LNG Boil-Off Gas (BOG) Compressor, Gas Combustion Unit (GCU), Reliquefaction & Tank Pressure Control Troubleshooting Guide

IGC Code Ch. 7, 8, 13 & 16 and IGF Code 6.7-6.9 guide to LNG boil-off gas compressors, GCU 535 °C uptake limits, reliquefaction & tank pressure hold.

← All technical guides · Category: LNG FGSS & GVU · Updated: · 12 min read

Key Takeaways (TL;DR)

  • Both IMO gas codes ban routine venting of LNG vapour to control tank pressure. Venting is allowed only in an emergency (2014/2016 IGC Code 7.1.3 for gas carriers, IMO Resolution MSC.370(93); IGF Code 6.9.1.2 for other gas-fuelled ships, IMO Resolution MSC.391(95)). On IGF ships, fuel tanks not built for full vapour pressure must stay below the pressure relief valve (PRV) set pressure for at least 15 days (IGF 6.9.1.1). The test case is a full tank at its normal working pressure, with the ship idle and making only domestic power. The design temperatures for this are 32 °C sea water and 45 °C air (IGF 6.9.2.1).
  • Typical causes of an unplanned rise in tank pressure fall into five groups. The boil-off gas (BOG) compressor's anti-surge recycle valve hunts, or liquid reaches its suction. Nitrogen (N2) seal-gas pressure is lost, or the bulkhead shaft seal runs hot. The Gas Combustion Unit (GCU) trips on a fan fault or a dirty flame scanner, with uptake gas heading for the 535 °C limit (IGC 7.4.1.1). CO2 or moisture freezes inside the reliquefaction cold box. Or ventilation is lost in the compressor room or the gas ducts.
  • Inspectors look at the same safeguards. Port State Control works from IMO Resolution A.1206(34) Appendix 2, which lists defective cargo-area ventilation or gas detection. SIRE 2.0 Questions 8.5.2 and 8.6.7 cover the GCU and the nitrogen supply, and CDI Question 5.23.82 covers the bulkhead shaft seals. Check that each tank has at least two PRVs (IGC 8.2.1, IGF 6.7.2.2) and that cargo compressors stop on low suction pressure or fire (IGC 16.5.2.2). Prove the GCU purges with N2 after shutdown and with air before relight (IGC 7.4.4.3 and 7.4.4.4). Keep the IGC (% LFL) and IGF (% LEL) gas-detection setpoints apart, because they differ (see section 5).

LNG Tank Pressure Control, BOG Compressor, GCU & Reliquefaction Fault-Finding Matrix

Observed Symptom or TripAffected Subsystem or Statutory InterlockPrimary Mechanical, Process or Control CauseImmediate Engineering Verification & Corrective Action
BOG header pressure swings, compressor surge and high suction or discharge temperature alarmLD / HD BOG compressor anti-surge recycle loop and aftercooler (IGC 16.5, IGF 9.9 & 15.6.1)A sticking recycle valve positioner, I/P drift, or a PID loop not tuned for changing vapour density. Cold, nitrogen-rich boil-off after loading behaves very differently from warm vapour in ballast. Recycled gas that is not cooled enough also causes trips.Tune recycle control to the maker's manual and the approved Cargo System Operation Manual (CSOM). Check aftercooler cooling flow and the precooler or spray. Check the suction knock-out drum level so no liquid reaches the compressor (IGF 9.9.3). Stroke and calibrate the anti-surge valve.
BOG compressor trip on low seal-gas differential pressure or high bulkhead shaft seal or bearing temperatureDry N2 seal-gas buffer and gastight bulkhead shaft seal (IGC 3.3.4, IGF 9.9.1 & 15.6.2)A blocked seal-gas filter, low N2 generator pressure or poor dew point, an iced dP transmitter impulse line, worn labyrinth or carbon rings, or a low seal-oil pot at the bulkhead shaft seal.Do not restart until the fault is found and put right (IGF 15.11.1). Check N2 supply pressure, dew point and purity (oxygen at most 5% under SIRE 2.0 8.6.7). Check seal-gas filter dP and seal-gas dP against the maker's limits. Check bulkhead seal lubrication and bearing temperature (IGF 15.6.2), and the maker's crankcase or distance-piece monitoring.
GCU burner lockout after an engine gas trip, or high-high uptake exhaust temperature near 535 °CGCU burners, flame scanners and combustion and dilution air fans (IGC 7.4.1–7.4.4 & 16.2.2)A sooted or wet UV/IR flame scanner, a pilot igniter fault, boil-off with more nitrogen than the burner setting can handle, or a fan drive or damper fault that raises flue-gas temperature.Confirm the burner gas pipe was purged with N2 when the burners went out (IGC 7.4.4.3). Confirm the chamber air purge finishes before relight (IGC 7.4.4.4). Clean the scanner lenses, prove fan airflow and damper linkage, and inspect the liner and refractory.
Steadily rising cold-box gas-side dP, wider temperature approach and less LNG condensate returnedDirect, indirect or N2-cycle reliquefaction cold box and condenser dome (IGC 7.3.1 & 7.8, IGF 6.9.3 & 6.9.6)CO2 or moisture freezing in the brazed-aluminium plate-fin channels, for example from inert gas left after drydock. Nitrogen that will not condense can also blanket the condenser dome.Never push discharge pressure above the maker's limit to force gas through a frozen cold box. Send the nitrogen-rich purge to the GCU, not to atmosphere (IGC 7.3.1.4). Bring standby pressure control on line (IGC 7.8.1, IGF 6.9.6.1). Then run a controlled warm-gas derime to the maker's manual.
Fast fall in cargo or fuel tank pressure toward atmospheric during discharge, reliquefaction or GCU runningTank vacuum protection and low suction pressure stop (IGC 8.3.1, 13.4.2 & 16.5.2.2, IGF 6.7.1.2 & 15.6.1)Not enough shore vapour return during discharge, too much draw by the BOG compressor or reliquefaction plant, or GCU load not cut back as tank pressure falls toward its minimum.Check the low tank pressure alarm on the bridge and in the CCR (IGC 13.4.2). Check the BOG compressor, cargo pump and refrigeration stop before the tank's outside pressure limit is reached (IGC 8.3.1.1 & 16.5.2.2). Restore vapour return or the vaporiser pressure-build loop to the CSOM.
Master gas fuel valve closes on gas detection or loss of ventilation in the gas-consumer space or the gas pipe ductGas-consumer space and double-wall pipe or duct protection (IGC 16.4.3, 16.4.6 & 16.4.8, IGF 9.6.1, 13.8.1 & Chapter 15)An exhaust fan belt or motor failure that drops the duct below 30 air changes per hour, loss of N2 pressure in a pressurised double-wall pipe, or a gas leak reaching the shutdown level.Keep the gas supply shut until the leak or ventilation fault is found and repaired (IGF 15.11.1–15.11.2). Check 30 air changes per hour and the duct underpressure. Test the detectors with certified span gas, and check the pipe venting and N2 purge ran cleanly.

1. IGC Code Chapter 7 vs IGF Code Section 6.9: No Routine Venting, 15-Day Hold & Redundancy

Two IMO codes cover boil-off gas (BOG) handling, and their clause numbers and limits differ, so always quote the code your ship follows. Gas carriers carrying LNG in bulk follow the 2014/2016 IGC Code (IMO Resolution MSC.370(93)). It is mandatory under SOLAS Chapter VII Part C for gas carriers built on or after 1 July 2016 (IGC 1.1.2.1). Paragraph 16.9.2, on using cargo as fuel, was updated from 1 July 2026 by IMO Resolution MSC.566(109). Other ships that burn LNG or other low-flashpoint fuels follow the IGF Code (IMO Resolution MSC.391(95)). It became mandatory under SOLAS Regulations II-1/56 and II-1/57 from 1 January 2017. It was amended by IMO Resolutions MSC.458(101) from 1 January 2024 and MSC.551(108) from 1 January 2026.

Both codes ban routine venting of methane to the atmosphere. IGC 7.1.3 and IGF 6.9.1.2 allow vapour to be vented to control tank pressure only in an emergency. Tanks built to take the full vapour pressure at the upper design ambient temperatures are outside the pressure-control rule. For every other tank, pressure and temperature must stay below the PRV set pressure (MARVS) with sea water at 32 °C and air at 45 °C (IGC 7.2, IGF 6.9.2.1). Four methods are accepted. They are reliquefaction (IGC 7.3, IGF 6.9.3), burning the vapour in engines, boilers or a dedicated GCU (IGC 7.4, IGF 6.9.4), pressure build-up within design limits (IGC 7.5), and liquid cooling (IGC 7.6).

IGF ships add a 15-day holding rule (IGF 6.9.1.1). It covers ships such as container ships, car carriers, bulkers and tankers with Type A, Type B, membrane or low-pressure Type C fuel tanks. Start with the tank full and at its normal working pressure, with the ship lying idle and making only domestic power. The fuel system must then keep tank pressure below the PRV set pressure for 15 days. Both codes also require redundancy (IGC 7.8.1, IGF 6.9.6.1). Losing any one machine, such as a duty BOG compressor, refrigeration compressor or fan, must not stop the plant holding tank pressure and temperature. If control depends on a single heat exchanger, a standby one is needed. The exception is an exchanger with more than 25% capacity above the largest duty it must meet, which the crew can repair without help from shore (IGC 7.8.3, IGF 6.9.6.2).

  • Check whether the ship holds an IGC Certificate of Fitness (MSC.370(93), MSC.566(109)) or follows the IGF Code (SOLAS II-1 Part G, MSC.391(95), MSC.458(101), MSC.551(108)) before quoting any gas-detection or tank-hold clause.
  • Check the deck and engine logs show no routine venting (IGC 7.1.3, IGF 6.9.1.2). Check the approved CSOM or fuel handling manual explains tank pressure control in port, at slow speed and at sea.
  • On IGF ships, check how the 15-day idle hold (IGF 6.9.1.1, at the IGF 6.9.2.1 design temperatures of 32 °C sea and 45 °C air) is met: pressure build-up, generator load, GCU or reliquefaction.
  • Prove standby changeover for single failures on BOG compressors, reliquefaction trains, GCU fans and heat exchangers (IGC 7.8, IGF 6.9.6).

2. LD & HD Boil-Off Gas Compressors: Anti-Surge Hunting, Knock-Out Drums & Dry N2 Seal-Gas Trips

A BOG plant usually has a cold suction header and a liquid knock-out drum. It then has low-duty (LD) compressors for fuel gas or reliquefaction, high-duty (HD) compressors for vapour return and warm-up, coolers and gas heaters. Trip setpoints depend on the tank type and the engine (low-pressure Otto-cycle or high-pressure Diesel-cycle). Take every number from the compressor maker's manual and the approved CSOM, not from fleet rules of thumb. The codes set the duties. The fuel gas supply must be dry, with no liquid carried over (IGF 9.9.3). Cargo compressors must stop by themselves if suction pressure drops too far or a fire is detected (IGC 16.5.2.2). IGF ships need bridge and engine control room alarms for low suction pressure, low and high discharge pressure and compressor running (IGF 15.6.1).

Load changes put the recycle loop to the test. Examples are manoeuvring, or a fast gas trip on one engine. There the double block-and-bleed valves at that consumer close while the others keep running (IGC 16.4.5, IGF 9.4.4–9.4.6). Surplus gas must then recycle quickly through the anti-surge valve and the cooler. The loop may be slow because of a sticking actuator, positioner deadband or poor PID tuning. Vapour density also changes, since cold methane-nitrogen boil-off after loading is very different from warm vapour in ballast. The compressor can then swing between choke and surge. That risks rubbing on centrifugal impellers, or ring wear on oil-free reciprocating stages. Recycling hot gas without enough cooling soon trips the stage on high gas temperature.

Seal gas and the bulkhead seal need the same care. Dry, oil-free nitrogen is fed to the labyrinth or dry-gas seals at a pressure above the crankcase. This keeps methane out of the running gear and oil mist out of the cold gas. Seal-gas differential pressure should follow the maker's limits. SIRE 2.0 Question 8.6.7 covers the nitrogen supply itself: oxygen at most 5%, dew point measured, and CO2 kept low enough to avoid dry ice. On many ships the electric motor sits in a separate motor room. Where the drive shaft passes through the gastight bulkhead, a gastight shaft seal is fitted (IGC 3.3.4). Inspectors check that it is lubricated, maintained to plan and free of gas or oil leaks (CDI Question 5.23.82). Seal and bearing temperatures are monitored (IGF 15.6.2). Typical causes of nuisance trips include iced impulse lines, wet seal-gas filters and empty seal-oil pots.

  • Check the knock-out drum high-level alarm, drain and mist eliminator so no liquid reaches the compressor (IGF 9.9.3).
  • Stroke-test and calibrate the anti-surge or recycle valve, its I/P positioner and the cooler temperature loop to the maker's schedule.
  • Watch N2 supply purity (oxygen at most 5%, SIRE 2.0 8.6.7), dew point and seal-gas filter dP, and keep seal-gas dP within the maker's limits.
  • Test the low suction pressure stop (IGC 16.5.2.2), the pressure alarms (IGF 15.6.1), the shaft seal and bearing temperature alarms (IGF 15.6.2) and the emergency stops (IGC 16.5.2.1, IGF 15.11.4).

3. Gas Combustion Unit (GCU): 535 °C Uptake Limit, Dilution Fans & N2 Purge Sequences

The GCU takes surplus gas when it cannot be burned in engines or reliquefied. That happens when dual-fuel engine load drops near port, while drifting at anchor, or after a main engine gas trip. It also takes nitrogen-rich gas bled from a reliquefaction condenser dome (IGC 7.3.1.4). Burning cargo vapour to control tank pressure is allowed for LNG cargoes only (IGC 7.4.1). No flame may show outside the unit, and the uptake gas must stay below 535 °C (IGC 7.4.1.1 and 16.2.2). SIRE 2.0 Question 8.5.2 checks the GCU alarms, including the 535 °C high-high exit gas trip.

Boil-off quality swings widely, from nitrogen-rich gas after loading to rich methane-ethane vapour from the heel. To burn it steadily and keep the exit gas below 535 °C, the GCU uses a combustion air fan and large dilution air fans. The chamber is air-cooled or refractory-lined and discharges into its own uptake (IGC 7.4.2.1 and 7.4.2.2). It must be designed so unburnt gas cannot collect (IGC 7.4.2.3). A dilution fan trip, a slipped damper linkage, a warped liner or a dirty flame scanner will cause trouble. The GCU then trips on high exit-gas temperature or locks out on flame failure, which can happen just as tank pressure is rising.

IGC 7.4.4 sets five fuel-safety interlocks for the GCU, and none may be bypassed. Gas must shut off unless ignition is proven and kept (7.4.4.1). A manual gas isolation valve must be fitted where it can be reached safely (7.4.4.2). The burner gas pipe must be purged with inert gas (N2) as soon as the burners go out (7.4.4.3). If every burner loses its flame, the chamber must be purged with air automatically before relight (7.4.4.4). There must also be a way to purge the chamber by hand (7.4.4.5). These five interlocks come from the IGC Code. The IGF Code (6.9.4) allows surplus vapour to be burned in consumers or a dedicated GCU. Its own test is capacity: the plant must be shown to cope, including at slow speed or with no gas being used.

  • During planned tests (SIRE 2.0 8.5.2), check the GCU high-high uptake temperature trip is set and tested below 535 °C and no flame shows outside (IGC 7.4.1.1, 16.2.2).
  • Check the GCU has its own uptake, not shared with boilers, engines or incinerators (IGC 7.4.2.1). Inspect fan motors, drive cooling filters and damper actuators.
  • Prove the automatic N2 purge of the burner gas pipe after stop (IGC 7.4.4.3) and the air purge before relight after every burner loses flame (IGC 7.4.4.4).
  • Check the GCU fuel control handles nitrogen-rich boil-off and reliquefaction purge gas without flame lift-off or nuisance trips (IGC 7.3.1.4).

4. Reliquefaction Cold-Box Frosting, 98% Default Filling Limit & Tank PRV / Vacuum Protection

Reliquefaction plants may be direct, indirect, combined or nitrogen-expander (reverse Brayton) types (IGC 7.3.1, IGF 6.9.3). Compressed BOG is cooled and condensed in brazed-aluminium plate-fin heat exchangers, known as the cold box, then returned to the tanks. LNG condenses near -160 °C. At that temperature, traces of CO2, moisture, heavy hydrocarbons or oil freeze onto the fins and expansion valves. CO2 can come from combustion-type inert gas used before gassing-up (SIRE 2.0 Question 8.6.7 asks for CO2 to be kept low enough to avoid dry ice). Moisture can come from worn N2 dryer beds. Early signs are a steady rise in cold-box gas-side dP, a wider warm-end and cold-end temperature approach, and less condensate. Never raise discharge pressure above the maker's limit to force gas through. Switch to standby capacity instead, such as the GCU or a standby train (IGC 7.8.1, IGF 6.9.6.1). Then run a controlled warm-gas derime to the maker's manual.

Filling limits need exact wording. The default filling limit (FL) is 98% of tank volume at the reference temperature (IGC 15.3, IGF 6.8.1). The loading limit is then LL = FL × (ρR / ρL) (IGC 15.5.1, IGF 6.8.1), and IGC 15.4.2 caps any higher filling limit at 99.5%. The reference temperature means different things in the two codes. In the IGF Code it is the temperature at which the fuel's vapour pressure equals the PRV set pressure (IGF 2.2.36). In the IGC Code that meaning applies only where no Chapter 7 pressure and temperature control is fitted (IGC 15.1.3.1). Where Chapter 7 control is fitted, as on LNG carriers with BOG handling, it is the highest cargo temperature at the end of loading, during the voyage or at discharge (IGC 15.1.3.2). On IGF ships, 6.8.2, and 6.8.3 for ships constructed on or after 1 January 2024 (added by MSC.458(101)), allow a loading limit above the reference-temperature figure, up to a ceiling of 95%. The condition is that tank insulation and position make heating by an outside fire very unlikely. Under 6.8.2 a second pressure-control system to Section 6.9 can also qualify. If tank pressure can only be held by burning fuel in consumers, the 6.8.1 loading limit applies.

Separate from pressure control, each cargo tank, deck tanks included, needs at least two PRVs of equal size (IGC 8.2.1), and so does each liquefied gas fuel tank (IGF 6.7.2.2). Only IGC ships built before 2016 had a single-PRV exception for tanks of 20 m³ or less. PRV materials must not melt below 925 °C (IGC 8.2.4.3, IGF 6.7.2.5.3). Up to half the relieving capacity may lift at up to 5% above MARVS, so the valves open in sequence (IGC 8.2.3, IGF 6.7.2.4). In a fire, tank pressure must not rise more than 20% above MARVS (IGC 8.4.1, IGF 6.7.3.1). In an emergency, only one PRV may be isolated at a time (IGC 8.2.9, IGF 6.7.2.6), and the IGF Code requires a physical interlock for this (6.7.2.6.2). The Master supervises it in person, it is logged, and warning signs go up at the control station and at the PRV. The tank must not be loaded until full relieving capacity is back (IGC 8.2.9.4, and IGF 6.7.3.1.1 as amended by MSC.551(108) for ships constructed on or after 1 January 2026). Tanks not designed for an outside pressure difference of 0.025 MPa (250 mbar) need vacuum protection (IGC 8.3.1). That means two independent low-pressure switches, the first giving an alarm and the second stopping all vapour and liquid suction and refrigeration, or approved vacuum relief valves.

  • Trend cold-box gas-side dP, temperature approach and the nitrogen bleed to the GCU every watch. After a refit, check gassing-up dew point and CO2 before cool-down.
  • Work out LL = FL × (ρR / ρL) with the 98% default filling limit (IGC 15.3 and 15.5.1, IGF 6.8.1), using the reference temperature that applies to your ship and code. Test the independent high-level alarms and overfill shut-off (IGC 13.3).
  • Check both tank PRVs are sealed and their set-pressure records are complete (IGC 8.2.5 tolerances: ±10% up to 0.15 MPa, ±6% from 0.15 to 0.3 MPa, ±3% at 0.3 MPa and above). Check the high and low tank pressure alarms match the active PRV settings on the bridge and in the CCR (IGC 13.4).
  • Check vent mast outlets are at least B/3 or 6 m, whichever is greater, above the weather deck (IGC 8.2.10). On IGC ships of 90 m and over, keep them at least the smaller of B and 25 m away from air intakes to gas-safe spaces (IGC 8.2.11), and at least 10 m on IGF ships (IGF 6.7.2.7–6.7.2.8). Check drains and flame screens.

5. 30 ACH Ventilation, IGC (% LFL) vs IGF (% LEL) Gas Shutdowns & MSC.581(110) Space Entry

Ventilation, double-wall piping and gas detection rules differ between the IGC Code (Chapters 12, 13 and 16) and the IGF Code (Sections 9.4 to 9.6, Chapters 13 and 15). Cargo compressor rooms need mechanical ventilation of at least 30 air changes per hour, and next-door electric motor rooms are kept at overpressure (IGC 12.1). IGF fuel preparation and compressor rooms also need at least 30 air changes per hour (IGF 13.6.1). So do the ventilated outer pipes or ducts around gas fuel piping, which run at underpressure (IGC 16.4.3.2, IGF 9.6.1.2 and 13.8.1). On IGF machinery-space ducts, 10 air changes per hour is allowed only where automatic nitrogen filling on gas detection is fitted (IGF 9.6.1.2). The outer pipe may instead be filled with inert gas above the gas fuel pressure (IGC 16.4.3.1, IGF 9.6.1.1). On IGC ships, the master gas fuel valve closes by itself on gas or leak detection, or loss of ventilation, in the space with the gas consumers or in the duct (IGC 16.4.6).

Check gas detection setpoints against the code your ship follows. On IGC gas carriers, fixed detectors in cargo compressor rooms, motor rooms and airlocks give alarms on the bridge and in the CCR (IGC 13.6). The IGC Code does not make them close the master gas fuel valve. The compressor room's own automatic stops are low suction pressure and fire (IGC 16.5.2.2). In the spaces with gas consumers and in the Chapter 16 ducts, gas detection alarms at 30% of the Lower Flammable Limit (LFL) and must close the master gas fuel valve before 60% LFL (IGC 16.4.8). IGC 13.6.17 requires these Chapter 16 safety actions to work before 60% LFL. On IGF ships, detectors in compressor rooms, fuel preparation rooms, tank connection spaces, ducts, airlocks, motor rooms and ESD-protected machinery spaces alarm at 20% of the Lower Explosion Limit (LEL). Two detectors at 40% LEL start the safety shutdown (IGF 15.8.6 and Chapter 15 Table 1). Ventilated ducts around gas fuel pipes in gas-safe machinery spaces alarm at 30% LEL and shut down on two detectors at 60% LEL (IGF 15.8.7). Two IGF Section 9.4 points also matter. The manual maintenance valve under 9.4.8 isolates only the length between itself and its own consumer, not back to the master gas fuel valve. On ships constructed on or after 1 January 2026, automatic venting under 9.4.7 (as amended by MSC.551(108)) empties the whole gas line from the master gas fuel valve to the consumer through the double block-and-bleed valves. On earlier IGF ships it covers the pipe downstream of those valves.

Treat these places as enclosed spaces before anyone goes in: a compressor room after a gas or N2 seal leak, a nitrogen generator or N2-cycle refrigeration room, an N2-purged cold-box casing, a hold or interbarrier space, or a GCU chamber opened for refractory work. Rooms with nitrogen plant should have oxygen monitoring (SIRE 2.0 8.6.7). Test the atmosphere with a SOLAS XI-1/7 meter that reads at least oxygen, flammable gas, H2S and CO. Follow IMO Resolution MSC.581(110), adopted in June 2025. Isolate the plant and ventilate with fresh air, not nitrogen. Test from outside at several levels, with ventilation stopped and the atmosphere settled. Look for a steady 20.9% oxygen, flammable gas below 1% LFL, toxic gases below 50% of their OEL and CO2 below 0.5%. The entry permit lasts as long as the risk assessment allows and never more than 8 hours. It is void at once if the space is left unattended or ventilation stops. Use personal gas monitors, and keep an attendant at the entrance with a rescue hoist and SCBA ready. Emergency Escape Breathing Devices are for escape only, never for entry. Enclosed-space entry and rescue drills are held at least once every two months (SOLAS III/19.3.6).

  • Check at least 30 air changes per hour in compressor rooms and underpressure in ventilated gas fuel ducts (IGC 12.1 and 16.4.3, IGF 9.6.1, 13.6.1 and 13.8.1). Where double-wall pipes are pressurised instead, check the N2 pressure stays above gas fuel pressure. Test the airlock alarms (IGC 3.6).
  • Span-test gas detectors against the code your ship follows. On IGC carriers: 30% LFL alarm, and master gas fuel valve closed before 60% LFL, in gas-consumer spaces and ducts (IGC 16.4.6 and 16.4.8). On IGF ships: 20% LEL alarm and two-detector shutdown at 40% LEL in compressor and fuel preparation rooms, and 30% / 60% LEL in machinery-space ducts (IGF 15.8.6 and 15.8.7).
  • Make sure nobody reopens the master gas fuel valve after an automatic trip until the cause or leak has been found and repaired (IGF 15.11.1–15.11.2).
  • Before entering a compressor room after a gas or N2 leak, a cold-box casing, an interbarrier space or a GCU chamber, test with a SOLAS XI-1/7 meter (O2, flammable gas, H2S, CO). Meet the MSC.581(110) limits (20.9% O2, below 1% LFL, below 50% OEL, below 0.5% CO2, tested with ventilation stopped). Issue a permit whose validity is set by the risk assessment and is never more than 8 hours, void at once if the space is left unattended. Hold SOLAS III/19.3.6 entry and rescue drills at least every two months.

Frequently Asked Questions

Is venting LNG boil-off vapour to the atmosphere allowed for normal tank pressure control?

No. The 2014/2016 IGC Code 7.1.3 (IMO Resolution MSC.370(93), gas carriers) and IGF Code 6.9.1.2 (IMO Resolution MSC.391(95), gas-fuelled ships) allow vapour to be vented to control tank pressure only in an emergency. Tank pressure must be kept below MARVS by reliquefaction, by burning the vapour in engines, boilers or a Gas Combustion Unit (GCU), by approved pressure build-up, or by liquid cooling.

What does the IGF Code 6.9.1.1 15-day tank pressure hold rule require?

IGF 6.9.1.1 applies to fuel tanks that are not built to take the full vapour pressure at the upper design ambient temperatures (32 °C sea and 45 °C air worldwide, IGF 6.9.2.1). For those tanks, the fuel containment and pressure control system must keep tank pressure below the PRV set pressure (MARVS) for 15 days. The starting point is a full tank at its normal working pressure, with the ship lying idle and making only domestic power.

What is the maximum uptake exhaust gas temperature permitted on an LNG Gas Combustion Unit (GCU)?

Under the 2014/2016 IGC Code (7.4.1.1 and 16.2.2), no flame may show outside a GCU, and its uptake exhaust must stay below 535 °C. IGC 7.4.4 also requires gas to shut off unless ignition is proven, an automatic N2 purge of the burner gas pipe after the burners go out (7.4.4.3), and an automatic air purge of the chamber before relight if every burner loses its flame (7.4.4.4).

How do fixed gas-detection alarm and shutdown setpoints differ between the IGC Code and the IGF Code?

On IGC gas carriers, gas detection in the spaces with gas consumers and in the Chapter 16 ducts alarms at 30% LFL and closes the master gas fuel valve before 60% LFL (IGC 16.4.6 and 16.4.8). Detectors in cargo compressor rooms, motor rooms and airlocks give alarms (IGC 13.6), but the IGC Code does not make them close the master gas fuel valve. The compressor room's own automatic stops are low suction pressure and fire (IGC 16.5.2.2). On IGF ships, detectors in compressor rooms, fuel preparation rooms, tank connection spaces, ducts, airlocks and ESD-protected machinery spaces alarm at 20% LEL and start the safety shutdown on two detectors at 40% LEL (IGF 15.8.6). Ventilated ducts around gas fuel pipes in gas-safe machinery spaces alarm at 30% LEL and shut down on two detectors at 60% LEL (IGF 15.8.7).

What causes cryogenic reliquefaction cold boxes to lose capacity and build differential pressure?

Cold boxes run near -160 °C. Traces of CO2 (for example left after gassing-up following drydock), moisture from wet N2 dryers, or heavy hydrocarbons and oil mist can freeze inside the small channels and expansion valves. Gas-side dP then rises and the temperature approach widens. Nitrogen that will not condense can also collect in the condenser dome and block heat transfer until it is bled to the GCU without venting (IGC 7.3.1.4). A frosted cold box needs a switch to standby capacity and a controlled warm-gas derime to the maker's manual.

How many pressure relief valves (PRVs) are required on LNG cargo and fuel tanks, and can one be isolated?

Every cargo tank, including deck tanks, on IGC ships built on or after 1 July 2016 needs at least two PRVs (IGC 8.2.1), and so does every liquefied gas fuel tank on an IGF ship (IGF 6.7.2.2). If a PRV leaks or fails, only one may be isolated at a time (IGC 8.2.9, IGF 6.7.2.6), and the IGF Code requires a physical interlock for this (6.7.2.6.2). The Master supervises it, it is logged, and warning signs go up in the control room and at the PRV. The tank must not be loaded until full relieving capacity is back (IGC 8.2.9.4, and IGF 6.7.3.1.1 as amended by MSC.551(108) for ships constructed on or after 1 January 2026).

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.