IACS UR M78 (Rev.4, Dec 2025) governs DF, GF and fuel-sharing engines across five fuels: methane-rich natural gas, ethane, LPG, alcohols and ammonia. Rev.2 covers TA apps only (1 Jan 2025), while Rev.3 (1 Jan 2027) and Rev.4 (1 Jul 2027) add new-ship contracts.
IACS UR M9 sets crankcase relief sizing (200 mm bore or 0.6 m³ volume, 45 cm² each, 115 cm²/m³ total, 0.2 bar max full lift, UR M66 tested). UR M10 (Rev.5, 1 Jan 2026 cert/contract trigger) sets M10.6 evaluations and M10.9 OMD.
Trunk-piston units burning methanol or ammonia need ERD warning notices and crankcase underpressure above 730 ppm (methanol) or 110 ppm (ammonia) unless justified otherwise (UR M78 2.2.4). Normal ammonia exhaust caps at 110 ppm.
Gas-fuelled inlet and exhaust manifold ERDs require UR M82 type testing (1 Jul 2024 cert/contract trigger). Under UR M78 2.2.3, single propulsion engine installations require self-closing ERDs.
IGF Code (MSC.391(95)) sets high pressure above 1.0 MPa (2.2.22), 30 air changes/h baseline ventilation and Table 1 alarms/shutdowns at 20%/40% LEL (general) and 30%/60% LEL (ER pipe ducts).
MSC.551(108) (1 Jan 2026) adds a retroactive 5 kg fuel-prep extinguisher (11.6.2, due by the first post-1 Jan 2026 survey) and PIC pressure/temp/PRV limits (18.4.1.1.1). MSC.567(109) (1 Jan 2028) adds 6 m Zone 1 vent-mast zones and renumbers 9.4.2.
IACS UR M78 (Rev.4) 1.1.2, 1.2.11, 1.2.16, 2.2.2.2
Rev.4 triggers on or after 1 Jul 2027 (TA apps or new-ship contracts). High pressure exceeds 10 bar g max working pressure. Single-wall piping is for natural gas only (LPG only with special Class agreement).
Audit safety concept, check permitted bellows (more than 10 million cycles) and UR P2.12 hoses (max 1.5 m) and bar gas/low-flashpoint emergency power.
Crankcase relief & OMD
UR M9 (Rev.3), UR M10 (Rev.5), UR M66, UR M78 2.2.4
UR M9: 200 mm bore or 0.6 m³ minimum, 45 cm² each, 115 cm²/m³ total, 0.2 bar max full lift. UR M10 Rev.5 (1 Jan 2026) sets M10.6 and M10.9. Methanol (above 730 ppm) or ammonia (above 110 ppm) trunk-piston units need underpressure unless otherwise justified.
Keep the UR M9.10 manual onboard (M9.11), check UR M66 certificates, verify independent vents and test underpressure-loss fuel isolation and changeover (or GF shutdown).
Manifold ERDs & combustion
UR M82 (1 Jul 2024), UR M78 2.2.3, 3.3.1, Table 2, IGF 10.3.1
UR M82 tests gas-fuelled ERDs (with flame arrester, 4-shot 700 cm²/m³ pipe rig, video at 250 fps or more, tied to turbocharger wheel free area). Single propulsion engine installations need self-closing ERDs.
Match ERD approval to fitted turbocharger wheel free area (4.3.2/7), reject continuous exhaust venting through an open rupture disc into the engine room or other enclosed spaces and verify failed-start purging (IGF 10.3.1.7).
High pressure exceeds 1.0 MPa (2.2.22). 30 air changes/h baseline (15 to 30 ESD on gas detection, 10 with auto N2 filling under 9.6.1.2, or 3 m/s). Alarms/shutdowns: 20%/40% LEL general, 30%/60% ER ducts.
Test 40% and 60% LEL trips (Table 1 fn. 1), verify non-Zone-1 electrical cut in ESD rooms (12.3.3.2) and note ER fire detection raises alarm only.
2026 & 2028 IGF rules
MSC.551(108) (1 Jan 2026) & MSC.567(109) (1 Jan 2028)
Retroactive 11.6.2 (5 kg dry powder in fuel prep room by first survey dated on or after 1 Jan 2026), PIC limits (18.4.1.1.1), Zone 0 interbarrier (12.5.1), 2028 6 m Zone 1 vent-mast and 9.4.2 renumbering.
Equip existing fuel prep rooms now, update pre-bunkering PIC checklists and apply Zone 0 and the 2028 9.4 numbering on newbuildings in scope (2.2.43 or 2.2.44).
Trials, HSSC & PSC
UR M78 §§4-5, UR M71/M51/M88/M72, A.1207(34) & A.1206(34)
DF FAT also tests Cat C surge on gas (unless greater margin documented) and needs the overspeed test only in fuel-oil mode. Uninterrupted sea trials need 1 h minimum per mode. HSSC checks (CI) 2.1.7, (CA) 2.2.5, (CIn) 2.3.5, (CR) 2.4.6.
Keep UR M78 Table 3 (UR M72) NDT and component pressure-test sheets, log annual IGF tests and investigate repeated relief lifts (A.1206(34) App. 6 3.3).
1. IACS UR M78 (Rev.4, Dec 2025): Dual-Fuel, Gas-Only & Five Alternative Fuels
Under IACS Unified Requirement M78 (Rev.4, Dec 2025), classification societies apply one unified safety rulebook across dual-fuel, gas-only and fuel-sharing reciprocating engines. It covers fossil, bio and synthetic grades of five fuel families: methane-rich natural gas, ethane, LPG, alcohols (methanol and ethanol) and anhydrous ammonia. Because each fuel differs in density, flammability and toxicity, UR M78 links directly to the IMO interim safety guidelines for alcohols, IGF/IGC LPG and ammonia cited in its tables.
UR M78 Notes 5 to 7 define three active 2025 to 2027 triggers. Rev.2 (Jan 2024) applies solely to type-approval certification applications dated on or after 1 Jan 2025. Rev.3 (Apr 2025) covers type-approval applications or new-ship contracts dated on or after 1 Jan 2027. Rev.4 (Dec 2025) applies on that twin trigger on or after 1 Jul 2027 across all five fuels.
Under UR M78 1.1.2, engines providing emergency power cannot burn gaseous or low-flashpoint fuels. An emergency generator supplying port electrical power may use any fuel it is designed for in port, never gaseous or low-flashpoint fuel during emergency power duty. Under 1.3.1, the documents for every covered engine include a risk analysis (for information) and an engine safety concept (for approval). Under 1.4.4 and 1.5.2, the analysis must cover piping-enclosure and admission-valve leaks, crankcase accumulation, manifold deflagration, abnormal combustion, control faults and methanol or ammonia toxic releases.
Clauses 1.2.11 and 1.2.16 split fuel gas at 10 bar g maximum working pressure (above 10 bar g is high pressure, while alcohol high-pressure applicability is agreed with Class). Clause 2.2.2.2 limits single-wall piping to natural gas: low-pressure lines in ESD-protected spaces or cases under UR M78 2.2.2.2(b) (citing footnote 18 to IGF 9.6.2). Its Notes rule out the ESD-protected option on IGC ships and do not allow single-wall LPG piping in IGF machinery spaces with consumers unless Class gives it special consideration. Because the clause covers natural gas only, single-wall piping is not available for alcohols, ammonia or ethane.
Where permitted, bellows (2.2.1.2) and flexible hoses (2.2.1.3) must be type approved, leak-monitored and double-walled, except in permitted 2.2.2.2 single-wall systems. Bellows follow IGF 16.7.2 or IGC 5.13.1.2 with vibration endurance above 10 million cycles proven by test or EJMA (or equivalent) calculation. Hoses must also meet UR P2.12, which limits each hose to 1.5 m in length.
Match ship contract and type-approval dates to UR M78 Notes 5 to 7: Rev.2 (TA apps only, 1 Jan 2025), Rev.3 (1 Jan 2027) and Rev.4 (1 Jul 2027, TA apps or new-ship contracts).
Verify the risk analysis (for information) and approved safety concept match the fuel grade and exclude gases or low-flashpoint fuels from emergency power supply (1.1.2).
Check permitted bellows (more than 10 million cycles, EJMA or test) and UR P2.12 hoses (max 1.5 m) are type approved, leak-monitored and double-walled except in permitted 2.2.2.2 single-wall systems.
Physical crankcase relief valve sizing sits in IACS UR M9 (Rev.3 Corr.2, Sep 2007), distinct from IACS UR M10. Under UR M9.1, internal combustion engines reaching 200 mm bore or 0.6 m³ crankcase volume require approved explosion relief valves. Note 1 allows subtracting stationary crankcase parts from gross volume while keeping rotating and reciprocating parts included. Bores up to 250 mm need a valve close to each end of the engine at a minimum (plus a middle valve over eight crankthrows). Above 250 to 300 mm they sit at alternate crankthrows (minimum two) and above 300 mm at every main crankthrow.
Under M9.2 to M9.7, each valve needs 45 cm² minimum free area and 115 cm²/m³ combined gross-volume area. Lightweight spring-loaded ductile discs (or quick-acting self-closing devices) must open fully at 0.2 bar (0.02 N/mm²) or less, prevent air inrush and carry a flame arrester. Rev.3 base rules apply to engine cert apps or new-ship contracts dated on or after 1 Jan 2006, with M9.8, M9.9 and the M9.10 certificate bullet applying from 1 Jan 2008. Valves (with any emission shielding) need UR M66 type testing, and plans follow UR M44. M9.13 requires four markings (maker name and address, designation/size, manufacture date, approved orientation), and the five-part M9.10 manual stays onboard (M9.11).
IACS UR M66 has applied since 1 Jul 2008, and its Rev.4 (Corr.1, Oct 2021) applies to ships contracted on or after 1 Jul 2022. Per valve size and orientation, laboratories run two blasts on three valves plus four reference shots (ten total, series sizes per section 9). Tests use 9.5% +/- 0.5% methane-air inside an L/D 2.5 max rig (vessel volume within 15% either way of the valve's design ratio, normally 115 cm²/m³). A 0.05 mm polythene bag on each valve's first shot (plus video and thermal camera) proves flame arrest, and holding 0.3 bar underpressure for 10 seconds minimum proves gas/air-tight resealing.
IACS UR M10 (Rev.5, Nov 2024) covers engine cert apps or new-ship contracts dated on or after 1 Jan 2026. Under M10.5, crankcase ventilation and air inflow are not permitted in principle. The exception is a gas or low-flashpoint engine that needs ventilation to hold crankcase gas below the LEL (as defined in IEC 60079-10-1, Feb 2021, para 3.6.12). That ventilation is allowed only if it adds no explosion risk, is monitored, and the engine maker's response to a ventilation failure is justified in the safety concept. Where gas is drawn out by a fan, crankcase pressure must not upset the OMD or other safety devices (M10.5.2), and M10.6 requires a detailed crankcase evaluation for gas and low-flashpoint engines. Gear or chain cases need extra relief above 0.6 m³ (M10.2), whereas scavenge spaces open to the cylinders need relief valves, with no size threshold (M10.3). Under M10.9, engines reaching 2,250 kW or exceeding 300 mm bore need Class-approved OMDs (UR M67) or approved bearing monitors (on trunk-piston units only if all bearings including piston pins are monitored). Rated speed under 300 rpm triggers alarm/slow-down, and 300 rpm upward triggers alarm/automatic shut-off.
UR M78 (Rev.4) also sets crankcase rules for gas and toxic fuels. Engines at 0.6 m³ crankcase volume minimum need a maintenance port for inerting, ventilation and gas checks (2.2.4.2), and engine crankcase/sump vents must stay independent (2.2.4.3). On trunk-piston units burning methanol or ammonia (2.2.4.1), a warning notice sits preferably beside the relief devices or at the local control stand detailing personnel ERD hazards. Under 2.2.4.3.1, crankcase and vent piping run at negative pressure above 730 ppm (methanol) or 110 ppm (ammonia) unless justified otherwise by risk analysis in the safety concept. Losing underpressure automatically activates DBB valves (or the alcohol remote shut-off valve per Table 2 fn. 10) and triggers fuel-oil changeover, or GF engine shutdown.
Verify UR M9 valve count, 45 cm² individual area, 115 cm²/m³ combined ratio, 0.2 bar max full lift, M9.13 markings (incl. maker address) and onboard UR M9.10 manual (M9.11).
Check UR M10 (Rev.5) on engine cert apps or ship contracts dated on or after 1 Jan 2026: M10.5 conditional ventilation, M10.6 gas evaluation, M10.2/M10.3 spaces and M10.9 OMD.
On methanol/ammonia trunk-piston units where underpressure applies (above 730 ppm methanol or 110 ppm ammonia, unless justified otherwise), test underpressure-loss fuel isolation and oil changeover (or GF shutdown).
3. Air Inlet, Exhaust Manifold ERDs & Combustion Safety (IACS UR M82 & IGF Ch. 10)
Unburnt gas in a charge-air receiver or exhaust manifold creates a pipe-blast hazard separate from the crankcase. IACS UR M82 (Mar 2023) covers gas-fuelled engines (engine cert apps or new-ship contracts dated on or after 1 Jul 2024). Covered ERDs carry a flame arrester, built as valves, rupture discs or other applicable devices.
UR M82 runs four methane-air pipe blasts (two reference, two device) in an L/D 10 minimum vessel at 700 cm²/m³ (+/- 15%) using 50 J to 100 J ignition. It also calls for pressure logging at 10 kHz or faster and time-stamped video at 250 fps or more (4.3.1, 4.3.2, 4.3.6). A front-end test-vessel rupture disc simulating the turbocharger must open within +/- 10% of the ERD static opening pressure (4.3.2). Under section 7, the approval holds only while the turbocharger compressor or turbine wheel free area matches that 4.3.2 disc, so confirm with Class before fitting a wheel with a different free area.
Under UR M78 2.2.3, fitted ERDs on inlet manifolds, exhaust manifolds and post-turbocharger exhaust pipes require UR M82 approval. Single propulsion engine installations require self-closing ERDs to preserve propulsion and essential load power after activation (load reduction assessed case by case). Continuous exhaust venting via an open rupture disc into enclosed spaces is unacceptable. Pre-mixed engines need a flame arrester ahead of every cylinder head unless the risk analysis and safety concept justify leaving it out (3.3.1).
IGF Chapter 10 reinforces exhaust and crankcase protection. Clause 10.3.1.1 mandates exhaust explosion relief ventilation, and MSC.458(101) added 10.3.1.1.1 for 2024+ ships requiring relief unless designed for worst-case overpressure or safety-concept justified with full exhaust evaluation. Under 10.3.1.7, engines starting on IGF fuels must close the fuel valve automatically if combustion is not detected within the engine-specific time and purge unburnt exhaust gas. Clauses 10.3.1.3 and 10.3.1.4 mandate separate crankcase/sump vents (excluding two-stroke crossheads) and auxiliary-media gas extraction.
UR M78 Table 2 sets 13 baseline parameters unless the 1.4 risk analysis proves otherwise. Where UR M10 applies (fn. 6), fn. 9 triggers trunk-piston shutdown and crosshead slow-down (UR M35 Table 1) on high OMD or bearing temperature. For ammonia, secondary enclosures alarm above 110 ppm and route ventilation air to ARMS (or equivalent) above 220 ppm; Class may accept other levels justified by the risk analysis and recorded in the safety concept (2.2.2.1). Auto master-valve shutdown purges supply piping downstream of DBB valves to the tank, separator or ARMS (3.5.1), and normal exhaust release (including abatement outlets) caps at 110 ppm (3.5.2).
Check all fitted gas-fuelled inlet and exhaust ERD certificates for UR M82 approval and confirm fitted turbocharger wheel free area corresponds to sections 4.3.2 and 7.
On single propulsion engine installations, confirm all manifold ERDs are self-closing and verify no burst disc vents exhaust continuously into enclosed spaces.
Verify failed-start exhaust purge logic (IGF 10.3.1.7) and, on ammonia ships, test 110 ppm enclosure alarm, 220 ppm ARMS routing (or other levels Class has accepted) and downstream DBB purging.
Under the IGF Code (MSC.391(95), effective 1 Jan 2017), machinery spaces use either a gas-safe or ESD-protected concept. Gas-safe rooms enclose all fuel piping in secondary containment so non-Ex gear can operate outside ducts. ESD-protected rooms permit single-wall natural gas piping up to 1.0 MPa (9.7.1, periodically unattended spaces under 5.6.1) paired with redundant ventilation, Zone 1 gear where needed and fast electrical isolation.
IGF 2.2.22 defines high pressure as maximum working pressure exceeding 1.0 MPa (ESD supply caps at 1.0 MPa under 9.7.1). Main gas lines feeding single or grouped consumers pass an external master gas valve (9.4.2) and consumer DBB valves (9.4.4; 9.4.9 lets the two be combined on single-engine sets or where each engine has its own master valve). Gas-safe spaces use inert-gas-pressurised double-wall piping (9.6.1.1) or negative-pressure ventilated ducts at 30 hourly air changes minimum, reducible to 10 hourly air changes with automatic nitrogen filling on gas detection (9.6.1.2). Outer-duct rupture strength follows 9.8.1 to 9.8.4.
Chapter 13 sets 30 hourly air changes minimum for tank connection spaces (13.4.1), fuel preparation rooms (13.6.1) and fuel-pipe ducts or double pipes (13.8.1). ESD rooms may run at 15 hourly air changes normally if gas detection automatically boosts ventilation to 30 (13.5.2). Pipe ducts may run below 30 hourly air changes if minimum 3 m/s flow velocity is ensured across net duct area with pipes and components installed (13.8.4).
IGF Chapter 15 Table 1 maps 22 scenarios across five columns (two automatic shutdown columns: tank valve and engine-room gas supply). General hazardous and ESD spaces alarm at 20% LEL and shut down on two detectors at 40% LEL (15.8.6, single self-monitoring detector allowed under fn. 1), with ESD rooms also disconnecting non-Zone-1 electrics (12.3.3.2). Engine-room gas-pipe ducts can alarm at 30% LEL and trip ER gas supply on two detectors at 60% LEL (15.8.7). Tank-to-ER duct ventilation loss trips Column 4 (ER supply), not the tank valve, while ER fire detection raises an alarm only.
Planned maintenance should test real detector independence beyond lamp checks. Inject gas into one sensor at 20% or 30% LEL to confirm alarm-only response, then test two sensors at 40% or 60% LEL to prove physical valve stroking within closing limits alongside duct pressure-switch and fan-changeover logs.
Confirm the approved machinery concept (gas-safe vs ESD-protected) and check supply ratings against the 1.0 MPa IGF threshold (2.2.22, 9.7.1).
Verify ventilation matches IGF Ch. 9 & 13 (30 air changes/h baseline, 15 to 30 ESD on gas detection under 13.5.2, 10 with auto N2 filling under 9.6.1.2, or 3 m/s net velocity under 13.8.4).
Test Table 1 alarms/shutdowns: 20%/40% LEL general/ESD (fn. 1 self-monitoring and 12.3.3.2 non-Zone-1 cut), 30%/60% LEL ER ducts, Col. 4 duct-vent shutdown and alarm-only ER fire detection.
This guide covers five resolutions that amend MSC.391(95). MSC.422(98) (1 Jan 2020) removed the A-0 requirement for boundaries above the underside of the navigation bridge deck, bridge windows included (11.3.2). MSC.458(101) (13 Jun 2019, EIF 1 Jan 2024) added, for 2024+ ships, a higher loading limit by special consideration for well-protected tanks, never above 95% (6.8.3). It also added secondary enclosures for fuel pipes running through enclosed spaces outside the machinery space (9.5.3 to 9.5.6), exhaust evaluation (10.3.1.1.1) and 900 mm Type C cofferdam rules (11.3.3.1). MSC.475(102) (1 Jan 2024) added fixed fire extinguishing (11.8) for 2024+ fuel prep rooms housing ignition sources.
MSC.551(108) (adopted 23 May 2024) entered force 1 Jan 2026, with 2.2.43 covering contracts on or after 1 Jan 2026, absent-contract keels on or after 1 Jul 2026 or delivery on or after 1 Jan 2030. Two changes clearly reach ships already in service. Revised 11.6.2 mandates a 5 kg minimum dry powder extinguisher near the bunkering station and inside the fuel prep room (pre-2026 ships by their first survey dated on or after 1 Jan 2026). Clause 18.4.1.1.1 requires written PIC agreement on transfer rates, limiting pressures/temperatures, PRV settings and volume.
MSC.551(108) also changes several hardware rules. For 2.2.43 ships, 5.12.1 places the 300 mm sill on the hazardous-area door of 1.5 m to 2.5 m airlocks (unless Load Lines apply). Without a 2.2.43 prefix, 8.4.1 to 8.4.3 require dry-disconnect manifolds (8.4.2 design risk study for couplers/flanges, 8.4.3 ERC/ERS unless supply-side) and 9.6.1.1 drops the legacy HP auto-purge sentence. For 2.2.43 ships, 9.4.7 vents master-to-DBB and DBB-to-consumer lines on auto-shutdown, 9.4.8 covers each gas consumer. Clauses 9.8.1, 9.8.2 and 9.8.4 let the outer duct be designed to the inner pipe's working pressure or to the calculated rupture pressure, and require every duct to be pressure-tested. Clauses 11.3.1 (Cat A fuel prep rooms) and 15.4.1.3.3 (closed penetrating gauges, with a shut-off valve as near the tank as possible where the gauge is not tank-mounted) also change. For 2.2.43 ships, 12.5.1 makes interbarrier spaces Zone 0 and 12.5.2.1 lists tank connection spaces and fuel storage hold spaces as Zone 1.
MSC.567(109) enters force 1 Jan 2028 without altering Chapters 10 or 15 (2.2.44: contracts on or after 1 Jan 2028, absent-contract keels 1 Jul 2028 or delivery 1 Jan 2032). Clause 5.3.3.5.1 (no 2.2.44 prefix) caps suction-well protrusion at the lesser of 25% double-bottom depth or 350 mm. Clause 7.3.1.4 sets where piping relief valves discharge (into the fuel tank, or to the vent mast where liquid can be detected and removed). New 9.4.2 fits non-return valves at those tank inlets instead of automatic shut-off valves, so old 9.4.2 to 9.4.10 become 9.4.3 to 9.4.11. New clauses add A-60 exemptions (11.3.2.1, 11.3.2.1.1 and 11.3.2.1.2), duct transit protection (13.3.8) and 6 m Zone 1 + 4 m Zone 2 vent-mast zones (12.5.2.4/12.5.3.3, reducible via 50% LEL dispersion where layout prevents full distances, not below 12.5.2.3/12.5.3.1).
On pre-2026 IGF vessels, fit a 5 kg minimum dry powder portable extinguisher inside the fuel prep room by the first survey dated on or after 1 Jan 2026 (MSC.551(108) 11.6.2).
Update pre-bunkering PIC checklists now to record written limiting transfer pressures, temperatures and bunkering-line PRV settings (18.4.1.1.1).
On newbuildings in scope (2.2.43 or 2.2.44), apply Zone 0 interbarrier ratings (12.5.1), the 2028 6 m Zone 1 vent-mast envelopes (MSC.567(109) 12.5.2.4) and the renumbered 9.4.3-9.4.11 piping clauses.
UR M78 Sections 4 and 5 govern trials and butt-weld NDT. Type tests follow UR M71, while DF FAT follows UR M51. In the FAT, Cat C turbocharger surge is also tested on gas (unless greater gas margin is documented), hot surfaces use the hottest exhaust mode and the overspeed test need only be run in fuel-oil mode. Sea trials follow UR M88 with an IGF 16.7.3.3 leak test and mode loads (1 h minimum per mode on uninterrupted combined runs under 4.3.2 Note). Under Table 3 (UR M72), 100% RT/UT butt-weld NDT covers single-wall gas pipes, HP pipes/flanges and 5.0 bar+ single-wall vents, plus double-wall LP pipes exceeding 75 mm ID or 10 mm wall. Low-pressure flanges follow the same 75 mm / 10 mm rule. Smaller double-wall LP pipes and flanges, other vent pipes, enclosures, bellows and hoses take 10% NDT. Pressure tests, usually done before fitting to the engine, apply 1.5x design pressure on primary pipes and pressurised ducts, 1.0x on ventilated outer pipes (IGF 9.8.1/9.8.2) and a leak test on vent enclosures.
Statutory surveys follow HSSC 2025, IMO Res. A.1207(34) (3 Dec 2025, IGF through MSC.475(102) for natural-gas-fuelled ships). Cargo initial reviews cover plans ((CI) 2.1.3.1 to 2.1.3.10) and installations ((CI) 2.1.7.1 to 2.1.7.7, machinery at 2.1.7.4.1 to 2.1.7.4.6: ventilation, DF/GF/multi-fuel engines, boilers, turbines). Periodic items span Annual (CA) 2.2.5.1 to 2.2.5.20, Intermediate (CIn) 2.3.5.1 to 2.3.5.2 and Renewal (CR) 2.4.6.1 to 2.4.6.13, plus Safety Equipment (EI) 1.1.6 / (EA) 1.2.4 and Passenger (PI) 5.1.4 / (PR) 5.2.3. Because A.1207(34) reflects the IGF Code only up to MSC.475(102), its survey items do not yet mention MSC.551(108) changes such as the new 11.6.2 extinguishers.
Port State Control follows IMO Res. A.1206(34) (3 Dec 2025), which holds zero IGF checklists in Appendices 2, 6, 7 or 12 (one IGF circular reference in App. 21). PSCOs assess machinery defects under general SOLAS clauses: App. 6 3.3 cites repeated crankcase or scavenge-belt relief lifts and faulty alarms as grounds for logbook investigation and requested running tests during a more detailed inspection. App. 2 SOLAS detention examples (items 1, 2, 6, 13) and App. 7 Part 1 operational criteria (5.1.4.6 to 5.1.4.9, 5.2.1) apply alongside.
Technical superintendents and Chief Engineers preparing for IGF Class surveys, dual-fuel trips or UR M78/M82 reviews can engage Marvel Solutionz directly. Book $350 USD for a 1-hour consultancy (+ 5% sales tax) at https://marvelsolutionz.com/book-consultancy/ or review scope at https://marvelsolutionz.com/lng-gas-engine-consultancy/.
For fleet teams, the LNG, Dual-Fuel and Spark-Gas Academy at https://marvelsolutionz.com/lng-academy/ offers $395 USD self-paced (+ 5% sales tax, including 3 months SeaReady Officer Pro). A 6-week cohort costs $995 USD (+ 5% sales tax), and corporate team training for up to 10 engineers costs $3,500 USD (+ 5% sales tax).
Keep one IGF/M78 survey binder with UR M78 Table 3 (UR M72) NDT and component pressure-test sheets, UR M51/M88 trial logs, UR M66/M82 certificates and HSSC (CA) 2.2.5 annual tests.
Log root-cause findings and corrective actions after any crankcase or scavenge-belt relief lift so failure records stand up to review under A.1206(34) Appendix 6 section 3.3.
Pair SeaReady shipboard checklists with Marvel Solutionz ($350 USD for a 1-hour consultancy or $395 USD self-paced LNG Academy, each + 5% sales tax).
Frequently Asked Questions
Which ships and engines must comply with IACS UR M78 (Rev.4, Dec 2025)?
UR M78 (Rev.4) covers marine dual-fuel, gas-only and fuel-sharing engines using natural gas, ethane, LPG, methyl/ethyl alcohols or anhydrous ammonia. Rev.2 covers TA apps only (dated on or after 1 Jan 2025), while Rev.3 (1 Jan 2027) and Rev.4 (1 Jul 2027) cover TA apps or new-ship construction contracts on or after those dates.
What does IACS UR M10 (Rev.5, Nov 2024) require from 1 Jan 2026?
Applying to engine certification applications or new-ship contracts dated on or after 1 Jan 2026, UR M10 (Rev.5) restricts crankcase ventilation under M10.5. It allows ventilation on gas or low-flashpoint engines only where needed to hold crankcase gas below the LEL (as defined in IEC 60079-10-1 Feb 2021). It also requires M10.6 crankcase evaluations for gas and low-flashpoint engines and sets M10.9 OMD (2,250 kW+ or over 300 mm bore).
When do crankcase relief valves follow UR M9 vs UR M82 manifold ERD rules?
IACS UR M9 governs crankcase relief valves (200 mm bore or 0.6 m³ volume minimum, 45 cm² each, 115 cm²/m³ combined, 0.2 bar max full lift, UR M66 type tested). IACS UR M82 (1 Jul 2024 engine cert/contract trigger) governs air-inlet and exhaust-manifold relief devices on gas-fuelled engines.
What are the methanol and ammonia limits in IACS UR M78 Rev.4?
Under UR M78 Rev.4 clause 2.2.4.3.1, methanol and ammonia trunk-piston units need crankcase underpressure above 730 ppm (methanol) or 110 ppm (ammonia) unless justified otherwise by risk analysis in the safety concept. Under 2.2.2.1, ammonia secondary enclosures alarm above 110 ppm and route ventilation air to ARMS (or equivalent) above 220 ppm unless Class accepts other levels justified by the risk analysis, while 3.5.2 caps normal exhaust at 110 ppm.
Which MSC.551(108) IGF Code 2026 rules require direct action on pre-2026 ships?
Two changes clearly reach ships already in service: 11.6.2 mandates a 5 kg minimum dry powder portable extinguisher inside the fuel prep room by the first survey dated on or after 1 Jan 2026. Clause 18.4.1.1.1 requires written pre-bunkering PIC agreement on limiting transfer pressures, temperatures and bunkering-line PRV settings.
How do IGF Code Table 1 gas detection thresholds differ between spaces and pipe ducts?
Under IGF Code 15.8.6 and Table 1, general hazardous and ESD rooms alarm at 20% LEL and shut down on two detectors at 40% LEL (single self-monitoring detector allowed per fn. 1, ESD rooms also disconnect non-Zone-1 electrics per 12.3.3.2). Ventilated engine-room gas-pipe ducts can alarm at 30% LEL and shut down engine-room gas supply on two detectors at 60% LEL (15.8.7).
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/dual-fuel-and-gas-engine-safety-iacs-ur-m78-m10-m82-and-igf-code-guide/