MARPOL Annex I Regulation 14 asks ships of 400 GT and above (apart from the stationary ships and waivers in Regs. 14.3 and 14.5) for approved oil filtering equipment that holds the overboard water at 15 ppm of oil or less (Reg. 14.6). From 10,000 GT, and on a smaller ship that may pump ballast water from its fuel oil tanks to sea, the equipment also needs a 15 ppm alarm and an automatic stop (Reg. 14.7). Inside a special area, any ship of 400 GT and above may only discharge through Reg. 14.7 equipment (Reg. 15.3.2).
MEPC.107(49) gives two different time limits. The bilge alarm display should show a changed sample within 5 seconds (para. 4.2.6). The whole installation, alarm included, should stop overboard flow no more than 20 seconds after the effluent goes above 15 ppm (para. 6.2.1). The plus or minus 5 ppm accuracy is set in the type-approval test (Annex Part 2, para. 2.2.1), and para. 4.2.5 says readings should stay within it at all times. The maker's calibration checks it, not the crew.
The alarm keeps a record of date, time, alarm status and separator operating status for at least 18 months (para. 4.2.9). Since MEPC.285(70), the maker or a person the maker authorises should calibrate it at intervals of five years or less from commissioning, or sooner if the maker's instructions say so. The surveyor checks the certificate at every annual, intermediate and renewal IOPP survey.
Effluent goes above 15 ppm within minutes of starting
Primary gravity stage / coalescer
Solvent degreasers, alkaline cleaners, soot or rust fines forming a stable emulsion in the bilge holding tank
Keep solvent cleaners out of the bilge wells, let the holding tank settle, skim the top oil to the sludge tank, and renew fouled coalescer elements.
15 ppm alarm stays in alarm during a clean-water flush
15 ppm bilge alarm measuring cell
Designed behaviour (para. 4.2.10.2 makes clean-water flushing raise the alarm) or a stained cell window
Confirm the alarm clears once the flush valve closes and effluent returns. Clean the cell as the maker's manual says; any access beyond the drift and zero checks breaks a seal (para. 4.2.10.1), so record it.
Three-way diverting valve slow to change over, or passing towards overboard
Automatic stopping device (paras. 3.6 and 6.2.1)
Low control-air pressure, a solenoid fault or scale on the valve seat
With the overboard valve shut, use the recirculation line (para. 6.1.1) to time the whole system against the 20-second limit (the alarm's own response included), overhaul the seat, and record the failure in ORB Part I Code F.
Volume in ORB Code D does not fit the separator's rated throughput
Supply pump / ORB Part I records
Feed pump wear, air drawn in at the suction, or misread tank soundings
Check the supply pump capacity is no more than 110% of the separator's rated capacity (MEPC.107(49) para. 6.1.2), then compare Code D Items 13 and 14 with soundings, tank tables and the alarm record.
Regulation 14 sets the equipment by size. A ship from 400 GT up to 9,999 GT needs oil filtering equipment of a design the Administration has approved, able to hold the treated water at 15 ppm of oil or less (Regs. 14.1 and 14.6). A ship of 10,000 GT or more needs the Reg. 14.7 version, which adds an alarm for when 15 ppm cannot be held and an automatic stop of the discharge (Reg. 14.2). A smaller ship that may discharge ballast water held in its fuel oil tanks must meet the same Reg. 14.7 standard (Reg. 14.1).
Regulation 15 sets the conditions for discharge. Outside special areas, a ship of 400 GT and above may pump machinery-space bilge water overboard only when it is proceeding en route, the water has passed through Reg. 14 equipment, and the effluent is 15 ppm or less without dilution (Reg. 15.2). On an oil tanker, the water must not come from the cargo pump-room bilges or be mixed with cargo oil residues. Since MEPC.265(68), this part of Reg. 15 no longer covers Arctic waters.
Inside a special area the same conditions apply, but the equipment must be the Reg. 14.7 type with the alarm and automatic stop (Reg. 15.3.2). In the Antarctic area no oil or oily mixture may go into the sea from any ship (Reg. 15.4). The Polar Code bans the same in Arctic waters (Part II-A, para. 1.1.1). Oil residues that cannot go overboard under Reg. 15 stay on board for a reception facility (Reg. 15.9).
Keep the sludge system apart from the bilge system. Since MEPC.266(68), a sludge tank may have no discharge connection to the bilge system, the oily bilge water holding tank, the tank top or the separator (Reg. 12.3.3). There are two exceptions. Drains fitted with hand-operated valves that close by themselves may lead settled water to the bilge holding tank or a bilge well, with a way to see the water afterwards (Reg. 12.3.3.1). The sludge and bilge lines may also share common piping to the standard shore connection, as long as sludge cannot pass into the bilge system (Reg. 12.3.3.2). No sludge piping may connect directly overboard except that shore connection (Reg. 12.3.4).
Check the IOPP Supplement (Form A, or Form B on a tanker) items 2.3 and 2.4 against the fitted equipment: the approval standard ticked (A.393(X), MEPC.60(33) or MEPC.107(49)) and the maximum throughput in m3/h.
Confirm the supply pump capacity is no more than 110% of the separator's rated capacity (MEPC.107(49) para. 6.1.2).
Mark special area and polar water limits on the passage plan. Brief the watch: no oily bilge water overboard in Arctic or Antarctic waters, and only through Reg. 14.7 equipment inside a special area.
Check that sludge-tank drains have working self-closing valves and a way to see the drained water (Reg. 12.3.3.1), with no temporary hose or spool piece joining sludge and bilge lines.
2. Breaking Chemical Emulsions & Protecting Coalescer Stages
MEPC.107(49) superseded MEPC.60(33), and its type-approval tests include an emulsion. Test Fluid C is fresh water mixed with residual and distillate fuel, a surfactant and fine iron oxide (Annex Part 1, para. 1.2.4). The resolution asks Governments to apply the new specification, where reasonable and practicable, to any equipment fitted on board from 1 January 2005. It also warns that cleaning agents, emulsifiers, solvents and surfactants can emulsify bilge water, and asks ships to keep them out of the bilges where they can.
Even a unit approved to MEPC.107(49) can struggle with heavy doses of degreaser, boiler chemicals, soot washings or biological slime from stagnant wells. These can blind coalescer plates and polishing cartridges. Start conditioning in the bilge holding tank, before the separator pump runs. Use cleaners that the separator maker accepts, and only as much as needed. Keep parts-washer solvent in drums for the sludge tank or shore disposal.
Where the holding tank has heating and the maker allows it, gentle heat helps free oil rise for skimming to the sludge tank. Never add anything to hide or disperse oil in the overboard effluent. Regulation 15.8 bans any discharge containing chemicals or other substances put in to get round the discharge conditions.
When pressure loss rises across the coalescer or polishing stage, isolate and depressurise the unit as the maker's manual says. Inspect the oil-attracting plates or filter cartridges for slime and asphaltene build-up. Test the heater thermostat and the oil discharge valve. Record any period the separator is out of service.
Let bilge water settle in the holding tank and skim the separated oil to the sludge tank before starting the separator.
Stock only cleaners the separator maker accepts, and send cooler or turbocharger chemical washings to their own waste tank.
Watch the pressure gauges across the coalescer and polishing stages to spot blinding or damaged elements early.
Flush the separator with clean water at the end of a run, after shutting the overboard valve.
Under MEPC.107(49) para. 4.2.5, the ppm reading should not be thrown by emulsions or by the type of oil. The type-approval test asks for accuracy within plus or minus 5 ppm, even with contaminants other than oil present and with the power supply 10% off its design value (Annex Part 2, para. 2.2.1). Para. 4.2.5 also says readings should stay within that limit at all times. The alarm should not need calibrating on board, but the crew may test it as the maker's instructions allow.
Keep the two time limits apart when you test. Para. 4.2.6 gives the alarm itself 5 seconds to show a changed sample on its display. Para. 6.2.1 gives the whole installation no more than 20 seconds, from effluent above 15 ppm to the automatic stopping device blocking overboard discharge. That 20 seconds includes the alarm's own response.
The alarm guards itself against misuse. Its alarm contact should also trip if the unit fails, is warming up or loses power (para. 4.2.7). The crew should have a simple way to check drift, repeatability and the zero (para. 4.2.8). Any access beyond those checks needs a seal to be broken (para. 4.2.10.1). Clean water used for cleaning or zeroing should always set off the alarm (para. 4.2.10.2), so a flush cannot hold the overboard path open.
The recorder keeps date, time, alarm status and separator operating status for at least 18 months, and can display or print them for an inspection (para. 4.2.9). If the alarm unit is changed, the old records should remain readable on board for 18 months. MEPC.285(70) rewrote para. 4.2.11. The surveyor checks that the calibration certificate is valid at annual, intermediate and renewal IOPP surveys. The maker, or a person the maker authorises, should calibrate and test the alarm at intervals of five years or less from commissioning, or within the maker's shorter term. A calibrated replacement unit is the alternative. Keep the latest calibration certificate on board.
With the overboard valve shut, confirm that opening the clean-water flush valve raises the alarm and sends the stopping valve back to the bilge or holding tank.
Time both limits: no more than 5 s for the alarm display (para. 4.2.6) and no more than 20 s for the full diversion (para. 6.2.1).
Keep the sample line valves open and the line clear, so the cell gets a representative sample at adequate pressure and flow (para. 6.2.2).
Check the calibration due date before every IOPP survey, and keep any replaced unit's 18-month record available on board.
4. Closed-Overboard Recirculation Line & Oil Record Book Part I Code D
MEPC.107(49) para. 6.1.1 asks for a sampling point on a vertical section of the effluent pipe, as close as practicable to the separator outlet. It also asks for a recirculation line placed just downstream of the stopping device, next to its overboard connection. That line lets the crew test the separator, the 15 ppm alarm and the stopping device with the overboard valve shut. It should be arranged so that it can never bypass the separator.
Oil tankers from 150 GT and all other ships from 400 GT must carry an Oil Record Book Part I (Reg. 17.1). Keep each book for three years from its final entry (Reg. 17.6). Since MEPC.314(74), in force from 1 October 2020, the book may be electronic if the Administration has approved it. MEPC.312(74) section 5 adds that the ship should carry the Administration's written declaration for that system.
Manual bilge operations go under Code D. Item 13 is the quantity in m3 and Item 14 is the start and stop time. Item 15 is the method: 15.1 through the 15 ppm equipment with positions at start and end, 15.2 to a reception facility with the port, and 15.3 to a slop, holding or other tank with the quantity kept.
Regulation 17.5 says every breakdown of the filtering equipment must go in the ORB Part I. That goes under Code F: time of failure (Item 19), time it was working again (Item 20) and the reason (Item 21). While the equipment is down, there is no lawful route overboard through it (Regs. 15.2.2 and 15.3.2). Keep bilge water in the holding tank or land it to a reception facility. Code I covers other operational procedures and general remarks. If your company seals the overboard valve, record the seal numbers as its procedure says.
Test the separator, alarm and stopping device on the para. 6.1.1 recirculation line with the overboard valve shut, and record the test as your company procedure says.
Compare Code D Items 13 to 15.1 with the alarm record, deck log positions and the separator's rated throughput in m3/h.
Record any separator, alarm or stopping valve failure under Code F (Items 19 to 21).
If the overboard valve is sealed, keep the seal register up to date and matching the numbers on the valve.
5. Port State Control Checks Under IMO Resolution A.1206(34)
A.1206(34) Appendix 2 lists MARPOL Annex I items that may be grounds for detention. They include oil filtering equipment, an oil discharge monitoring system or 15 ppm alarm that is missing, badly deteriorated or not working properly. They also include too little sludge or slop tank space for the intended voyage, no Oil Record Book on board, an unauthorised discharge bypass, and oily bilge water or oil residue built up in the machinery spaces. In United States ports, knowingly breaking MARPOL or the Act to Prevent Pollution from Ships is a criminal offence under 33 U.S.C. section 1908, and civil penalties also apply.
Appendix 3 sets out the Annex I inspection. The PSCO starts with the IOPP Certificate, its Supplement and the Oil Record Book. An electronic ORB is accepted when the Administration's declaration can be shown; otherwise a hard copy record book has to be shown. The engine-room visit begins with a general impression, including any oil in the bilges and how the ship disposes of oily water. With clear grounds, the PSCO looks more closely at the equipment listed in the IOPP Supplement and checks for unapproved changes.
Where there are clear grounds, Appendix 7 (Part 2, para. 1.5) lets the PSCO weigh the oil residue produced against the sludge and bilge holding tank capacity and the separator capacity. It also covers whether reception facilities were used and whether the responsible officer knows how to handle sludge and bilge water. The Code of Good Practice in Appendix 1 says PSCOs ask the crew to demonstrate equipment, rather than testing it themselves (para. 15). So the engineer on watch should be able to run the separator and show the alarm and stopping device working.
Before arrival, compare recent alarm records with Code D and the record of any recirculation tests. Make sure the engineers know how a Code F entry is made. Marvel Solutionz offers senior marine engineering consultancy at $350 USD for a 1-hour consultancy (+ 5% sales tax). The LNG, DF & SG Academy is $395 USD self-paced (+ 5% sales tax), and Corporate Team Training for up to 10 engineers is $3,500 USD (+ 5% sales tax).
Have ready the IOPP Certificate and Supplement, ORB Part I (and the Administration's declaration if the book is electronic), reception facility receipts and the current 15 ppm alarm calibration certificate.
Check that every overboard run in the alarm's 18-month record matches a Code D Item 15.1 entry, a Code E (Item 16) entry for automatic discharge, or a recorded recirculation test.
Walk the separator, sample point, three-way valve and sludge shore connection, and check the bilge wells are clean and any seals intact.
Brief the engineers to run the separator and show the alarm and stopping device working safely if a PSCO asks.
Frequently Asked Questions
What does a 15 ppm bilge alarm's 18-month memory record?
Under MEPC.107(49) para. 4.2.9, it logs the date, the time, the alarm state and whether the separator was running, for at least 18 months, and it can display or print them for an inspection. If the alarm unit is replaced, the old records should remain readable on board for 18 months. Para. 4.2.9 does not ask it to record valve positions.
How often should a 15 ppm bilge alarm be calibrated under MEPC.285(70)?
MEPC.285(70) replaced MEPC.107(49) para. 4.2.11. The maker, or a person the maker authorises, should calibrate and test the alarm at intervals of five years or less from commissioning, or within the maker's shorter term. A calibrated replacement unit is the alternative. The surveyor checks that the calibration certificate is valid at annual, intermediate and renewal IOPP surveys.
What is the difference between the 5-second and 20-second limits in MEPC.107(49)?
Para. 4.2.6 gives the alarm instrument 5 seconds to show a change in the sample on its display. Para. 6.2.1 gives the whole installation, alarm included, no more than 20 seconds from effluent above 15 ppm until the automatic stop blocks the overboard flow.
Can a ship of 400 to 9,999 GT pump bilge water overboard inside a MARPOL Annex I special area?
Only if its oil filtering equipment meets Reg. 14.7, with the 15 ppm alarm and automatic stop, and every other Reg. 15.3 condition is met, including proceeding en route. No oil or oily mixture may go overboard in the Antarctic area (Reg. 15.4) or in Arctic waters (Polar Code Part II-A, para. 1.1.1).
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/15-ppm-oily-water-separator-coalescer-and-bilge-alarm-guide/