set running slightly fast (synchroscope turning slowly in the “fast” direction), and set reverse power pickup and time delay to the engine maker’s and class requirements
ANSI 40 Loss of Excitation / Field TripGenerator draws heavy leading reactive current (−kVAr) from the bus, terminal voltage sags and the rotor may slip polesOpen or shorted rotating diode on the brushless exciter, AVR power-stage failure, or a tripped excitation field breakerIsolate the generator, disconnect the rectifier bridge leads, and test each rotating diode (forward and reverse) and the surge suppressor with a suitable diode tester
Active Power (kW) Hunting in ParallelRhythmic kW and current swings between generators while bus frequency fluctuatesNoise on the isochronous load-sharing communication line, aggressive governor PID gains, or cylinder misfire / GVU gas pressure oscillationCheck load-sharing line termination and screening, check cylinder EGT spread, and switch temporarily to speed-droop mode to isolate the cause

1. Eliminating Circulating kVAr Currents & Tuning AVR Quadrature Droop

On a paralleled AC busbar, terminal voltage and frequency are common to every connected alternator. If Generator A's Automatic Voltage Regulator (AVR) has a slightly higher internal voltage setpoint than Generator B's, Generator A attempts to raise the bus voltage while Generator B attempts to lower it. Because the bus voltage cannot take two values at once, a circulating reactive current (I_circ) flows between the two stator windings, lagging by nearly 90 degrees in the over-excited machine and leading in the under-excited machine.

Reactive droop (quadrature current compensation) prevents this by feeding a current transformer (CT) signal from one phase into the AVR sensing circuit. As lagging reactive current rises, the AVR lowers its voltage reference slightly, by the droop percentage set at rated reactive load, so paralleled generators share reactive load in proportion to their ratings.

  • Before paralleling after an overhaul or AVR replacement, run each generator alone at rated speed and match no-load line-to-line voltages closely using a calibrated true-RMS meter.
  • Verify that all paralleled generators use the exact same phase for their AVR droop CT and that CT secondary S1/S2 polarity is not inverted (an inverted CT causes positive reactive feedback and immediate kVAr runaway).
  • Confirm that power-factor controllers or PMS reactive-load-sharing loops are disabled while setting baseline AVR quadrature droop potentiometers or digital parameters.
  • Check that generator stator winding temperatures (PT100 RTDs) remain balanced across all three phases during peak reactive loading.

2. Testing Brushless Rotating Diodes, Insulation Resistance & ANSI Protection Relays

Modern medium-speed dual-fuel, spark-gas and marine auxiliary alternators usually use brushless excitation: the AVR feeds DC current into a stationary exciter field winding, inducing three-phase AC in the rotating exciter armature, which is rectified by a shaft-mounted rotating diode bridge (usually six diodes) and fed directly into the main rotor field.

If one rotating diode fails open-circuit, the AVR increases exciter field current to maintain stator voltage, overheating the exciter and introducing a characteristic ripple on the DC excitation current. If a diode fails short-circuit or the surge suppressor varistor breaks down, excitation collapses and trips the generator on ANSI 40 (Loss of Excitation) or under-voltage.

  • During scheduled outages, disconnect the main rotor leads from the rotating rectifier heat-sinks before testing individual diodes and surge varistors; never apply high-voltage Megger insulation tests across connected AVR electronics or rotating diodes.
  • Measure insulation resistance and polarisation index (PI = R10 min / R1 min) on stator and rotor windings as described in IEEE 43, correct the readings for winding temperature, and compare them with the minimum recommended for the insulation class and with previous results.
  • Secondary-injection test the reverse power (ANSI 32), loss of field (ANSI 40), voltage-restrained overcurrent (ANSI 51V) and generator differential (ANSI 87G) relays, and record trip times for class and insurer audits.
  • Book a 1-hour technical consultation ($350 USD + 5% sales tax) at /book-consultancy/ or enquire via /power-plant-consultancy/ for generator parallel tuning, outage planning, or protection relay reviews.

Frequently Asked Questions

Why do two paralleled generators have different power factors and stator currents at the same kW load?

Active power (kW) is controlled by the engine governor, whereas reactive power (kVAr) and power factor are controlled by the generator AVR. If one generator carries high amps at a low lagging power factor while the other shows a high or leading power factor, their AVR voltage setpoints or quadrature droop settings are mismatched, driving circulating reactive current between the stators.

How do you detect a failed rotating diode on a brushless generator without dismantling the rotor?

Before shutdown, a rise in AVR exciter field current at normal load and a ripple in the exciter field current point to an open-circuit rotating diode. Once the engine is stopped and locked out, open the exciter inspection covers, disconnect the diode leads from the bridge, and check forward voltage drop and reverse blocking on each diode with a diode tester, comparing the readings across the bridge.

Can Marvel Solutionz source electrical test instruments and engine-room spares for port calls?

Yes. Marvel Solutionz, based in Kenner, Louisiana, can source test instruments and engine-room spares through our ship chandling service. Availability, suppliers and delivery arrangements are confirmed directly for each request.

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.