Spark-Gas Engine EIAPP, NOx Technical Code 2008 & IGF Ch. 10: MEPC.272(69), 398(83), 397(83), 402(83) & UR M78 Rev.4

Engineering guide to spark-gas EIAPP, NTC 2008 (MEPC.272(69)/398(83)/397(83)), MARPOL VI Reg. 13, MEPC.402(83) CH4/N2O, IGF Ch. 10 & UR M78 Rev.4.

← All technical guides · Category: Spark-Gas Engines · Updated: · 14 min read

Key Takeaways (TL;DR)

  • MARPOL Annex VI Reg. 13 and NTC 2008 (MEPC.272(69)) mandate EIAPP certification for spark-gas engines above 130 kW on ships built on or after 1 Mar 2016, and for added or non-identical replacement gas engines installed from that date.
  • Six NOx ECAs operate under Reg. 13.6 since MEPC.392(82) entered into force on 1 Mar 2026, adding the Canadian Arctic (Tier III for ships built on or after 1 Jan 2025) and the Norwegian Sea (contract on or after 1 Mar 2026, keel 1 Sep 2026 if no contract, or delivery 1 Mar 2030).
  • MEPC.398(83) took effect on 1 Sep 2026, adding Section 7.2 for onboard certification after substantial modification or non-original Tier certification (barring Engine Families).
  • MEPC.397(83) enters into force 1 Mar 2027, applying by EIAPP date by 1 Jan 2028 (new individual/parent) and 1 Jan 2030 (new pre-2028 family/group member).
  • Non-mandatory MEPC.402(83) sets voluntary CH4 (FID+NMC reference) and N2O measurement guidelines for an optional Administration Statement of emission values.
  • Mandatory IGF 10.3.3 closes gas no later than ignition on gas-only stops or ESDs, beside MSC.458(101) exhaust relief (10.3.1.1.1) and IACS UR M78 Rev.4 (1 Jul 2027).

Spark-Gas Engine Certification, Emissions & Safety Matrix (MARPOL Annex VI, NTC 2008, IGF Code & IACS UR M78 Rev.4)

Instrument & StatusEffective / Trigger DateScope on Spark-Gas EnginesCore Technical Rule or ThresholdSurvey / PSC Evidence Required
MARPOL Annex VI Reg. 13 & MEPC.272(69) (Mandatory)Ships built on or after 1 Mar 2016, or added/non-identical replacement gas engines installed from that date (MEPC.272(69) active 1 Sep 2017)Gas-fuelled engines above 130 kW output (Reg. 13.1.1 & NTC 1.3.10)Tier II (14.4 / 44 n^-0.23 / 7.7 g/kWh) and ECA Tier III (3.4 / 9 n^-0.2 / 2.0 g/kWh). Dedicated gas fa and khd formulas.EIAPP Certificate, approved Technical File (designated NOx items, gas valve, ignition timing) and IAPP Supplement.
MARPOL Annex VI MEPC.392(82) (Mandatory, active)Active 1 Mar 2026. Canadian Arctic NOx: ships built on or after 1 Jan 2025. Norwegian Sea 3-date rule.Adds 5th and 6th NOx ECAs (Reg. 13.6.5 and 13.6.6) plus SOx 0.10% on 1 Mar 2027.Norwegian Sea triggers: contract 1 Mar 2026, keel 1 Sep 2026 (no contract), or delivery 1 Mar 2030.Where Reg. 13.5.1 applies, tier and on/off logbook or approved ERB entry at NOx ECA entry, exit, or status change (13.5.3).
NTC 2008 MEPC.398(83) Sec. 7.2 (Mandatory, active)Active 1 Sep 2026 (adopted 11 Apr 2025, accepted 1 Mar 2026)Installed engines undergoing substantial modification (7.2.1.1) or non-original Tier upgrade (7.2.1.2).Individual or Engine Group parent only (bars Families, 7.2.3). Agreed plan (7.2.10) and 100% mode no lower than 85% rated power, else test deferred (7.2.5).Updated EIAPP Certificate, revised Technical File, replaced nameplate if power or speed alters (7.2.4) and test report.
NTC 2008 MEPC.397(83) Ch. 8 & NTE (Mandatory, upcoming)EIF 1 Mar 2027. By 1 Jan 2028 (parent/individual) and 1 Jan 2030 (member).New EIAPP engines, plus defined post-2027 substantial mods (1.3.2) and MEOP identical replacements (op. 4(c)).MEOP (Ch. 8), NTE zones (3.3; limit area at or above 25% power and 63% speed for E2/E3, at or above 50% load for C1), auxiliary control devices (1.3.23).NOx certification pack (2.5), Technical File profiles (8.1.3), EIAPP 1.9.6 NOx values, IAPP 2.2.1 MEOP flag and switch logs.
IMO MEPC.402(83) CH4 & N2O Guidelines (Non-mandatory)Adopted 11 Apr 2025 (voluntary protocol, does not amend NTC 2008)Marine diesel engines (liquid, gas, or dual-fuel) tested on test bed or on board.Cslip-CH4 (% methane-fuel mass, CfCH4 zero) and CfN2O (g/kg fuel). FID+NMC (Em under 15%, Ee over 98%), N2O analyser interference not over 1.0 µmol/mol (App. IV 8.4.5).Voluntary Section 2 methane/N2O file (with App. 2 test data) verified by Administration for App. 3 Statement.
IGF Code Ch. 10 (MSC.391(95) & MSC.458(101)) (Mandatory)MSC.391(95) active 1 Jan 2017. MSC.458(101) active 1 Jan 2024 (2.2.42 rule).Gas-only IC engines (10.3.3) plus general IC safety (10.2 & 10.3.1).Gas shut-off no later than ignition on stop/ESD (10.3.3). Ignition check, misfire limits, combustion-fail purge, exhaust relief (10.3.1.1.1).HSSC A.1207(34) natural-gas IGF items ((CI) item 2.1.7.4.3 / (PI) item 5.1.4.14.3) and engine safety concept.
IACS UR M78 Rev.4 (Class Mandatory, upcoming)Published Dec 2025. TA applications and new-ship contracts on or after 1 Jul 2027.Low- and high-pressure gas or low-flashpoint IC engines including GF gas-only engines (1.2.9).Spark-ignition fault forces shutdown unless 1-cyl gas cut-off is substantiated (3.2.1). Table 2 alarm/DBB and GF shutdown (fn. 5, fn. 2).Class type-approval dossier, risk study, torsional vibration proof (2.2.5) and UR M82/M9 relief certificates.

1. MARPOL Annex VI Regulation 13, Six NOx ECAs & Gas-Fuelled Engine Scope

Lean-burn spark-ignited gas engines use zero pilot diesel oil, yet MARPOL Annex VI regulates them beside compression-ignition machinery. Under MARPOL Annex VI Regulation 2.1.21 (as revised by MEPC.328(76)) and NTC 2008 clause 1.3.10 (MEPC.272(69)), gas-fuelled units are classified as marine diesel engines. That scope covers ships built on or after 1 Mar 2016 and added or non-identical replacement gas units fitted starting that date above 130 kW.

Regulations 13.1.2, 13.1.3, and 3 define statutory exclusions. Emergency-only and lifeboat units are excluded (13.1.2.1), while strictly domestic units are excluded where subject to an Administration alternative NOx control (13.1.2.2). Under 13.1.3, an Administration may exclude engines on ships built before 19 May 2005, or engines major-converted before that date, where the ship trades solely to ports or offshore terminals of its flag State. Other international gas engines above 130 kW captured by the 1 Mar 2016 trigger require EIAPP certification.

Weighted NOx limits depend on rated speed n (rpm) and build date. Tier I (13.3, 2000 to 2010 builds) caps NOx at 17.0 g/kWh below 130 rpm, 45 n^-0.2 from 130 to under 2,000 rpm, and 9.8 g/kWh at 2,000 rpm and above. Tier II (13.4, builds from 2011) sets 14.4, 44 n^-0.23, and 7.7 g/kWh, while ECA Tier III (13.5.1.1) cuts limits to 3.4, 9 n^-0.2, and 2.0 g/kWh. At 750 rpm, Tier II allows 9.60 g/kWh and Tier III allows 2.39 g/kWh (about a 75% reduction, which lean-burn spark-gas engines are designed to meet in-cylinder without SCR; each engine's EIAPP Certificate shows the Tier it is certified to).

IMO Resolution MEPC.392(82) took effect on 1 Mar 2026 (adopted 4 Oct 2024, accepted 1 Sep 2025), expanding Regulation 13.6 to six NOx ECAs. North American (13.6.1, App. VII s. 2) and US Caribbean Sea (13.6.2, App. VII s. 3) bind ships built on or after 1 Jan 2016 (13.5.1.2.1). Baltic (13.6.3, Annex I 1.11.2) and North Sea (13.6.4, Annex V 1.14.6) bind ships built on or after 1 Jan 2021 (13.5.1.2.2). Canadian Arctic (13.6.5, App. VII s. 5) binds ships built on or after 1 Jan 2025 (13.5.1.3.1).

Norwegian Sea NOx compliance (13.6.6, Annex II 13.9.4) applies a three-date rule under 13.5.1.2.3. It covers contracts placed on or after 1 Mar 2026, keels laid on or after 1 Sep 2026 where no building contract exists, or deliveries on or after 1 Mar 2030. Separate 0.10% m/m sulphur caps in both new ECAs begin on 1 Mar 2027 after the 12-month Regulation 14.7 exemption.

Major conversion clauses under 13.2.1 cover non-identical replacements or additions (13.2.1.1, excluding identical swaps per 13.1.1.2), NTC substantial modifications (13.2.1.2), and MCR rises exceeding 10% (13.2.1.3). Under MEPC.385(81) (active 1 Aug 2025), clause 13.2.2 classifies a diesel unit replacing a steam system as a replacement engine. Where a replacement engine cannot meet Tier III, it must meet Tier II, taking into account IMO guidelines; for each such Tier II replacement installed on or after 1 Aug 2025, the Administration must notify IMO. Substantial modifications or uprates above 10% meet Tier I on pre-2000 vessels and the build-date tier on ships built on or after 1 Jan 2000 (13.2.3).

Three final clauses cover Tier III exemptions, ECA logs, and 1990s ships. Clause 13.5.2 exempts certain craft from Tier III (13.5.1.1) only: recreational vessels under 24 metres (13.5.2.1) and pre-2021 recreational vessels under 500 GT at 24 metres or longer (13.5.2.3). Clause 13.5.2.2 also exempts ships with combined nameplate diesel propulsion under 750 kW where design or construction limits are proven to Administration satisfaction. Where 13.5.1 applies, clause 13.5.3 requires logging tier, on/off status, date, time, and position in an Administration-prescribed logbook or ERB at NOx ECA entry, exit, or in-ECA on/off changes for Tier II/III or Tier II-only units. Clause 13.7 covers engines above 5,000 kW and at or above 90 L/cyl on ships built on or after 1 Jan 1990 and before 1 Jan 2000. Once an Approved Method for that engine has been certified and notified to IMO, the engine must either have it fitted (13.7.1.1; the method may cut rating by no more than 1.0% and raise fuel use by no more than 2.0%, 13.7.5.1) or be certified to Tier I, II or III (13.7.1.2). This is due by the first renewal survey 12 months or more after the notification, or later if the method is not commercially available (13.7.2).

  • Verify every spark-gas unit above 130 kW on ships built on or after 1 Mar 2016 (or fitted from that date as an added or non-identical replacement unit) holds an EIAPP Certificate and approved Technical File.
  • Check contract, keel-laying (if no contract), and delivery dates against all six NOx ECAs, including Canadian Arctic (1 Jan 2025) and Norwegian Sea (1 Mar 2026 / 1 Sep 2026 / 1 Mar 2030).
  • Evaluate ignition upgrades, turbocharger swaps, or uprates against the 10% MCR threshold and Regulation 13.2.1 before ordering spares.
  • Where Regulation 13.5.1 applies, log tier, on/off status, date, time, and position at NOx ECA entry, exit, and in-ECA on/off changes under 13.5.3.

2. NOx Technical Code 2008 Test-Bed Pre-Certification for Spark-Gas Engines

IMO Resolution MEPC.177(58) (active 1 Jul 2010) sets the mandatory certification rules behind every EIAPP Certificate. Pre-certification under Chapters 2 and 5 runs on the maker test bed (2.1.1.1, 2.2.1), issuing EIAPP Certificates to individual engines (2.2.1.3) and to the parent and every member engine of a family or group (2.2.7). Where size, construction, and delivery schedule prevent test-bed pre-certification, clause 2.2.4 allows an onboard Chapter 5 test for an Individual Engine or Group parent, never an Engine Family.

Engine Family (4.3) and Engine Group (4.4) rules set allowed field adjustments. Families cover series engines with identical combustion design, displacement spread within 15% (4.3.8.2.3), and only minor adjustments through adjustable features, each compliant across its full physically available range (4.3.6), naming the highest-NOx model as Parent (4.3.9.2). Groups cover engines sharing the common parameters in 4.4.6.2 (often small-volume production) and allow approved minor adjustments after test-bed measurement (4.4.7.1); the first engine ordered may be registered as parent, and a parent not set to the reference or maximum-tolerance conditions has its results corrected to them (4.4.8.1). In both cases, the highest member rated speed fixes the NOx limit (3.1.3).

Test-bed trials use one or more of four duty cycles (3.2.1). Cycle E2 covers constant-speed main, diesel-electric, and CPP drives at 100% speed across 100/75/50/25% power (weights 0.2, 0.5, 0.15, 0.15). Cycle E3 covers propeller-law main and auxiliary units at 100/91/80/63% speed with identical power steps and weights (3.2.4). Cycle D2 covers constant-speed auxiliary generators at 100% speed across 100/75/50/25/10% power (weights 0.05, 0.25, 0.3, 0.3, 0.1). Cycle C1 covers variable-speed auxiliaries by percentage torque (3.2.6 Table 4): rated 100/75/50/10% (0.15/0.15/0.15/0.1), intermediate 100/75/50% (0.1 each), and 0% idle torque (0.15).

IMO Resolutions MEPC.251(66) (active 1 Sep 2015) and MEPC.272(69) (active 1 Sep 2017) updated NTC 2008 for dual-fuel and pure gas engines. MEPC.251(66) requires dual-fuel engines to meet Regulation 13 in their normal gas mode (1.3.10), tested at the maximum certified liquid-to-gas ratio with the gas sampled and analysed (5.3.4 to 5.3.6). It exempts emergency liquid-fuel voyages to repair ports after gas failures (1.3.10). Chapter 5 Table 5 (5.12.5.1) gives natural gas exhaust density rho_e = 1.2661 kg/m³ and u_NOx = 0.001621. Separately, Chapter 6 Table 9 (6.4.11.1, Direct Measurement and Monitoring) sets default natural gas composition at 75.0% carbon and 25.0% hydrogen (zero nitrogen or oxygen), whereas Chapter 5 test-bed runs analyse actual gas samples (5.3.4).

For pure gas engines tested solely on gas, MEPC.272(69) introduces two gas-specific test-bed equations. Paragraph 5.2.1.3.2 defines atmospheric factor fa = (99 / ps)^1.2 times (Ta / 298)^0.6 (ps is dry atmospheric pressure in kPa per 5.2.1.1), with or without charge-air cooling. Paragraph 5.12.4.7 defines NOx humidity correction factor khd = 0.6272 + 44.030 x 10^-3 x Ha minus 0.862 x 10^-3 x Ha^2, where Ha is intake humidity in g/kg dry air (capped at charge-air saturation HSC per 5.12.4.6). Zirconium dioxide oxygen analysers (ZRDO) are barred on gas and dual-fuel engines, while non-heated FID units are permitted on pure gas engines without pilot fuel (Appendices III and VIII). Appendix V Section 1 records EN 16726:2015 Methane Number and lower heating value in parent test reports, while Section 2 logs ISO 8178-5:2008 elemental percentages and CH4 through C6+ plus CO2 molar fractions for the Technical File.

Every certified gas engine keeps its approved Technical File for life (2.3.4, 2.4.1). MEPC.272(69) added gas fuel (4.3.8.2.6) and spark-plug or external ignition methods (4.3.8.2.11) to Engine Family basic characteristics. It also added gas valves (4.4.6.2.5, 4.4.7.2.2, 6.2.2.3.16), ignition timing (4.4.7.2.1, 6.2.2.3.1, Appendix VII 1.1), and timing indicators or lights (Appendix VII 1.1.5) to the Engine Group criteria and engine parameter check lists. Designated NOx-critical items vary by engine design under 6.2.2.4. A replacement designated item must be a spare to the approved Technical File specification (2.4.1.7, 6.2.3.2), every change, including like-for-like swaps, goes in the record book of engine parameters (6.2.2.7.1), and a modification to a designated component needs technical documentation of the change and its NOx influence (6.2.2.6, 6.2.2.7.3).

  • Confirm the EIAPP Certificate states the exact duty cycle (E2, E3, D2, or C1) matching the installed propulsion or generator service.
  • Verify the Technical File lists approved IDs and adjustment limits for all designated NOx-critical items, including gas valves and ignition timing.
  • Check Appendix V Section 1 Methane Number (EN 16726:2015), Section 2 gas breakdown (ISO 8178-5:2008), and MEPC.272(69) fa/khd calculations.
  • Never use paragraph 2.2.4 onboard testing to certify an Engine Family, as only Individual Engines and Engine Group parents qualify.

3. Onboard Verification, Electronic Record Books & 2026 to 2030 NTC Amendments

NTC 2008 Chapter 6 provides three onboard verification methods after commissioning. Under the Engine Parameter Check Method (Section 6.2), surveyors review records and inspect designated components or adjustable settings as necessary (6.2.3.1, 6.2.3.2), checking the record book of engine parameters and that settings stay within the Technical File's allowable ranges (6.2.3.1.1, 6.2.2.7.1). Engineers log like-for-like replacements of designated items (6.2.2.7.1) and chronological changes affecting designated NOx parameters (6.2.2.8).

Two measurement paths supplement parameter checks. Simplified Measurement (Section 6.3) serves confirmation tests plus annual, intermediate, or renewal IAPP surveys (6.3.1.1), measuring NOx and CO2 as a minimum (6.3.1.2). Administrations may accept a 10% simplification allowance (6.3.11.1, for confirmation tests and periodic surveys only) and a 10% allowance for an onboard test on ISO 8217:2005 RM-grade fuel oil (6.3.11.2, never at the onboard pre-certification test and of no use to a pure gas engine), capped at 15% combined (6.3.11.3). Direct Measurement and Monitoring (Section 6.4) serves annual, intermediate, or renewal IAPP surveys (6.4.1.1) and post-modification checks under 1.3.2 (6.4.16.1), under an approved Onboard Monitoring Manual (6.4.17.1). Engine power at each load point (excluding idle) must stay within 5% C.O.V. over 10 minutes (6.4.6.8), with data current within 30 days and retained on board for at least three months, both counted while the ship is in operation (6.4.16.1).

Electronic record keeping separates binding Code text from voluntary guidance. Mandatory MEPC.317(74) (active 1 Oct 2020) inserted Administration-approved ERBs into NTC 2008 (1.3.20, 6.2.2.7.1). It also updated 2.2.5.1 so combined engine and NOx-reducing systems (such as SCR) may be pre-certified per IMO guidelines, including without combined test-bed runs subject to 2.2.4.2. Non-mandatory MEPC.312(74) covers Regulation 13.5.3 logs (2.1.5) and NTC 6.2.2.7 records (2.1.7). It advises carrying Administration written confirmation on board (5.1 to 5.2, Appendix declaration) and using UTC audit logs, role-based access, and an extra authentication factor for master verification (3.2, 4.3.1, 4.3.6). It further advises cryptographically generated read-only offline backups digitally signed by the master (4.4.3.1, 4.4.4), hard-copy true copies for authorities (4.1.4), and physically master-signed true copies for prosecution inquiries (6.3).

Mandatory MEPC.398(83) (adopted 11 Apr 2025, accepted 1 Mar 2026) took effect on 1 Sep 2026. It splits NTC Chapter 7 into Section 7.1 (certification of an existing engine under regulation 13.7, 7.1.1 to 7.1.6) and Section 7.2 (7.2.1 to 7.2.12) plus Appendix II Figure 4 for installed engines undergoing substantial modification (7.2.1.1) or non-original Tier certification (7.2.1.2). Clause 7.2.3 restricts Section 7.2 to an Individual Engine or Engine Group Parent, barring Engine Families. Applicants must agree an Engine Emission Test Plan before scheduling the test (7.2.10) and replace the nameplate if rated power or speed alters (7.2.4). Subject to that plan, clause 7.2.5 allows the 100% load point to be no lower than 85% of rated power (the 3.2 100% weighting factor still applies); if 85% cannot be reached, the test shall be deferred until it can.

Mandatory MEPC.397(83) (adopted 11 Apr 2025, accepted 1 Sep 2026) enters into force on 1 Mar 2027. By EIAPP issue date under operative paragraph 4, it applies no later than 1 Jan 2028 to new individual or uncertified parent engines (4(a)), and 1 Jan 2030 to new members of pre-2028 families or groups (4(b)). Under 4(c), existing certified units keep their original NTC version except: identical swaps from 1 Jan 2028 apply Chapter 8 only if the replaced unit had MEOP (4(c)(ii)). Post-2027 substantial modifications on post-1999 ships apply 2.5 and 3.3 where carrying an auxiliary control device, plus Chapter 8 if MEOP (1.3.2.1), while pre-2000 ship mods apply 2.5, 3.3, and Chapter 8 if MEOP (1.3.2.2).

MEPC.397(83) adds definitions 1.3.21 to 1.3.37 covering operational profiles (1.3.21), MEOP (1.3.22), auxiliary control devices (1.3.23), defeat devices (1.3.24, reinforcing Reg. 13.9), base strategies, and NTE zones (1.3.28 to 1.3.30). Chapter 8 covers multi-tier (8.2.1), multi-cycle (8.2.2), and same-tier/same-rating/same-cycle MEOP engines (8.2.3), determining the MEOP parent engine specific emission value (5.12.6.1) from the highest NOx emission rate q_mgasi (g/h, 5.12.5.2) at each mode point across all profiles (8.2.3.3). Technical Files identify each profile and its conditions of use (8.1.3), the engine parameter check lists add profile IDs (6.2.2.3.17, App. VII 1.15), EIAPP 1.9.6 lists parent NOx values, IAPP 2.2.1 flags MEOP engines (8.2.3.6), and 8.3.2 to 8.3.3 require switch logs. Under 3.3.3, Administrations may require up to three point emission values at load points agreed with the applicant within the NTE zone, whose limit area lies at or above 25% power and 63% speed for E2/E3 (App. X 3.1), at or above 25% power at nominal speed for D2, and at or above 50% load for C1 (1.3.30). Section 2.5 adds NOx certification packs alongside new Appendices IX and X.

  • Maintain each engine parameter record book (or Flag-approved ERB with MEPC.312(74) written confirmation on board) for designated component swaps and adjustments.
  • Before scheduling an onboard Section 7.2 test on or after 1 Sep 2026 (substantial modification or non-original Tier), secure an Administration-agreed Engine Emission Test Plan (7.2.10).
  • Confirm the engine can reach at least 85% of rated power on board for the 100% load point; if it cannot, the Section 7.2 test must be deferred until it can (7.2.5).
  • Audit 2027 to 2030 engine procurement specifications for MEPC.397(83) NOx certification packs (2.5), auxiliary control device disclosures (1.3.23), MEOP logs, and NTE compliance.

4. Voluntary Methane Slip & Nitrous Oxide Testing (MEPC.402(83)) vs Mandatory NOx

Lean-burn spark-ignited Otto-cycle gas engines keep NOx low by curbing peak cylinder temperatures; confirm each engine's Tier III certification from its EIAPP Certificate. That lean-burn physics raises low-load unburnt methane slip (CH4), while catalysts or nitrogen-bearing fuels can form nitrous oxide (N2O). Both are greenhouse gases named in the 2023 IMO GHG Strategy (MEPC.402(83) preamble) and counted in lifecycle schemes such as EU FuelEU Maritime, yet Regulation 13 and NTC 2008 set no CH4 or N2O limits.

MEPC 83 adopted Resolution MEPC.402(83) on 11 Apr 2025 to provide uniform voluntary testing without amending NTC 2008. The Guidelines are non-mandatory: Member States are invited to encourage their voluntary application to marine diesel engines running on liquid, gas, or dual fuel (operative paragraph 2).

Appendix 1 adds three factors to NTC Table 3. Cslip-CH4 tracks unburnt methane as a percentage of the mass of methane-containing fuel consumed by the engine, capturing combustion slip and crankcase methane where appropriate, setting CfCH4 to zero (non-methane gas follows liquid-fuel rules). CfN2O is defined in Table 3 as g N2O per g total fuel and reported in g/kg fuel (5.12.6, App. 2 and 3). Extended Table 5 gives component gas densities rho_gas of 0.716 kg/m³ (CH4) and 1.9631 kg/m³ (N2O), with natural gas u_gas values of 0.000565 (CH4) and 0.001551 (N2O).

For methane, Flame Ionisation Detection with a Non-Methane Cutter (FID + NMC) is the reference method (App. III 3.6, alternatives proven against FID + NMC). Under the protocol's new section 8.5 for NTC Appendix IV, pre- and post-test checks should show Em below 15% and Ee above 98%, using averages to correct CH4. For N2O, FTIR, NDIR, laser-IR, or NDUV analysers are permitted: NDIR checks cover SO2, CH4, H2O, CO2, and CO (8.4.3), FTIR/laser-IR follow the chosen band (8.4.4), and combined interference should not exceed 1.0 µmol/mol (8.4.5).

Because methane slip rises at low load, MEPC.402(83) adds a 10% load point (or the lowest mode point at which gas fuel would be used) to E2 and E3 cycles, while onboard 100% mode allows 85% rated power. Section 2 methane or nitrous oxide files record crankcase methods where appropriate (2.1.3) and single-analyser changeover sequencing (2.1.5), while Appendix 2 logs EN 16726:2015 Methane Number, gas composition, and before/after abatement data.

Submitting the Section 2 file (with Appendix 2 test data) enables Flag verification under Section 3 to issue a voluntary Appendix 3 Statement of emission values. The Statement is voluntary: MEPC.402(83) only invites Member States to encourage use of the Guidelines (operative paragraph 2), so it is not a statutory MARPOL certificate that PSC inspects; verified slip values can replace default slip factors in GHG schemes such as FuelEU Maritime where those schemes accept measured values.

  • Treat MEPC.402(83) strictly as a voluntary measurement guideline and never equate its Appendix 3 Statement of emission values with a mandatory EIAPP Certificate.
  • When witnessing FID + NMC methane slip tests, verify pre- and post-test logs show Em below 15% and Ee above 98%.
  • Confirm N2O cross-interference checks (SO2, CH4, H2O, CO2, and CO for NDIR under 8.4.3) stay at or below 1.0 µmol/mol (8.4.5).
  • Ensure E2 and E3 propulsion slip tests include the extra 10% (or lowest gas-mode) point and Section 2 crankcase notes where applicable.

5. IGF Code Chapter 10 & IACS UR M78 Rev.4 Safety Rules for Gas-Only Engines

Spark-ignited gas-only engines carry no pilot-diesel fallback, shaping every shutdown, purge, and explosion-relief safeguard. The mandatory IGF Code (MSC.391(95), active 1 Jan 2017) isolates gas-only units in Section 10.3.3 rather than dual-fuel 10.3.2. Under 10.3.3, any normal stop or ESD shall close gas fuel no later than ignition. Controls shall also block shutting off ignition without first or simultaneously closing cylinder or engine gas supply.

General Chapter 10 clauses back up that interlock. Section 10.2 mandates separate exhausts per gas consumer (10.2.4), safeguards against unburnt exhaust gas pockets (10.2.1), and inlet, scavenge, or gas-air parts able to resist or relieve worst-case overpressure (10.2.2). Explosion venting must be led away from where personnel may normally be present (10.2.3). Section 10.3.1 covers exhaust explosion relief (10.3.1.1), trunk-piston crankcase gas studies (10.3.1.2), and independent non-crosshead crankcase and sump vents (10.3.1.3). Clause 10.3.1.4 mandates extracting gas leaked into lube-oil or cooling systems after the engine outlet and venting it safely to atmosphere.

Ignition and combustion interlocks under Section 10.3.1 prevent unburnt gas accumulation. Clause 10.3.1.5 requires confirming correct ignition operation in every combustion unit before admitting gas. Clause 10.3.1.6 requires a means to monitor and detect poor combustion or misfiring. Gas operation may then continue only if the gas supply to the affected cylinder is shut off and running with one cylinder cut off is acceptable for torsional vibration. Clause 10.3.1.7 mandates automatic fuel-valve shut-off and exhaust purging of unburnt mixture whenever combustion is not detected within an engine-specific time during starting. Redundancy links to 9.3.1 to 9.3.3, while 15.7 item 1 mandates bridge, ECR, and manoeuvring-platform engine operation indicators for gas-only engines (dual-fuel mode indicators sit in 15.7 item 2).

IMO Resolution MSC.458(101) (adopted 13 Jun 2019, active 1 Jan 2024) added paragraph 10.3.1.1.1 for ships built under the 2.2.42 three-date rule. That rule captures contracts on or after 1 Jan 2024, keels on or after 1 Jul 2024 without a contract, or deliveries on or after 1 Jan 2028. Covered exhaust systems need suitable explosion relief unless built to resist worst-case overpressure or justified by the engine safety concept, plus an unburnt-gas evaluation from cylinder to outlet. Under Section 5.4, gas-safe spaces (5.5.2, 9.6.1) require gastight enclosures using inert-gas pressurised double pipes (9.6.1.1), ventilated underpressure ducting (9.6.1.2), or an equivalent (9.6.1.3). ESD-protected spaces (5.6, 9.7.1) apply only to spaces holding periodically unattended machinery certification (5.6.1), with single-walled piping up to 1.0 MPa and automatic ESD of non-safe electrics. Where single-walled gas piping is accepted in ESD-protected spaces, propulsion and electric-power engines shall be in two or more machinery spaces without common boundaries unless a single casualty cannot affect both (5.6.3.1). Shutting gas to any one space must not cause an unacceptable loss of power (5.6.4), and a single separating bulkhead must withstand a local gas explosion (5.6.5).

IACS Unified Requirement M78 Rev.4 (published Dec 2025) covers both low-pressure (up to 10 bar g, 1.2.16) and high-pressure (above 10 bar g, 1.2.11) engines running on low-flashpoint or gaseous fuels. IACS Societies will enforce Rev.4 on type-approval applications and new-ship construction contracts on or after 1 Jul 2027. Clause 1.2.9 defines GF engines as gas-fuel-only units without oil switchover. Under clause 3.2.1, spark-ignition failure triggers engine shutdown unless the failure is limited to one cylinder, and that cylinder's gas supply is cut off immediately. Safe operation must then be substantiated by the safety concept and risk analysis, demonstrated at type test, with acceptable torsional vibration (2.2.5). Combustion monitoring (per-cylinder, or common where impracticable per 2.2.5) auto-corrects faults or triggers Table 2 actions.

UR M78 Rev.4 sets protective hardware and Table 2 trip rules for GF units. Pre-mixed engines need cylinder-head flame arresters unless justified in the safety concept or risk analysis (3.3.1). Intake and exhaust relief valves need UR M82 type approval with discharge that prevents flame passage, self-closing on single-propulsion setups (2.1.3, 2.2.3). Crankcases need UR M9 relief valves (2.2.4.1), independent UR M10 vents (2.2.4.3), and maintenance means for inerting, ventilating, and gas concentration measuring from 0.6 m³ upward (2.2.4.2). In Table 2, abnormal gas pressure, gas-supply malfunction, and annular double-wall leaks trigger Alarm, DBB closure, and GF Shutdown (fn. 5: GF shutdown only). Ignition faults, high exhaust temperature, low exhaust deviation (fn. 3), and misfiring, knocking, unstable combustion, or cylinder-pressure faults carry fn. 2 (DBB closure and GF shutdown may be withheld if only one cylinder is affected and it can be cut off from gas). Fn. 4 (alarm only where an automatic mitigation action corrects the failure; safety actions follow if it persists) applies to the cylinder-pressure or ignition-failure row only. Trunk-piston oil-mist or bearing trips (fn. 6 and 9) apply to DF and GF units without fn. 5, while DBB medium failure triggers Alarm and DBB closure without a shutdown X.

  • Verify the mandatory IGF 10.3.3 stop and ESD sequence during planned maintenance and survey interlock checks: gas valves must close no later than ignition cut-off.
  • Confirm failed-start combustion monitoring (10.3.1.7) shuts the fuel supply valve automatically and that means are provided to purge unburnt mixture from the exhaust system.
  • Prohibit continuing gas operation with one cylinder cut off unless substantiated in the engine safety concept with acceptable torsional vibration (IGF 10.3.1.6 & UR M78 2.2.5 / 3.2.1).
  • Inspect independent crankcase and sump vents, lube-oil gas extraction, pre-mixed cylinder-head flame arresters, and UR M82/M9 relief valves before Class machinery surveys.

6. HSSC A.1207(34) Survey & PSC A.1206(34) Readiness Plus Engineering Support

Flag and Recognised Organisation surveyors verify NOx and IGF compliance against IMO Resolution A.1207(34), the 2025 HSSC survey guidelines (adopted 3 Dec 2025). Introduction paragraph 1.2 and Appendix 1 cover statutory amendments entering into force on or before 31 Dec 2025 (MARPOL Annex VI through MEPC.385(81), NTC 2008 through MEPC.317(74), and the IGF Code up to its 2020 amendments, MSC.475(102)). Because A.1207(34) omits 2026 and 2027 updates (MEPC.392(82), MEPC.398(83), MEPC.397(83)), ships need separate 2026 records for Arctic/Norwegian ECAs and Section 7.2 modifications.

Under A.1207(34) Annex 3 Section (A) 4 (IAPP), Initial ((AI)), Annual ((AA)), Intermediate ((AIn)), and Renewal ((AR)) surveys verify core NOx items. Initial surveys verify pre-certification and duty cycles ((AI) item 4.1.2.2.1) and conduct the NTC 6.2 onboard verification survey ((AI) item 4.1.2.2.1.1.1). Annual, intermediate, and renewal surveys confirm EIAPP Certificates ((AA) item 4.2.2.2.2), Technical Files ((AA) item 4.2.2.2.3), and Regulation 13.5.3 tier logs ((AA) item 4.2.2.2.6). They also inspect engine parameter record books or approved ERBs ((AA) item 4.2.2.2.4, with footnote 57 under (AA) item 4.2.2.4.3.1 citing MEPC.312(74)) and 1990 to 1999 Approved Methods ((AI) item 4.1.2.2.1.4, (AA) item 4.2.2.4.6). On non-IGC natural-gas ships, IGF Chapter 10 checks cover plans ((CI) item 2.1.3.6, (PI) item 5.1.2.6), gas-only installations ((CI) item 2.1.7.4.3, (PI) item 5.1.4.14.3), and cargo-ship annual/renewal checks ((CA) items 2.2.5.6, 2.2.5.8, 2.2.5.14 and (CR) items 2.4.6.2, 2.4.6.11).

Port State Control officers follow IMO Resolution A.1206(34) (2025 IMO PSC procedures, adopted 3 Dec 2025). Initial inspections (1.7.5, 2.2.3, 2.2.7) check Appendix 12 Part A documents: IAPP Certificate (item 15, Annex VI 6.1) and Regulation 13.5.3 tier/on-off logbook (item 39). Missing or unmaintained Part A entries create clear grounds (1.7.2, 2.4.1, 2.4.2.3) that escalate the inspection (1.7.6, 2.5.1). Officers can then check Appendix 12 Part B files (2.5.2): EIAPP Certificates (item 23, NTC 2.1.1.1), Technical Files (item 27, NTC 2.3.4), and engine parameter record books (item 28, NTC 2.3.7). A.1206(34) puts ERB confirmations in Appendices 3, 4, and 7 (ORB/CRB/GRB) rather than Annex VI, yet keeping the MEPC.312(74) confirmation beside Annex VI records prevents delays.

Appendix 18 guides detailed MARPOL Annex VI reviews: IAPP/Supplement data (2.1.2 to 2.1.3), Reg. 13.5.3 tier logs, actual Tier III operation, and Reg. 13.5.4 exemptions (2.3.2.1 to 2.3.2.3, 2.4.2), plus clear-grounds checks (2.5.3). Detailed checks (2.6.2.1 to 2.6.2.7) review EIAPP/Technical Files/parameter records, unapproved mods, Tier III maintenance and logs, 13.5.4 exemptions, 13.7 Approved Methods, pre-2000 major conversions, emergency-only diesel use, and MARPOL VI familiarity (2.6.14.2). Under Appendix 2 paragraph 5 (non-exhaustive items that may warrant detention), Annex VI grounds include absent valid IAPP, EIAPP, or Technical Files (item 1) and no Approved Method fitted after the first renewal survey on a 1990 to 1999 engine (over 5,000 kW, 90 litres per cylinder or more) for which one was certified and commercially available (item 5). Item 4 covers post-1999 engines above 130 kW failing Technical File conformity, required records, or Tier III ECA rules, while item 10 covers poor crew familiarity.

Operational readiness ties statutory paperwork to spark-gas combustion health. Unlogged swaps of designated ignition or gas-valve parts breach the NTC 6.2.2.7 to 6.2.2.8 record-keeping rules. Pairing Parameter Check logs with gas-valve calibration, ignition diagnostics, and PMS checks of IGF 10.3.3 shutdown sequencing protects survey clearance and reliability.

Marvel Solutionz supports shipowners and chief engineers with spark-gas diagnostics, EIAPP Technical File audits, MEPC.398(83) Section 7.2 modification planning, and IGF Chapter 10 verification. Book $350 USD for a 1-hour consultancy (+ 5% sales tax) or join the $395 USD self-paced (+ 5% sales tax) LNG, Dual-Fuel & Spark-Gas Academy. Corporate Team Training (up to 10 engineers) is $3,500 USD (+ 5% sales tax) at https://marvelsolutionz.com.

  • Keep one audit-ready binder holding IAPP/Supplement, EIAPP Certificates, approved Technical Files, each engine parameter record book (plus Flag ERB confirmation), and Regulation 13.5.3 ECA logs.
  • Verify watchkeeping engineers demonstrate MARPOL VI engine familiarity under A.1206(34) Appendix 18 paragraph 2.6.14.2, and separately confirm SOLAS/IGF 10.3.3 knowledge that gas shuts off no later than ignition on stop or ESD.
  • Maintain separate 2026 Canadian Arctic and Norwegian Sea ECA compliance records because A.1207(34) Introduction 1.2 stops at 31 Dec 2025.
  • Audit dry-dock spare orders so every designated NOx-critical gas valve, ignition assembly, and sensor matches its approved Technical File identification number.

Frequently Asked Questions

Does MARPOL Annex VI require an EIAPP Certificate for pure spark-ignited gas-only marine engines?

Yes, when output exceeds 130 kW on ships built on or after 1 Mar 2016, or fitted as added or non-identical replacements starting that date (MARPOL Annex VI Reg. 2.1.21, 13.1.1 and NTC 1.3.10 via MEPC.272(69)). Emergency units stay exempt (13.1.2.1).

Can an installed engine use MEPC.398(83) Section 7.2 for onboard Engine Family certification?

No. IMO Resolution MEPC.398(83), active since 1 Sep 2026, restricts Section 7.2 onboard substantial-modification and non-original tier certification strictly to an Individual Engine or Engine Group Parent (7.2.3). Engine Family certification is prohibited under both 2.2.4 and 7.2.3.

When do the new MEPC.397(83) Multiple Engine Operational Profile (MEOP) rules become mandatory?

MEPC.397(83) enters into force on 1 Mar 2027. Under operative paragraph 4, compliance applies by EIAPP issue date no later than 1 Jan 2028 for new individual or parent engines, and 1 Jan 2030 for new members joining pre-2028 families or groups.

Is IMO Resolution MEPC.402(83) methane slip and N2O testing mandatory for spark-gas ships?

No. MEPC.402(83) (adopted 11 Apr 2025) is strictly voluntary and does not amend NTC 2008. Submitting a Section 2 file (with Appendix 2 test data) lets the flag Administration issue an optional Appendix 3 Statement of emission values.

What is the core shutdown rule for gas-only spark-ignited engines under IGF Code 10.3.3?

Under mandatory IGF Code Section 10.3.3, any normal stop or ESD shall close gas fuel no later than the ignition source. Controls shall block cutting ignition unless cylinder or engine gas valves close first or simultaneously.

When do the Canadian Arctic and Norwegian Sea NOx Tier III ECAs apply to ships?

Under MEPC.392(82) (active 1 Mar 2026), Canadian Arctic NOx Tier III binds ships built on or after 1 Jan 2025 (13.5.1.3.1). Norwegian Sea uses a three-date rule (13.5.1.2.3): contract 1 Mar 2026, keel 1 Sep 2026 (no contract), or delivery 1 Mar 2030.

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.