IMO Resolution MEPC.300(72) (the BWMS Code, effective 13 October 2019) sets the type-approval rules for BWMS: automatic operation/failure logging (para. 4.17), 24-month data storage (para. 4.20), Part 5 self-monitoring reports (para. 4.19) and on-demand summaries (Annex Part 5 para. 5.5). Older systems approved under the 2008 G8 guidelines may differ, so check your Type Approval Certificate.
Where equipment can emit dangerous gases or liquids such as hydrogen, MEPC.300(72) requires at least two independent detection and shutdown channels (para. 4.5.3) plus redundant space gas detection tested to IEC 60079-29-1 or another Administration-accepted standard (para. 4.21).
Under MEPC.325(75) (in force 1 June 2022), initial and BWMS-installation additional surveys confirm a commissioning test (operative para. 5 resolves analysis should be indicative). Under MEPC.369(80) (in force 1 February 2025), failures, shutdowns, or critical alarms suggesting possible D-2 non-compliance go under BWRB Code F, excluding routine warnings.
IMO Unified Interpretation BWM.2/Circ.66/Rev.6 (Annex 2, para. 1.1) advises Administrations that sensor calibration (or replacement where non-calibratable) should follow maker intervals rather than the BWMS survey scheme. Certificate validity should be checked at annual, intermediate, and renewal BWM surveys.
UV intensity alarm or repeated flow throttling in river or estuary ports
UV reactor, lamps & quartz sleeves
Low ambient UV transmittance (UVT), scaled or fouled quartz sleeves, worn wiper rings, or aged UV lamps
Inspect wiper mechanism and run clean-in-place or manual sleeve cleaning per the maker manual, check UV sensor windows, throttle ballast pump flow inside Type Approval limits, and log critical failures under BWRB Code F.
Continuous backwash cycling or rising filter differential pressure
Automatic self-cleaning filter
Heavy harbour silt, blinded or torn mesh basket, fouled differential-pressure impulse lines, or stuck backwash valve
Check impulse tubing for mud locks, inspect backwash drive current and overboard valve stroke, open and examine screen mesh integrity, throttle pump flow within maker limits, and keep the emergency bypass closed.
Low Total Residual Oxidant (TRO) dosing during ballast uptake
Electrochlorination cells & rectifier
Brackish or cold water outside Type Approval SDL, calcified bipolar plates, low side-stream flow, or expired DPD reagent (on colorimetric units)
Compare sea temperature and salinity against Type Approval Certificate SDL values, verify side-stream pump flow and rectifier current, acid-clean plates per maker manual, and replace stale DPD reagents where colorimetric analysers are fitted.
High TRO alarm or neutraliser fails to clear oxidant on discharge
Neutraliser dosing skid & TRO monitor
Low neutraliser tank level, air-locked metering pump, plugged injection quill, or fouled TRO sample cell
Verify neutraliser chemical concentration and tank level, bleed the dosing pump, flush sample lines and optical or sensor cell per maker instructions, and confirm discharge valve interlocks stay shut until TRO clears.
Hydrogen gas pre-alarm or sudden shutdown in BWMS compartment
Degassing column, dilution blower & gas detectors
Failed dilution fan, blocked vent flame screen, cell housing leak, or drifted gas sensor
Leave the plant shut down, ventilate the space, verify dilution airflow switches and vent path, check redundant IEC 60079-29-1 (or accepted standard) detector calibration certificates, and log it under BWRB Code F if it stopped or affected a ballast uptake or discharge.
Console data gap, broken cabinet seal, or overdue sensor certificate
Confirm prior 24-month logs remain readable on board (para. 4.20), verify Annex Part 5 para. 5.5 summary export, inspect cabinet seals (para. 4.9.1), and arrange maker or maker-authorised checks per para. 4.10 and BWM.2/Circ.66/Rev.6.
1. BWMS Code (MEPC.300(72)) Scope, System Design Limitations & Commissioning
IMO Resolution MEPC.300(72) took effect on 13 October 2019 as the mandatory BWMS Code (via MEPC.296(72)). Units approved on or before 28 October 2018 under Guidelines (G8) (MEPC.174(58)) could still be installed where contractual delivery, or actual ship delivery if no contractual date existed, fell before 28 October 2020. Paragraph 1.5 notes that type approval does not ensure a plant will work on every ship or in every situation, and discharges must satisfy Regulation D-2 throughout the ship's life. The console, sensor and gas-safety rules in this guide apply to systems type-approved under the BWMS Code. Older systems approved under the 2008 G8 guidelines (MEPC.174(58)) may not have every feature, so check your Type Approval Certificate and maker manual.
Alongside Treatment Rated Capacity (TRC, para. 3.17), a BWMS approved under the Code carries validated System Design Limitations (SDL, para. 3.14) on its Type Approval Certificate. Typical SDL and other Type Approval Certificate limits cover seawater temperature range, minimum salinity for electrochlorination, holding time, and minimum UV transmittance or intensity. Under paragraph 4.17, control equipment must automatically track normal running or failure, and SDL values should be tracked and logged where practical.
Control consoles are also governed by Annex Part 5 self-monitoring rules. Under Annex Part 5 paragraph 5.3.6, the console must raise and time-stamp an alert whenever one monitored parameter moves outside its approved limit. Equally important for watchkeepers, an alert must also log when a combination of parameters breaches approved specifications, even if each single reading still sits inside its individual band.
Mandatory commissioning testing took effect on 1 June 2022 under IMO Resolution MEPC.325(75). Amended BWM Regulation E-1.1.1 (initial surveys) and Regulation E-1.1.5 (additional surveys for BWMS installation) require confirmation that a commissioning test showed the plant's mechanical, physical, chemical, and biological processes were working properly, considering IMO guidance. Operative paragraph 5 of MEPC.325(75) resolves that commissioning testing analysis should be indicative.
Before issuing an IBWM Certificate, MEPC.300(72) paragraph 8.2 requires the Administration to verify five records aboard the vessel in a suitable format. These include the BWMS Type Approval Certificate copy, the maker's operation, maintenance and safety manual, the ship's approved BWMP, installation specifications such as drawings and P&IDs, and installation commissioning procedures. Paragraph 8.3 lists six installation points the Administration should verify: installation to the technical installation specification, Type Approval conformity, installation to the maker's equipment specification, drawing-matched inlet and outlet positions, bulkhead or ballast-piping penetration workmanship to approved standards, and completed commissioning procedures.
Watchkeeping engineers benefit from posting a clear one-page summary of their ship's exact TRC and SDL limits beside the ballast console. When a vessel shifts from open-ocean salt water into a cold river berth or silty estuary, checking salinity, temperature, and expected turbidity against the Type Approval Certificate before opening sea suctions prevents avoidable alarms and cargo-loading delays.
Keep all five MEPC.300(72) paragraph 8.2 records aboard the vessel in a suitable format (good practice: keep copies easy to reach in the engine control room). Include the Type Approval Certificate copy, maker manual, ship BWMP, installation specifications, and commissioning procedures.
Confirm a Regulation E-1 commissioning test validated the installation at initial or installation survey (MEPC.325(75)), and file the test report alongside the vessel's IBWM Certificate.
Verify every watch engineer knows the ship's exact TRC flow limit, minimum salinity, temperature range, holding time, and UV intensity limits from the Type Approval Certificate.
Confirm SDL alarm thresholds and delay timers sit behind system-administrator password protection (MEPC.300(72) Annex Part 5 para. 5.3.8).
Both UV plants and electrochlorination designs fitted with pre-filtration rely on a fine automatic self-cleaning filter upstream of the treatment stage. Its job is to strip out larger organisms and suspended silt before water reaches UV lamps or electrolytic side-stream pumps. In shallow or silty berths, filter differential pressure rises rapidly, forcing repeated backwash cycles that reduce net ballast pumping capacity.
When differential pressure alarms persist even after backwashing, inspect the simple mechanical faults before condemning the screen mesh. Mud or marine growth inside the small-bore differential-pressure impulse tubes can freeze a pressure transmitter at a false high reading. Next, check the backwash overboard valve stroke, pneumatic or electric actuator air supply, suction-scanner drive motor current, and backwash pump discharge pressure against the maker manual.
If the filter screen mesh tears or a screen end-seal rolls out of its groove, differential pressure may suddenly appear low while raw silt floods downstream. In a UV reactor, suspended sediment scatters and absorbs ultraviolet energy, causing immediate low-intensity alarms and automatic flow throttling. Always inspect filter basket integrity, seals, and cleaning nozzles on the planned maintenance interval set in the maker manual.
Inside the UV chamber, medium-pressure or low-pressure lamps sit inside protective quartz sleeves. Calcium carbonate scale, iron deposits, oil sheen, and biofilm build up on the sleeve exterior over successive port calls, starving the water of UV dose even while lamps draw normal electrical power. Mechanical wiper rings help during operation, yet aged wiper elastomers can scratch quartz glass or leak ballast water into drive seals.
Chemical clean-in-place (CIP) flushes using the maker-specified acid solution dissolve mineral scale that wipers cannot shift. Follow the maker's safety sheet strictly for personal protective equipment, ventilation, flushing times, and neutralisation before draining spent cleaning fluid. Track UV lamp running hours and lamp ballast power-supply health closely, because older lamps lose UV output well before they burn out completely.
Never open the ballast bypass valve to speed up cargo turnaround when river water has low UV transmittance. Under MEPC.300(72) paragraph 4.18, control equipment automatically monitors and adjusts treatment dosages, intensities, or other control aspects needed for proper treatment. Throttling the ballast pump discharge valve within approved Type Approval limits lets the UV reactor hold valid dose smoothly without repeated trips. Under paragraph 4.8, all BWMS maintenance and repairs must be recorded, including every lamp, sleeve, wiper, and filter-screen replacement.
Flush and verify differential-pressure transmitter impulse lines whenever an automatic filter cycles continuously without obvious flow drop.
Open the filter housing on the maker's schedule to check screen mesh for pinholes or tears, inspect end-seals, and clear jammed backwash nozzles.
Monitor UV lamp running hours, clean quartz sleeves manually or via CIP per the maker manual, and stock spare wiper seals and O-rings.
Inspect UV intensity sensor optical windows during sleeve cleaning and record all BWMS maintenance and repairs under MEPC.300(72) paragraph 4.8.
3. Electrochlorination Cells, Salinity Limits, TRO Analysers & Neutralisation
Side-stream electrochlorination BWMS designs divert a portion of seawater through direct-current electrolytic cells to generate sodium hypochlorite on board, while full-flow designs treat directly in the main line. That oxidant doses the ballast uptake stream to maintain the maker's target Total Residual Oxidant (TRO) level. Because electrolysis relies on dissolved chloride ions, low seawater salinity in river or estuarine ports can push the system outside its Type Approval Certificate SDL.
When salinity drops below the approved threshold, rectifier voltage climbs while chlorine generation falls, triggering low-TRO or high-cell-voltage alarms. Some vessels include an approved dedicated seawater holding tank (such as an aft-peak tank) or brine-mixing system for low-salinity ports, operated strictly per the maker's approved manual and Ballast Water Management Plan. Never improvise chemical additions outside the Type Approval Certificate.
Even in full-strength ocean water, calcium and magnesium deposits slowly plate onto cathode surfaces inside electrolytic cells. Scale acts as electrical insulation, raising cell temperature and voltage while eroding active coating life. Inspect cell operating voltage trends against baseline commissioning figures and perform maker-approved acid cleaning before scale bridges plate gaps. Also inspect side-stream booster pumps, strainers, and flow switches, because starved cell flow causes rapid overheating.
Accurate TRO measurement governs both uptake treatment and discharge safety. Where colorimetric TRO analysers are fitted, they rely on DPD (N,N-diethyl-p-phenylenediamine) indicator and buffer reagents metered into a clean optical cell, whereas amperometric sensors measure electrochemically without DPD chemicals. Expired reagents, crystallised tubing, air bubbles in sample lines, or dirty cuvettes create false low readings during uptake and false high alarms during discharge. Store spare reagent kits inside the maker's temperature band and check expiry dates before every voyage.
MEPC.300(72) paragraph 4.3 requires treated ballast discharge to be safe for the environment across short and long voyages regardless of temperature. Where residual oxidant remains above the Type Approval discharge limit during deballasting, neutralisation skids typically inject sodium thiosulphate or sodium bisulphite under closed-loop control from the discharge TRO sensor. A typical deballasting stop occurs when a dry neutraliser mixing tank, air-bound diaphragm metering pump, or plugged injection quill prevents oxidant decay.
Verify neutraliser chemical stock, mixer operation, and dosing pump stroke well before starting deballasting in port. Confirm injection check-valves seal tightly so ballast main pressure cannot back-feed into the chemical tank. Under MEPC.300(72) paragraph 4.13, approved systems must not create long-term impacts on ship and crew safety from corrosion inside ballast piping, tanks, or adjacent spaces. Watch for abnormal corrosion near oxidant injection quills and neutraliser flanges during routine inspections.
Check local port salinity and seawater temperature against the Type Approval Certificate SDL before starting electrochlorination uptake.
Trend rectifier current, cell voltage, and side-stream flow during uptake, and schedule maker-approved acid cleaning when cell resistance climbs.
On colorimetric TRO analysers, verify DPD reagents are unexpired and optical cuvettes are clean. On all TRO sensors, check sample strainers and bubble-free sample flow.
Confirm neutraliser chemical level, pump priming, injection quill condition, and discharge TRO interlock response before deballasting.
4. Hydrogen Degassing Safety, Hazardous Areas & Redundant Gas Detection
Hydrogen gas is an unavoidable by-product of seawater electrolysis. Electrochlorination plants separate hydrogen from the hypochlorite solution inside a degassing column and sweep it overboard through dedicated dilution blowers and safe-area vent piping. Any loss of dilution airflow, a fouled flame screen, or a leaking cell gasket can let explosive hydrogen mixtures collect inside the BWMS room or machinery space.
IMO Resolution MEPC.300(72) places strict mandatory safeguards on plants capable of emitting dangerous gases or liquids. Under paragraph 4.5.3, such equipment needs at least two independent detection and shutdown channels to guard against lower explosive limits (LEL) or toxic concentrations dangerous to crew health. Paragraph 4.6 further requires Administration-accepted risk controls covering safe storage, dosing application, fitting, and crew handling of any hazardous substances.
Paragraph 4.21 sets the hardware standard for space gas monitoring. Redundant safety gas detectors must be fitted in the BWMS compartment, designed and tested to IEC 60079-29-1 or another recognised standard accepted by the Administration. On detecting leakage, the system must trigger local audible and visual alarms plus alerts at a staffed BWMS control position, paired with independent shutdown.
Hazardous-area installation rules also apply directly under paragraph 4.12. Electrical components belonging to the BWMS must either sit outside hazardous zones or hold Administration certification for safe hazardous-area operation. Moving parts situated inside hazardous zones must be arranged to avoid static electricity build-up. During routine engine-room rounds, check Ex-rated junction boxes, cable glands, earthing straps, and door seals around degassing skids.
Operational safety depends equally on keeping the ventilation path unobstructed. Test dilution blower pressure or airflow interlock switches during maintenance so the control system blocks cell start-up whenever forced ventilation fails. Inspect the deck-level hydrogen vent outlet flame screen for salt crust, paint overspray, or nesting debris that could choke degassing flow and raise back-pressure in the separator tank.
Whenever a hydrogen pre-alarm or high-gas shutdown occurs, treat it as a real leak until proven otherwise. Keep the BWMS shut down and de-energised, verify mechanical ventilation is running, and test the space atmosphere with a calibrated portable gas detector before entering. Check redundant sensor calibration dates, inspect cell gaskets and degassing pipe joints, and record it under Ballast Water Record Book Code F if it stopped or affected a ballast uptake or discharge.
Verify both redundant IEC 60079-29-1 (or Administration-accepted standard) hydrogen detectors in the BWMS space trigger local plus manned BWMS control-station alarms (para. 4.21) and hold valid calibration records (para. 4.10 and BWM.2/Circ.66/Rev.6).
Test both independent detection and BWMS shutdown channels on the maker's maintenance schedule (design requirement under MEPC.300(72) para. 4.5.3).
Check dilution blower airflow switches, motor current, and open-deck vent flame screens before running electrolytic cells.
Inspect hazardous-area electrical enclosures, cable glands, and bonding straps around degassing equipment for intact certification integrity (para. 4.12).
Digital audit trails sit at the heart of modern BWMS surveys and port State control checks. Under MEPC.300(72) paragraphs 4.17, 4.19, 4.20, and Annex Part 5 paragraph 5.5, a Code-approved control console must log proper operation or failure automatically without user interaction, produce Part 5 self-monitoring reports, and retain at least 24 months of history. If the control hardware is ever replaced, previously stored history must remain accessible on board for the full 24 months.
Annex Part 5 paragraphs 5.3 through 5.8 define console log content and format. Subject to Administration waivers under 5.2, required items include ship particulars, BWMS serial number, TRC, operating and bypass modes, and outlet flow rate time-tagged where applicable (5.3.1 to 5.3.2). Time-stamped alerts cover in-service shutdowns, maintenance prompts, and bypass or mode valve status (5.3.4 to 5.3.5). Automatic position and holding-time recording is recommended under 5.3.3, otherwise entered manually in the BWRB. Consoles must create on-demand text summaries covering individual ballast runs (5.5) and store data in an acceptable readable format such as text, PDF, spreadsheet, or XML for display, printing, or export (5.6).
Data integrity protections are mandatory. Permanent deletion of stored recordings must be impossible (Annex Part 5 para. 5.8), and any attempt to interfere with recorded or live data must be logged (5.7). Under Annex Part 5 paragraph 5.3.8, SDL limits, ranges, alarm set-points, and alert delays must sit behind system-administrator passwords. Password-protected changes and sensor faults such as wire breaks or out-of-range signals must be logged automatically and retrievable at maintenance access level. Paragraph 4.22 requires a traceable change-handling procedure for all software changes introduced after the pre-test evaluation.
Physical anti-tampering and bypass controls are specified in paragraphs 4.9 and 7.2. Any physical access beyond essential paragraph 4.8 maintenance must require breaking a seal (4.9.1). Where applicable, whenever the plant runs in cleaning, calibration, or repair mode, visual indication must activate and the console must record the event (4.9.2). Under paragraph 4.9.3, connections must ensure any bypass triggers an alarm and console log, while paragraph 7.2 requires emergency bypasses or overrides to activate an alarm and be recorded in both the control console and the Ballast Water Record Book.
Paragraph 7.3 draws a helpful operational line for watchkeepers. Paragraph 7.2 bypass rules do not apply to internal ballast transfers within the ship, such as anti-heeling adjustments. However, where a BWMS circulates water internally or performs in-tank treatment affecting D-2 compliance, the paragraph 7.2 records (control console and BWRB) must still identify those internal transfer operations. Paragraph 4.7 also requires audible and visual alarms at every ballast-control station for any failure compromising proper BWMS operation.
Sensor accuracy verification carries a vital IMO clarification. MEPC.300(72) paragraph 4.10 requires facilities to verify measuring components at renewal surveys and per maker instructions, with dated calibration certificates retained on board and checks performed exclusively by the maker or maker-authorised personnel. IMO Unified Interpretation BWM.2/Circ.66/Rev.6 (Annex 2, para. 1.1) advises Administrations that accuracy checks (or replacement where a sensor cannot be calibrated) should follow maker intervals rather than being mandatorily linked to the BWMS survey scheme. Calibration-certificate validity should be checked at annual, intermediate, and renewal BWM surveys.
Run a test output from the BWMS console to verify Annex Part 5 summary files and 24-month historical logs (MEPC.300(72) paras. 4.19, 4.20 and Annex Part 5 paras. 5.5, 5.6). Confirm they display, print, or export cleanly in text, PDF, spreadsheet, or XML.
Inspect physical tamper seals on protected BWMS enclosures (para. 4.9.1) and verify bypass connections trigger alarms and console logs (paras. 4.9.3 and 7.2).
Confirm sensor calibration certificates from the maker or maker-authorised technicians follow maker-specified intervals and stay valid for checks at annual, intermediate, and renewal BWM surveys (para. 4.10 and BWM.2/Circ.66/Rev.6 Annex 2 para. 1.1).
Verify representative ballast discharge sampling facilities installed under paragraph 7.1 are undamaged, clean, and accessible.
6. Revised BWRB Codes A to H (MEPC.369(80)), Electronic Logs & PSC Readiness
On 1 February 2025, IMO Resolution MEPC.369(80) replaced the BWM Convention Appendix II Ballast Water Record Book format with eight lettered operational codes. Under BWM Regulation B-2.5, every ballast operation must be fully recorded without delay. The responsible officer signs every completed entry, and the master signs each finished paper page or verifies groups of electronic entries in a timely manner (MEPC.383(81)).
The eight codes separate every movement clearly: Code (A) records ballast uptake, Code (B) records discharge into the aquatic environment, and Code (C) records ballast exchange, internal circulation treatment, or in-tank treatment. Code (D) covers reception or port-based transfers, while Code (E) covers accidental or exceptional ballast water movements. Code (F) records BWMS failures and inoperabilities, Code (G) covers tank cleaning and sediment disposal, and Code (H) covers extra operational procedures and general notes.
Engine-room and bridge officers should pay close attention to Code F and its official footnote in MEPC.369(80). Code F applies to faults, shutdowns, or critical alarms pointing toward a system breakdown and possible D-2 non-compliance, excluding routine notices and warnings. Each Code F entry records failure time and location (F.1), the uptake or discharge operation underway (F.2), a description of the alarm or fault (F.3), and the time and location when the BWMS is restored to service (F.4).
Electronic BWRB provisions became effective on 1 October 2025 under IMO Resolution MEPC.383(81). New Regulation A-1.9 defines an electronic record book as an Administration-approved device or system used instead of a paper book. Amended Regulation B-2.1 confirms the BWRB may be electronic or built inside another shipboard log or management system. Electronic record books require Administration approval considering IMO guidelines, and amended Regulation B-2.5 requires timely master verification of electronic entry groups.
Under BWM Convention Article 9 and IMO Resolution A.1206(34) (paras. 1.2.1.13 and 2.2.3), initial PSC inspections check the IBWM Certificate and BWRB (Appendix 12, Part A, items 17 and 42) alongside overall ship and engine-room condition (para. 2.2.4). A.1206(34) Appendix 21 lists IMO Resolution MEPC.252(67) as the guidelines for port State control under the BWM Convention. Section 2.1 of MEPC.252(67) sets out four stages. The initial inspection checks documents, including that the approved BWMP is on board (para. 2.2.1.2), looks at the BWMS and checks crew familiarity (section 2.2). If there are clear grounds, a more detailed inspection checks BWMS operation and self-monitoring indicators. Sampling with indicative analysis may also be taken, and detailed D-2 analysis follows only if needed. In a more detailed inspection, inspectors may also use the Appendix 12 Part B documents (A.1206(34) para. 2.5.2), which include the BWMP (item 39). Cross-checking recent console summaries against BWRB Codes A, B, and F before arrival catches gaps or clock offsets early. If a Code F failure happens in port, follow the approved BWMP and check what your flag Administration or port authority asks for.
When recurring UV low-intensity alarms, electrochlorination cell scaling, or commissioning disputes threaten schedule reliability, Marvel Solutionz provides direct technical support. Senior engine-room troubleshooting is available at $350 USD for a 1-hour consultancy (+ 5% sales tax). For structured fleet upskilling, the LNG, DF & SG Academy is $395 USD self-paced (+ 5% sales tax), and Corporate Team Training for up to 10 engineers is $3,500 USD (+ 5% sales tax).
Verify the vessel uses the revised MEPC.369(80) Codes A to H Ballast Water Record Book layout (or an Administration-approved electronic BWRB under MEPC.383(81) with timely master verification).
Cross-check recent BWMS console timestamps, outlet flows, bypass alarms, and critical shutdowns against BWRB Codes A, B, and F before arrival.
Confirm console clocks match UTC or ship time consistently so log exports reconcile cleanly with bridge and engine-room records.
Brief deck and engine-room officers on the exact contingency actions in the vessel's approved BWMP if a Code F failure prevents D-2 discharge.
Frequently Asked Questions
How long must a type-approved BWMS keep control and monitoring data?
For a BWMS type-approved under the BWMS Code, IMO Resolution MEPC.300(72) paragraph 4.20 and Annex Part 5 paragraph 5.8 require the control and monitoring system to retain recorded history over a minimum 24-month period, and permanent deletion must be impossible. If the control hardware is replaced, prior stored logs must remain accessible on board across 24 months. Older G8-approved systems may differ, so check the Type Approval Certificate.
Who may calibrate BWMS measuring sensors, and how often?
Under MEPC.300(72) paragraph 4.10, sensor accuracy checks must be carried out exclusively by the maker or maker-approved technicians, with the dated calibration certificate kept on board. IMO Unified Interpretation BWM.2/Circ.66/Rev.6 (Annex 2, para. 1.1) advises that accuracy checks (or replacement where non-calibratable) should follow maker intervals rather than the BWMS survey scheme. Certificate validity should be checked at annual, intermediate, and renewal BWM surveys.
Which alarms require a Ballast Water Record Book Code F entry under MEPC.369(80)?
Per the MEPC.369(80) footnote to Code F, log faults, shutdowns, or critical alarms pointing toward a BWMS breakdown and possible D-2 non-compliance, excluding routine notices and warnings. Record failure time and location (F.1), the operation underway (F.2), the fault description (F.3), and restoration time and location (F.4).
What hydrogen detection safeguards apply to electrochlorination BWMS units?
Under MEPC.300(72) paragraph 4.5.3, systems able to emit dangerous gases or liquids require at least two independent detection and shutdown channels. Paragraph 4.21 requires redundant gas detection in the BWMS compartment tested to IEC 60079-29-1 (or another Administration-accepted standard) with local and manned BWMS control-station alarms plus independent shutdown.
Do internal anti-heeling transfers trigger MEPC.300(72) bypass alarms?
No. MEPC.300(72) paragraph 7.3 states that paragraph 7.2 bypass alarm and recording rules do not apply to internal ballast transfers such as anti-heeling. However, if the BWMS performs internal circulation or in-tank treatment affecting D-2 compliance, the paragraph 7.2 records (control console and BWRB) must still identify those internal transfer operations.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/ballast-water-management-system-uv-electrochlorination-and-tro-guide/