Marine Exhaust Gas Cleaning System (EGCS / Scrubber) Washwater Monitoring, Overboard Spool Corrosion & ETM Compliance Guide

MARPOL Annex VI Reg. 4 and MEPC.340(77) EGCS scrubber guide covering pH, PAH and turbidity alarms, MEPC.1/Circ.883/Rev.1 and overboard spool corrosion.

← All technical guides · Category: Dual-Fuel & Marine Engines · Updated: · 14 min read

Key Takeaways (TL;DR)

  • MARPOL Annex VI Regulation 4.1 lets the flag Administration accept an approved exhaust gas cleaning system (EGCS, or scrubber) in place of compliant fuel. The fuel limits it must match are 0.50% m/m sulphur worldwide (Regulation 14.1) and 0.10% m/m inside a SOx emission control area (Regulation 14.4). Systems are approved under IMO Resolution MEPC.340(77) or the earlier MEPC.259(68), using Scheme A or Scheme B.
  • MEPC.340(77) Section 10 sets the overboard limits for pH, PAH, turbidity and nitrates. IMO guidance in MEPC.1/Circ.883/Rev.1 says to change to compliant fuel if a malfunction cannot be put right within one hour. It also says to report a malfunction lasting over one hour, or repeated malfunctions, to the flag and port State. A single failed sensor is handled differently: keep interim records and repair it as soon as practicable. MARPOL Annex VI Regulation 16.2.6 bans burning EGCS residues on board.
  • Before opening up the tower, check the washwater monitoring cabinet. Throttled samples, blocked vents and dirty optical windows can all give false alarms. In closed-loop mode, keep 50% caustic soda warm so it does not crystallise. Treat the overboard distance piece as a flooding risk. Choose corrosion-resistant material or a sound lining, gauge the wall thickness, and keep the ship-side valve and bilge alarms working (SOLAS II-1/15.8 and II-1/48, ICLL Reg. 22).

Marine EGCS scrubber alarms, likely causes, the rule or guidance behind each check, and first actions for the engine room.

Observed EGCS Alarm or SymptomLikely Mechanical, Optical or Chemical CauseRule, Guidance or ManualFirst Engine-Room Checks & Actions
High washwater turbidity (over 25 FNU or NTU above inlet, 15-minute rolling average) while SO2/CO2 stays steadyTiny gas bubbles in the sample cell from throttling on the inlet side, a film of soot or gypsum on the optical windows, or an overloaded closed-loop separatorMEPC.340(77) Sections 10.1.4 and 10.2, and the approved Onboard Monitoring Manual (OMM)Check the cabinet back-pressure valve and de-bubbler vent. Clean the windows as the OMM says. In closed-loop mode, check separator desludging. If the high reading is real and stays, go to the holding tank or compliant fuel.
High PAHphe reading (over 50 µg/L above inlet at 45 t/MWh)Poor combustion at low load, a fouled sensor window, or low washwater flow, which tightens the flow-adjusted limitMEPC.340(77) Section 10.1.3 and the ETM-A or ETM-BCompare washwater flow per MW with the ETM. Check injectors and low-load combustion. Run the OMM zero check on the PAH cell. On closed-loop units, check the water treatment.
Low overboard pH (below 6.5, or below the ETM plume limit)Low-alkalinity river or brackish water, a crystallised caustic line or tripped dosing in closed-loop mode, or a poisoned pH electrodeMEPC.340(77) Section 10.1.2 and the OMMCheck dilution flow or alkali dosing and trace heating. Check the probe in in-date pH 4 and pH 7 buffers. In brackish ports, run a hybrid unit in closed loop. If a real malfunction cannot be fixed within one hour, change to compliant fuel.
One gas analyser channel or one washwater sensor fails while the tower runs normallyPlugged sample filter, moisture in the gas analyser cell, cracked pH bulb or failed PAH lampMEPC.1/Circ.883/Rev.1 paragraphs 9 to 11 (IMO guidance)Check that the other readings still match their normal values. Record the readings when the fault began and the sulphur content of the fuels in use. For Scheme A, log the parameters that show compliant running. Repair or replace the sensor as soon as practicable.
SO2/CO2 ratio above 4.3 inside a SOx ECA or 21.7 outsideBlocked spray nozzles, a tripped washwater pump, low closed-loop alkalinity or a leaking bypass damperMARPOL Annex VI Regulations 4.1 and 14; MEPC.1/Circ.883/Rev.1 paragraphs 6 and 12Check washwater header pressure, the standby pump and the bypass damper sealing air. If the unit cannot be made compliant within one hour, change to compliant fuel and stop non-compliant discharge. Record the start time, duration and actions in the EGCS Record Book. Report a malfunction over one hour, or repeated ones, to the flag and port State.
Weeping, salt tracks or wall loss on the washwater overboard distance pieceAcidic chloride pitting through a damaged lining or at weld toes, made worse by galvanic contact with a noble alloy valveSOLAS II-1/15.8 and II-1/48, ICLL Reg. 22, IACS UR P2 and UR Z3Close the overboard valves and stop open-loop discharge. Change to compliant fuel or closed-loop holding. Check the bilge alarms. Gauge the full circumference, and tell the company and class before any repair.

1. MARPOL Annex VI Regs. 4 & 14, MEPC.340(77) Scheme A vs Scheme B & ETM / OMM / SECP Records

MARPOL Annex VI Regulation 4.1 lets the flag Administration accept an EGCS in place of low-sulphur fuel. The system must cut SOx emissions at least as well as compliant fuel would. The fuel limits are 0.50% m/m worldwide (Regulation 14.1) and 0.10% m/m inside a SOx emission control area (Regulation 14.4).

The SOx ECAs in force are the Baltic Sea, the North Sea, the North American area, the United States Caribbean Sea area and the Mediterranean Sea. The Mediterranean 0.10% limit has applied since 1 May 2025 (MEPC.361(79)). The Canadian Arctic and Norwegian Sea ECAs entered into force on 1 March 2026, with their 0.10% limit from 1 March 2027 (MEPC.392(82)). MEPC 84 adopted a North-East Atlantic ECA (MEPC.407(84)). It enters into force on 1 September 2027, and its limits apply 12 months later.

Since 1 March 2020, a ship may not carry fuel above 0.50% sulphur for its own use unless an approved EGCS is fitted. This carriage ban came in through MEPC.305(73) and is now part of Regulation 14 in the revised Annex VI (MEPC.328(76)). The EGCS is listed on the IAPP Certificate Supplement. Burn high-sulphur fuel only in the units connected to the scrubber.

Check which guideline your system was approved under. Operative paragraph 2 of MEPC.340(77) applies it to an EGCS on a ship whose keel was laid on or after 1 June 2022. On an older ship, it applies where the contract gives a delivery date for the EGCS on or after 1 June 2022. With no contract date, the actual delivery date counts. It also covers amendments under 4.2.2.4 or 5.6.3 made on or after 1 June 2022. Other systems stay under MEPC.259(68) or MEPC.184(59).

Under Scheme A, the unit itself is certified by testing across its load range. On board, compliance is shown through the operating parameters in the Scheme A Technical Manual (ETM-A), such as washwater pressure and flow, exhaust pressure drop and engine load. Where no continuous gas analyser is fitted, a daily SO2/CO2 spot check is added (Section 4.4.8).

Under Scheme B, a gas analyser after the tower measures the SO2/CO2 ratio all the time. Daily checks of the key operating parameters back it up, as set out in the ETM-B (Section 5.5.2). Both schemes need continuous washwater monitoring.

The Administration approves the ETM, the Onboard Monitoring Manual (OMM) and the SOx Emissions Compliance Plan (SECP). The EGCS Record Book is kept on board, and its entries stay on board for at least three years after the last one. It can be a paper book, part of the approved planned maintenance system, or an approved electronic record book (MEPC.312(74)).

The data recording device logs the monitored values against UTC and the ship's GNSS position, and shows whether the ship was inside an ECA. The data are kept for at least 18 months (Section 7.4). The device must be able to download a copy that shows any period out of limits. The Administration or port State control can ask for that copy (Section 7.5).

  • Check that every engine and boiler connected to the scrubber matches the IAPP Certificate Supplement and the SECP.
  • Confirm which guideline the system is approved under (MEPC.340(77) or MEPC.259(68)), and keep the ETM and OMM in the engine control room.
  • Test a data download from time to time. Check the timestamps, positions, ECA status and sensor channels, and that at least 18 months of data are held (Sections 7.4 and 7.5).
  • Make sure the EGCS Record Book holds calibrations, sensor changes, Scheme A spot checks, malfunctions, and residue storage and disposal.

2. MEPC.340(77) Section 10 Washwater Limits (pH, PAHphe, Turbidity, Temperature & Nitrates) & Monitoring Cabinet Diagnostics

Section 10.1.2 gives two ways to meet the pH limit. The first is pH 6.5 or more at the overboard discharge. During manoeuvring and transit, the outlet may be up to 2 pH units below the inlet. The second is a lower outlet limit worked out for the ship, which must still give pH 6.5 or more 4 m from the outlet when the ship is not moving. That limit is written into the ETM.

PAH and turbidity are measured after the treatment and dosing gear, but before any water added to dilute for pH. The PAH limit is 50 µg/L PAHphe above the inlet water (Section 10.1.3). It is set for a washwater flow of 45 t/MWh, counted against the combined MCR of the connected units. At higher flows the limit falls, and at lower flows it rises, following Table 5.

For a total of 15 minutes in any rolling 12 hours, the PAH reading may go up to double the limit. This covers an unusual start-up of the unit.

Turbidity must stay within 25 FNU or 25 NTU above the inlet water (Section 10.1.4). Inlet and outlet readings are not taken at exactly the same moment, so the difference is a rolling average over at most 15 minutes. For a total of 15 minutes in any rolling 12 hours, the reading may run up to 20% over the limit. Temperature is monitored and recorded too (Section 10.2.1).

Nitrates must stay within the level that matches 12% NOx removal, or 60 mg/L at 45 t/MWh, whichever is higher (Section 10.1.5). Take a sample from each EGCS in the first three months after installation, and in the three months before each renewal survey. Keep the lab results with the EGCS Record Book.

A turbidity or PAH alarm with clean stack readings can come from the sample cabinet rather than the tower. Warm washwater holds dissolved gas. If the sample is throttled on the inlet side, that gas can come out as tiny bubbles in the optical cell. The turbidity meter cannot tell bubbles from soot, so the reading climbs.

Keep the inlet valve fully open and set flow and back-pressure on the outlet side, as the OMM says. Keep the de-bubbler vent clear. Clean the windows with lint-free swabs and the cleaner the OMM names, never abrasive pads. Calibrate pH probes in fresh pH 4 and pH 7 buffers, and store spare probes wet in storage solution, never dry.

  • Set monitoring cabinet flow with the back-pressure valve on the outlet side, as the OMM says, so bubbles do not form in the optical cells.
  • Check the de-bubbler vent is clear. Compare inlet and outlet sensors on clean seawater before starting to scrub.
  • Clean the PAH and turbidity windows at the OMM intervals, and log the zero checks before and after cleaning.
  • Check pH probe slope and offset in in-date pH 4 and pH 7 buffers, check the temperature sensor, and keep spare probes wet.
  • Plan the shore lab nitrate sample in the three months before each renewal survey (Section 10.1.5), and file the results.

3. MEPC.1/Circ.883/Rev.1 Faults, Reg. 16.2.6 Residue Ban & Local Washwater Rules

MEPC.1/Circ.883/Rev.1 is IMO guidance, so it says what a ship 'should' do. IMO asked governments to bring it to the attention of Administrations and port State control. It separates three situations, and the engine room should know which one it is in.

First, a short spike above the emission limit, for example after a sudden load change, is not treated as a breach (paragraphs 7 and 8). The maker's ETM sets which conditions can cause such spikes and how far they may go.

Second, a failed monitoring instrument is not a malfunction of the system (paragraphs 9 to 11). If the other readings stay at their normal values, the fault is most likely in the sensor. Keep interim records: the readings when the fault began, the sulphur content of the fuels used since it started and, for Scheme A, the parameters that show compliant running. Repair or replace the sensor as soon as practicable.

Third, a malfunction is any condition that puts emissions over the limit. Find and fix it with the maker's troubleshooting steps, and record it in the EGCS Record Book. If the system cannot be brought back into compliance within one hour, the guidance says to change over to compliant fuel (paragraph 6). If there is not enough compliant fuel on board, send the flag and port State a proposed plan to bunker or repair, for their agreement.

Report any malfunction lasting more than one hour, or repeated malfunctions, to both the flag Administration and the port State (paragraph 12). Explain the steps being taken. If the ship has to continue its voyage out of compliance, tell the port State so it can decide what to do.

MARPOL Annex VI Regulation 16.2.6 bans burning EGCS residues in a shipboard incinerator. MEPC.340(77) Section 10.5.1 says residues should go ashore to adequate reception facilities, and should not be discharged to sea or burned on board. Washwater that cannot be shown to meet the limits counts as residue too (Section 10.1.7.2).

Section 10.5.2 asks for the storage and disposal of residues to be logged in the EGCS Record Book, with date, time and location. MEPC.1/Circ.900 gives IMO guidance on delivering these residues to port reception facilities. Keeping them apart from oily bilge water and sludge is good practice, and so is keeping any receipt the facility gives.

Annex VI equivalence does not stop a port or coastal State from setting its own rules. A number of ports and coastal States restrict open-loop washwater discharge, and some also restrict closed-loop bleed-off. MEPC.1/Circ.899 gives IMO guidelines for assessing the risks and impact of EGCS discharge water.

Check the rules for every port, river and canal on the voyage with the agent and P&I club when planning the passage (SOLAS V/34). On a hybrid scrubber, switch to closed loop before the boundary and check there is holding-tank space for the stay. On an open-loop-only scrubber, finish the changeover to compliant fuel before the boundary, then close and log the overboard valve.

  • Post a simple decision chart in the engine control room: short spike, single sensor fault (interim records), or malfunction (one-hour changeover and reporting under paragraphs 6 and 12).
  • Keep spare pH probes, PAH and turbidity parts, sample filters and in-date calibration gas on board, so a failed sensor can be put right as soon as practicable.
  • Post a notice at the incinerator that EGCS residues must not be burned (Reg. 16.2.6). Log each storage and disposal of residues with date, time and location (Section 10.5.2).
  • Check local washwater rules for every port and transit during passage planning, and plan holding-tank space or the fuel changeover in good time.

4. Closed-Loop / Hybrid Alkali Dosing (NaOH / MgO), Demister Carry-Over & MSC.581(110) Scrubber Entry

Open-loop scrubbers use the natural alkalinity of seawater. Closed-loop and hybrid systems pump process water round through a cooler and a treatment unit, and dose alkali to keep the pH up. Dosing chemicals include caustic soda (NaOH, for example as a 50% solution) and magnesium oxide or hydroxide.

50% caustic soda starts to crystallise at around 12 °C. If tank heating or trace heating fails in cold weather, crystals can block the dosing pump strainers and check valves. The loop pH then falls, SO2 capture drops, and acidic water reaches the process pumps and coolers. Overdosing causes the opposite problem, with scale on the plate cooler and spray nozzles.

A rising pressure drop across the tower at steady load points to soot, scale or a blocked demister. It raises exhaust back-pressure, which can push up exhaust and turbocharger temperatures. A clogged or damaged demister can let acidic droplets out of the funnel, where they attack deck fittings and paint.

Blocked tower drains or a failed high-level switch can let washwater back up the uptake towards the engines. Test the tower high-level trips, the drain water seals and the sealing-air fans on isolation and bypass dampers. If the company lists these as critical equipment under ISM Code 10.3, test them on that routine.

SOLAS II-2/4.2.2.6.1 asks for surfaces above 220 °C that leaking fuel could reach to be properly insulated. Check the lagging on hot uptakes after any damper or sensor work. In the dosing room, keep the eyewash and shower working, chemical PPE ready, and the bunds clean.

Going into a scrubber tower or process tank is enclosed-space entry. IMO Resolution MSC.581(110) gives the revised recommendations. SOLAS XI-1/7 asks for a portable atmosphere tester for at least oxygen, flammable gases, H2S and CO, with means to calibrate it. SOLAS III/19.3.3 asks for entry and rescue drills at least every two months.

Wet soot and standing water can use up oxygen and give off SO2, H2S and CO. Lock out the connected engines and boilers, the dampers, the washwater pumps and the dosing lines. Flush, cool and ventilate the tower. Test the air at several levels from outside, with ventilation stopped once conditions settle, then restart ventilation before entry.

Look for 20.9% oxygen, flammable gas below 1% LFL, CO2 below 0.5%, and toxic gases such as SO2 below half their occupational exposure limit. Keep testing while people are inside. The permit lasts no more than 8 hours, and it is invalid if ventilation stops or any condition changes. Rig SCBA and rescue gear at the hatch. EEBDs are for escape only.

  • In cold weather, check the caustic tank temperature, trace heating and dosing-cabinet heaters daily so 50% NaOH stays above about 12 °C.
  • Check the eyewash, shower, bund drains and chemical PPE at the dosing room before handling NaOH or MgO.
  • Trend tower pressure drop against engine load. Test the tower high-level trips and drain seals, and prove the damper limit switches and sealing-air fans.
  • Lock out uptakes, pumps and dampers before entry. Use the SOLAS XI-1/7 tester plus SO2 and CO2 testing, and keep entry permits to 8 hours at most (MSC.581(110)).

5. Overboard Distance-Piece Corrosion, Alloy 625 / Super-Duplex Integrity & Engine-Room Flooding Prevention

The washwater overboard distance piece sits between the ship-side valve and the shell plating. If it perforates, seawater can enter the engine room through a hole outboard of the valve. Before dilution, scrubber washwater can be warm, salty and strongly acidic. Turbulence from a nearby diffuser can strip protective films and speed up metal loss.

SOLAS II-1/15.8 and ICLL Regulation 22 cover machinery sea inlets and overboard discharges. They need readily accessible valves between the pipe and the shell, or on a sea chest, and the valve position must be easy to see. SOLAS II-1/15.8.5 and ICLL Reg. 22 call for steel, bronze or other approved ductile material. Ordinary cast iron is not accepted.

IACS UR P2 also bars ordinary cast iron for sea valves and ship-side pipes, and asks for a hydraulic test of ship-side valves below the load waterline.

If the distance piece is coated or lined carbon steel, one pinhole, scratch or weld undercut can expose bare steel. Next to a nickel-alloy or super-duplex valve, that small bare spot becomes the anode of a large galvanic cell. Pitting can then go through the wall quickly.

For newbuilds and dry-dock renewals, check what the distance piece and diffuser are made of. Options include solid or weld-clad Alloy 625 (UNS N06625), 6Mo stainless (UNS S31254), super-duplex (UNS S32750 or S32760) used within its temperature limits, or a glass-flake lining spark-tested free of holidays. Fit insulating sleeves and washers where a noble alloy bolts to coated steel.

Some installations add a second, power-operated shut-off valve inboard of the ship-side valve, sometimes linked to the scrubber shutdown. That is the maker's or yard's design choice, not a SOLAS or Load Line rule. Check what your approved drawings show, and test whatever valves are fitted.

In unattended machinery spaces, SOLAS II-1/48.1 asks for bilge wells with high-level alarms. Regulation 48.3 deals with controls for sea-inlet valves, discharges below the waterline and bilge injection. They must be placed so there is time to reach and operate them if water floods in. Where the possible flood level makes it necessary, they must work from above that level.

Under IACS UR Z3 and IMO Resolution A.1207(34), the outside of the bottom is examined twice in each five-year special survey period, with no more than 36 months between the two. Sea connections and overboard valves are examined at these bottom surveys.

Between surveys, put the distance piece in the planned maintenance system. Gauge its wall thickness on a marked grid, with extra points at the bottom of the pipe, the weld zones and the area behind the diffuser. Non-metallic ship-side expansion joints are inspected at the SOLAS I/10(a) surveys (II-1/26.9).

If you find weeping, salt tracks or thinning, do not weld, hammer or apply unapproved putty on a live hull penetration. Close the overboard valves and stop open-loop discharge. Change to compliant fuel or closed-loop holding. Check bilge pumping (SOLAS II-1/35-1), have damage-control plugs ready, and tell the company and class before any repair.

For help with EGCS washwater alarms, ETM and OMM questions or distance-piece specifications, Marvel Solutionz offers remote support at $350 USD for a 1-hour consultancy (+ 5% sales tax). The LNG, Dual-Fuel (DF) & Spark-Gas (SG) Academy is $395 USD self-paced (+ 5% sales tax). Corporate Team Training for up to 10 engineers is $3,500 USD (+ 5% sales tax).

  • Gauge each EGCS overboard distance piece and weld neck on a marked grid and trend the results, with extra points at the bottom of the pipe and behind the diffuser.
  • Stroke-test the ship-side valve and any inboard EGCS shut-off valve. Check the open/shut indicators, and check the controls can be reached and worked in time (SOLAS II-1/48.3).
  • Test bilge-well high-level alarms (SOLAS II-1/48.1). Inspect non-metallic ship-side expansion joints at the SOLAS I/10(a) surveys (II-1/26.9).
  • At dry dock, inspect the cladding or spark-test the lining inside the distance piece, check the insulating washers, and check the hull coating around the outlet.

Frequently Asked Questions

When does IMO Resolution MEPC.340(77) apply compared with MEPC.259(68), and how do Scheme A and Scheme B differ?

Operative paragraph 2 of MEPC.340(77), adopted on 26 November 2021, applies the 2021 guidelines to an EGCS on a ship whose keel was laid on or after 1 June 2022. On an older ship, it applies where the contractual delivery date of the EGCS is on or after 1 June 2022, or the actual delivery date if there is no contract date. It also covers amendments under 4.2.2.4 or 5.6.3 made on or after 1 June 2022. Scheme A certifies the unit and checks operating parameters in service, with daily SO2/CO2 spot checks where no continuous analyser is fitted. Scheme B measures the SO2/CO2 ratio all the time. Both need continuous washwater monitoring.

What are the continuous washwater pH, PAH, turbidity and nitrate discharge limits under MEPC.340(77) Section 10?

In short, pH must be 6.5 or more at the overboard discharge, or meet the ETM plume limit. PAHphe may be up to 50 µg/L above inlet at 45 t/MWh. Turbidity may be up to 25 FNU or NTU above inlet as a 15-minute rolling average. Nitrates must stay within the 12% NOx removal level or 60 mg/L at 45 t/MWh, whichever is higher. Temperature is recorded too. Section 2 of this guide gives the allowances and sampling dates.

How does MEPC.1/Circ.883/Rev.1 distinguish a single sensor failure from an EGCS breakdown exceeding 1 hour?

A single failed sensor, with the other readings normal, comes under paragraphs 9 to 11. Keep interim records and repair or replace the sensor as soon as practicable. No report is asked for at that stage. A malfunction is any condition that puts emissions over the limit. If it cannot be put right within one hour, the guidance says to change to compliant fuel. Report a malfunction lasting over one hour, or repeated malfunctions, to the flag and port State, and say what is being done about it.

Can EGCS scrubber sludge or off-spec washwater be burned in the shipboard incinerator under MARPOL Annex VI?

No. MARPOL Annex VI Regulation 16.2.6 bans burning EGCS residues on board. MEPC.340(77) Section 10.5 guidance says residues go ashore to adequate reception facilities and are not discharged to sea. Washwater that cannot be shown to meet the limits counts as residue. Log the storage and disposal in the EGCS Record Book with date, time and location.

Why do scrubber overboard discharge spool pieces suffer rapid perforation, and how do crews prevent engine-room flooding?

Before dilution, washwater can be warm, salty and strongly acidic. A small flaw in the lining of a carbon-steel distance piece next to a noble alloy valve can pit through quickly, outboard of the hull valve. Prevention combines corrosion-resistant material or a sound lining, insulation between metals, and regular thickness gauging. Keep the ship-side valves working with controls that can be reached in time (SOLAS II-1/48.3), and test the bilge alarms (II-1/48.1).

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.