FuelEU Maritime (EU 2023/1805, Article 6) applies to containerships and passenger ships strictly exceeding 5,000 GT moored at EU quays for 2 hours or more. Mandatory OPS begins 1 January 2030 in AFIR ports and 1 January 2035 in other OPS-equipped ports.
Non-compliant berth stays incur an Article 23(5) penalty of EUR 1.5 multiplied by established berth electrical demand in kW and total non-compliant berth hours rounded upward to a whole hour. No consecutive-year escalation multiplier applies.
IMO Circular MSC.1/Circ.1675 (issued 27 June 2023) provides non-mandatory operational advice. It covers compatibility checks, 12-month repeated-call checks, a 30-month idle test gate, 5-step LOTO and STCW PIC guidance.
IACS Recommendation No. 182 (December 2024) sets non-mandatory shipside design advice, mainly for HVSC (over 1,000 V to 15 kV AC), with its general provisions also applying to LVSC (up to 1,000 V AC). Key items include hardwired safety loops, 30-minute reserve batteries and earth-power-pilot pins.
Mandatory IACS UR E11 (Rev.4, contracts on or after 1 Jul 2022), UR E5 (Rev.2, contracts on or after 1 Jan 2028) and UR E24 (Rev.1) set the Class baseline: UR E11 for HV networks, UR E5 and UR E24 for all shipboard electrical systems. They establish air clearances, AC/DC tolerances and an 8% THD limit where main-busbar harmonic filters are fitted.
IMO Resolution MEPC.385(81) amended MARPOL Annex VI (Appendix IX) from 1 August 2025 for ships rated at 5,000 GT or more. Vessels report delivered shore electricity in kWh, with MEPC.395(82) paragraph 7.10 (renumbered 7.11 by MEPC.401(83)) advising stored supplier bills.
Authority separation across EU legislation, IMO conventions, mandatory IACS URs and non-mandatory OPS guidelines
Instrument
Legal Status & Scope
Key Dates & Thresholds
Core Shipboard Engineering & Verification Duties
FuelEU Maritime (EU 2023/1805)
Binding EU law for commercial vessels strictly exceeding 5,000 GT at EU ports. FuelEU's entry into the EEA Agreement is delayed to no earlier than 1 January 2028; until then Norwegian and Icelandic ports count as third-country ports.
Monitoring plan 31 Aug 2024. General rules 1 Jan 2025. OPS Art. 6: 1 Jan 2030 (AFIR ports) and 1 Jan 2035 (other OPS quays). Quayside stays of 2 hours or more.
Containerships and passenger ships connect to OPS unless Art. 6(5)(a)-(h) applies. Penalty under Art. 23(5): EUR 1.5 x berth kW x total non-compliant hours rounded up. FuelEU DoC aboard by 30 June (EU PSC Dir. 2009/16/EC Annex IV item 51).
AFIR (EU 2023/1804, Art. 9 & Annex II)
Binding EU port infrastructure law for TEN-T core and comprehensive maritime ports.
Applied from 13 Apr 2024. Port OPS target by 31 Dec 2029. 3-year averages exceeding 100 container, 40 ro-ro pax/HSC or 25 other pax calls above 5,000 GT.
Covered ports must serve at least 90% of annual quayside calls per category. Seagoing HVSC shore links follow IEC/IEEE 80005-1 (2019 with 2022 AMD1) and IEC 62613-1:2019 (Annex II points 5.1-5.2).
IMO MSC.1/Circ.1675 (June 2023)
Non-mandatory IMO operational advice for international voyages. Dry-dock repair is excluded, and tankers receive special consideration.
Approved MSC 107 (Jun 2023). Unmodified repeat calls up to 12 months: 5 checks. Gaps over 12 months: 12 checks. Idle beyond 30 months (ship or shore): dielectric, IR and earthing tests.
Compatibility study, pre-connection checklist, ITU VHF/UHF voice link, PA alert, pilot-loop trip test, 5-step LOTO and earthing, 9 SMS-aligned docs and PIC holding STCW III/6 or III/2-III/3 CoC.
IACS Rec. 182 (Dec 2024)
Non-mandatory IACS Recommendation for shipside HVSC (over 1,000 V to 15 kV AC) and LVSC (up to 1,000 V AC). Onshore plant is excluded.
GPG approved 19 Dec 2024 with no mandatory date. 30 min reserve battery. Cable sheath rated at least 90 °C. 12-month unmodified repeat check and 30-month shipside idle gate.
Mandatory IACS Unified Requirements forming the binding Class rule baseline across Member Societies.
UR E11 (Rev.4, Feb 2021): over 1 kV to 15 kV, HV systems in ships contracted on or after 1 Jul 2022 (Rev.3 from 1 Jul 2016 for earlier contracts). UR E5 Rev.2: contracts on or after 1 Jan 2028. UR E24 Rev.1: contracts or filter-retrofit survey applications on or after 1 Jan 2020.
UR E11 clearances (55/90/120/160 mm), IP32/IP4X switchgear, IAC Type A/B, HV tray segregation and cable withstand tests. UR E5 tolerances. UR E24 8% main-busbar filter THD cap.
MARPOL Annex VI (MEPC.385(81) & MEPC.395(82))
Binding IMO convention (Reg. 27 DCS for ships at 5,000 GT or more) plus non-mandatory 2024 SEEMP guidelines.
MEPC.385(81) adopted 22 Mar 2024, EIF 1 Aug 2025 (early App. IX use invited from 1 Jan 2025). MEPC.395(82) adopted 4 Oct 2024. Submit by 31 Mar. SoC by 31 May.
Appendix IX mandates annual reporting of delivered shore electricity in kWh and fuel split by machinery group. MEPC.395(82) para. 7.10, now 7.11 as amended by MEPC.401(83) (carrying forward MEPC.388(81)), advises storing supplier bills.
1. Statutory Scope vs Guidelines: Separating EU Law, IMO Rules and Class Criteria
Onshore power supply (OPS), also called cold ironing or shore-side electricity, feeds a berthed vessel from the port electrical grid so auxiliary diesel generators can stop. Engineers must separate four distinct legal layers.
At regional level, EU FuelEU Maritime Regulation 2023/1805 creates binding rules for commercial cargo and passenger vessels strictly exceeding 5,000 gross tonnage at European Union ports, regardless of flag. Port infrastructure obligations sit separately in AFIR (EU 2023/1804).
At global IMO level, MARPOL Annex VI as revised by IMO Resolution MEPC.385(81) requires vessels rated at 5,000 GT or more to report annual shore-power supply in kWh. Operational safety advice in IMO MSC.1/Circ.1675 remains strictly non-mandatory.
At Classification level, IACS Recommendation No. 182 (December 2024) defines non-mandatory shipside OPS constructional and operational advice. Its Technical Background explains that IACS issued a Recommendation because industry asked for guidance urgently, intending to update it into a Unified Requirement once industry feedback, FuelEU and the IMO guidelines are reflected.
During conversion from a draft UR to a Recommendation, IACS deleted surveyor-witness wording from Sections 5.1.1 and 5.4.2. Section 1.1.2 already excludes onshore equipment, so no extra shore-side statement was added. Mandatory Class rules instead sit in IACS UR E11 (HV systems), UR E5 (voltage and frequency variations) and UR E24 (harmonic distortion).
Individual Class societies also publish optional shore-connection notations. Indian Register of Shipping (IRClass) Guidelines IRS-G-DES-03 (Rev. 01, effective 1 July 2025) assign voluntary HVSCS and LVSCS notations aligned with IEC/IEEE 80005-1 and Rec. 182. Those numbers belong strictly to IRClass, not IACS URs or SOLAS.
Separate binding EU FuelEU and AFIR articles from non-mandatory IMO MSC.1/Circ.1675 guidance and IACS Rec. 182 advice in fleet SMS manuals.
Verify whether the ship holds an optional Class shore-connection notation (such as IRClass HVSCS or LVSCS) alongside mandatory IACS UR E11, UR E5 and UR E24 rules.
Track Norwegian and Icelandic port calls separately. On 11 August 2026, the Norwegian Maritime Authority reported the Norwegian Government's announcement that FuelEU cannot enter into force under the EEA Agreement before 1 January 2028; until then Norwegian and Icelandic ports stay third-country ports.
EU FuelEU Maritime Regulation 2023/1805 entered force on 12 October 2023, required ship monitoring plans by 31 August 2024 (Article 8(1)) and took general effect on 1 January 2025 (Article 32). Article 2(1) covers commercial ships strictly exceeding 5,000 GT, capturing 100% of port-stay and intra-EU energy plus 50% of voyages between EU and third-country or outermost-region ports.
Article 6 applies mandatory at-berth OPS strictly to containerships (purpose-built exclusively to carry containers below and above deck, Article 3(31)) and passenger ships exceeding 5,000 GT. Starting 1 January 2030, covered ships moored at AFIR Article 9 quays must plug in for all electrical berth loads (Article 6(1)).
From 1 January 2035, Article 6(2) extends that rule to every other Member State berth fitted with working shore-power points. Between 1 January 2030 and 31 December 2034, Member States may opt non-AFIR ports in early with one year's Commission notice (Article 6(3)).
Vessels at anchorage (moored away from the quayside under Article 3(16)) sit outside the default duty unless a Member State opts anchorage in under Article 6(11) with one year's notice. Quayside stays under two hours are exempt under Article 6(5)(a), so stays of exactly two hours or longer are in scope.
Article 6(5) grants eight strict exemptions. Clauses (a) to (d) cover quayside stays under two hours, zero-emission technologies, unscheduled safety calls and unavailable OPS points. The technology exemption needs an Annex III type (such as fuel cells, onboard batteries or wind/solar power, with zero Article 3(7) GHG and air-pollutant emissions, including PM) covering all electrical demand at berth.
Clauses (e) to (h) cover exceptional grid stability risks and incompatible shore installations where the ship's shore-connection installation is certified to AFIR Annex II. They also cover emergencies and force majeure, plus onboard generation for maintenance or functional tests requested by an authority officer or RO surveyor, only for as long as strictly necessary.
Compatibility under Article 6(5)(f) links directly to AFIR (EU 2023/1804) Annex II, point 5 for seagoing HVSC installations. Shore-side systems must meet IEC/IEEE 80005-1 (2019 edition with 2022 Amendment 1, point 5.1) and IEC 62613-1:2019 couplers (point 5.2). Neither enacted EU Regulation references IEC/IEEE 80005-3.
Starting 1 January 2035, Article 6(10) caps exemptions (d), (e) and (f) in AFIR Article 9 ports at the lower of 10% of annual port calls (rounded up) or 10 calls per year. Advance Article 6(8) notices showing the company could not foresee connection failure exclude a call from that cap.
On the port side, AFIR Article 9(1) requires covered TEN-T core and comprehensive maritime ports to deploy OPS by 31 December 2029. Ports must supply at least 90% of annual quayside calls where 3-year averages exceed 100 containership, 40 ro-ro passenger/HSC or 25 other passenger ship calls above 5,000 GT. Island, outermost-region, Ceuta and Melilla ports not connected to the mainland grid hold an exemption until such a connection or sufficient non-fossil local power capacity exists (Article 9(3)).
FuelEU measures GHG intensity against a 91.16 gCO2eq/MJ baseline, tightening by 2% (2025), 6% (2030), 14.5% (2035), 31% (2040), 62% (2045) and 80% (2050) under Article 4(2). Annex I sets the OPS numerator emissions to zero while keeping delivered OPS energy (MJ) in the denominator. Shore power thus scores 0 gCO2eq/MJ, though Article 5(10) excludes OPS from the RFNBO subtarget.
Under Article 23(5), non-compliant berth stays trigger a penalty payable no later than 30 June in the following verification year. The formula multiplies EUR 1.5 by established berth power demand in kW (Article 3(26)) and the total non-compliant berth hours rounded upward to a whole hour. Unlike Article 23(2) GHG/RFNBO deficits, Article 23(5) has no consecutive-year 10% multiplier and permits no banking, borrowing or pooling.
Established berth demand comes from the flag- or RO-approved electrical load balance demonstrating SOLAS II-1/40 and II-1/41 compliance (Article 8(3)(e)). If that approved study is absent, the statutory fallback equals 25% of combined main-engine MCR shown on MARPOL EIAPP certificates or engine nameplates.
Confirm the approved SOLAS II-1/40-41 electrical load balance enters exact berth demand (kW) in the FuelEU Monitoring Plan (Art. 8(3)(e)) to avoid the 25% MCR fallback.
Transmit advance OPS power-demand notices before EU arrival and archive port availability confirmations (Art. 6(8)) to preserve Art. 6(10) good-faith exclusions from 2035.
Collect complete Electricity Delivery Notes (Annex I: supplier, ship ID, port/LOCODE/berth, point, timestamps, kWh and metering) and store monitoring records for at least 5 years (Art. 7(4), Art. 15).
Follow the FuelEU annual calendar: submit the FuelEU Report by 31 January (Art. 15(3)) and obtain verifier notifications by 31 March (Art. 16(4)-(5)). Confirm the verifier records non-compliant hours before 1 May (Art. 23(4)), pay penalties (Art. 23(2)/(5)) and hold the FuelEU DoC by 30 June (Art. 22, Art. 24).
IACS Recommendation No. 182 (December 2024) defines high-voltage shore power as nominal AC voltage over 1,000 V up to 15 kV (Section 1.2.5) and low-voltage OPS as up to 1,000 V AC (Section 1.2.6). Its non-mandatory design advice specifies hardwired, fail-safe safety circuits (Section 2.1.2), and an HVSC supply should not reduce the availability of the ship's main, auxiliary or emergency machinery or its own power sources (Section 2.1.3).
Mandatory shipboard HV design baselines sit in IACS UR E11 (Rev.4, February 2021, applied to HV systems in new ships contracted for construction on or after 1 July 2022; Rev.3, implemented from 1 July 2016, covers earlier contracts) for three-phase AC networks rated over 1 kV and up to 15 kV. Without impulse-voltage type testing, phase-to-phase and live-to-earth air clearances must measure at least 55 mm at 3/3.3 kV, 90 mm at 6/6.6 kV, 120 mm at 10/11 kV and 160 mm at 15 kV (Table 2.3.1).
Under UR E11, metal-enclosed HV switchgear and static converters need at least IP32 enclosures (IP4X where unqualified crew have access, Section 2.2.4), while transformers need IP23 (or IP4X in spaces accessible to unqualified personnel, Section 2.2.3). Switchgear must hold Internal Arc Classification (IAC Type A for authorised staff or Type B for general access, Section 6.2.5) plus shutters shielding live contacts during breaker withdrawal (Section 6.2.3).
UR E11 Section 7.1 interlocks unenclosed HV room doors so they stay locked until power is isolated and earthed. Separately, Rec. 182 Sections 4.3.4-4.3.5 (and IRClass Part 1 Section 3.6.3) advise interlocking IEC 62613-1:2019 HV sockets with earthing switches so plugs cannot engage or withdraw unless the earthing switch is closed.
Rec. 182 Section 4.3.8 advises a strict contact sequence. On plug-in, earth makes first, then power, then pilot contacts. On removal, pilot opens first, then power, then earth. Earth pins should carry at least the rated current of power pins (Section 4.3.13), and pilot pins should break before plug withdrawal compromises enclosure IP protection (Section 4.3.11).
Hull-to-shore equipotential bonding (Rec. 182 Sections 2.2.1-2.2.3) equalises vessel and pier potentials and should stay continuously monitored in the safety loop. Loss of bonding continuity should shut down the HVSC (an emergency shutdown trigger under Section 2.6.4), and the ship system should then perform a standard restart after blackout. Section 2.2.3 Note flags electrochemical corrosion-current checks (especially on aluminium hulls), while Section 2.2.4 allows a documented case-by-case periodic bonding test alternative.
Eight interlocks should block shore-connection breaker closure under Rec. 182 Section 3.7.1: closed ship or shore earthing switch, open safety loop, active ESD, self-test fault, lost data link, absent HV feed, broken bonding or an active ship earth fault. Protection circuits should include an auto-changeover reserve battery rated for at least 30 minutes with charger-fail and backup-active alarms (Section 3.2.1).
Rec. 182 Section 3.3.1 advises galvanic separation between shore and ship systems where applicable, typically by an isolation transformer, supported by in-rush limitation or large-motor start inhibition where needed (Section 3.3.2). Where HV transformers feed shipboard LV networks, UR E11 Section 2.4.6 mandates LV overvoltage protection via direct LV earthing, neutral voltage limiters or an earthed inter-winding screen. Oil-immersed units require five liquid-level, temperature and gas-pressure alarms and trips or load reduction (UR E11 Section 4.1).
Shipboard HV OPS cables must never share trays with cables rated at 1 kV or below (UR E11 Section 7.2.2) and need earthed metallic sheaths or armour, or full-length earthed metallic casings (Section 7.2.3). Dynamic flexible OPS cables under Rec. 182 Sections 4.4.1-4.4.2 should pass IEC 60332-1-2:2004 flame tests, resist oil, seawater and UV, and carry a temperature rating of at least 90 °C. Onboard cable management systems (CMS) should provide independent two-stage tension and length protection: Stage 1 alarm, Stage 2 automatic ESD (Sections 4.2.1-4.2.3).
Prove all eight Rec. 182 Section 3.7.1 CB close-blocking interlocks and hardwired earthing-switch release logic (Section 4.3.12) before initial terminal connection or after repairs.
Test the shore-connection switchboard reserve battery charger and 30-minute backup alarm (Rec. 182 Section 3.2.1) plus UR E11 Section 6.3.1 stored breaker energy (at least two operations).
Verify HV shore cables stay segregated from 1 kV and lower trays (UR E11 Section 7.2.2), relieve plug weight off terminations (Rec. 182 Section 4.3.10) and preserve minimum bend radius during deployment, operation and stowage (Section 4.2.1.6) across all draughts and tidal ranges (Section 4.2.1.7).
Confirm optional Class notation ratings where fitted. For instance, IRClass Rev. 01 (July 2025, Part 1 Section 5) sets 6.6 kV / up to 7.5 MVA with onboard CMS for container ships and 6.6 kV / 16 kA with shore CMS and ESD-1/ESD-2 for LNG carriers. Cruise ships should use 11 kV or 6.6 kV at 16 MVA minimum and 25 kA SC.
4. Voltage, Frequency, Harmonics & Safe Load Transfer (UR E5, UR E24 & MSC.1/Circ.1675)
Linking a ship busbar to a shore substation exposes onboard switchgear, transformers and controllers to grid voltage swings, frequency-converter harmonics and prospective fault currents. Rec. 182 Appendix Section 1.8.1 advises nine compatibility checks before first connection, covering short-circuit levels, steady and transient voltage dips, load-step response, impulse withstand, neutral earthing and shore total harmonic distortion (THD).
Mandatory IACS UR E5 (Rev.2, September 2026) applies to vessels with building contracts signed on or after 1 Jan 2028, while earlier contracts stay under the previous revision (Rev.1). Under Section 2 and Table 1, shipboard AC appliances should operate across permanent frequency shifts of ±5% and transient shifts of ±10% (5 s), plus permanent voltage shifts of +6% and -10% and transient swings of ±20% (1.5 s).
Under UR E5 Table 2, DC systems supplied by generators or fixed rectifiers hold ±10% continuous tolerance, 5% cyclic variation and 10% ripple. Battery-connected equipment should tolerate +30% to -25% on charge and +20% to -25% when not connected during charging (Table 3). Sensitive OPS PLCs, relays and ship-shore gateways needing tighter limits should not be fed directly from the system but by other means, such as a stabilised supply (Section 3).
Neutral earthing coordination follows UR E11 Sections 2.1.2 and 2.4.2. Earth faults require visual and audible alarms, while earthed-neutral fault current must stay within the largest generator full-load rating and reach at least 3x relay pickup. Across the full earthing-factor scale (1/√3 to 1), high-impedance systems exceeding 0.8 require phase-to-phase-voltage insulation if feeders do not trip automatically.
Engineers must separate two distinct harmonic distortion benchmarks. Mandatory IACS UR E24 (Rev.1, effective for building contracts or filter-retrofit survey applications on or after 1 Jan 2020) caps total harmonic distortion at 8% on ships with harmonic filters on the main busbars (filters serving only single-application drives excepted). A higher limit is allowed only where all installed equipment is designed for it, documented in a harmonic distortion calculation report kept on board for the surveyor (Section 2). Such ships need continuous monitoring and alarms (Section 3.1), while ships contracted before 1 July 2017 may instead measure THD annually under seagoing conditions and after any change to the electrical system (Section 3.2).
By contrast, IRClass Guidelines IRS-G-DES-03 (Part 1 and Part 2, Section 2.2.13.1) specify tighter output limits strictly for shore-connection frequency or voltage converters under IRClass notation: 5% THD across all loads and 3% for any single harmonic. Never confuse that single-society converter limit with the mandatory 8% UR E24 main-busbar cap.
Short-circuit studies under Rec. 182 Section 2.5.1 should sum every simultaneous fault contributor: maximum permitted ship generators, running motors and shore feed. Short-term synchronised transfer may be excluded from peak combined fault ratings where suitable interlocks prevent permanent paralleling and/or restrict generators or load (Sections 2.5.2-2.5.3, 3.10.6).
Load transfer operates in two mutually exclusive modes under IMO MSC.1/Circ.1675 (Sections 3.2.2 and 3.3.3) and IACS Rec. 182 (Sections 3.5, 3.9 and 3.10). Blackout (dead-bus) transfer uses fault-tolerant interlocks so the shore breaker closes only onto a dead busbar and blocks simultaneous ship and shore feeds (Section 3.9). Reverse-power relays and synchrocheck are not required in blackout mode (Section 3.6.2 Note).
Temporary parallel (seamless) transfer automatically synchronises ship generators to the shore grid and transfers load smoothly within an adjustable transfer time limit (TTL). If the TTL expires, automatic tripping clears prolonged grid paralleling (Rec. 182 Sections 3.10.1-3.10.4). Parallel receiving panels carry dual voltmeters, dual frequency meters, phase-sequence monitors and synchroscopes (Section 3.5.1), whereas blackout panels carry single shore meters and phase-sequence indication (Section 3.5.2).
Complete all nine compatibility items in IACS Rec. 182 Appendix Section 1.8.1 (ratings, fault level, voltage dips, load steps, impulse withstand, neutral earthing, cable reach, THD and hazardous zones) before initial connection.
Confirm whether the plant runs blackout or TTL-limited parallel transfer and verify receiving-panel metering and relays match Rec. 182 Sections 3.5 and 3.6.
Test all six onboard ESD triggers (Rec. 182 Section 2.6.4: bonding loss, cable over-tension, safety-loop break, E-stop press, HV cable fault or live plug withdrawal) for instant CB trip and blackout recovery.
Review internal generator synchronising, ANSI 32 reverse power and earth-fault tracing in Marvel's dedicated AVR/protection relay and switchboard earth-fault guides rather than blending shore logic into plant tuning.
Safe shore-power turnarounds depend on disciplined joint execution between the ship Person in Charge (PIC) and shore PIC under non-mandatory IMO MSC.1/Circ.1675 (issued 27 June 2023). Before arrival, both sides should complete the pre-connection checklist covering berth, supply point, voice link, operating limits, PIC contacts, estimated load and agreed switching steps (Sections 1.3.6 and 5.2.9).
Prior to hookup or disconnection, the PIC should confirm no safety-critical operations are under way (Sections 1.3.7, 3.2.1.3 and 3.2.3.1.2), and the ship should make a public address (PA) announcement (Section 1.3.8.5). Ship-shore communications should use the terminal's and ship's common working language, or English, with VHF/UHF sets operating on ITU Maritime Mobile Services frequencies (Sections 1.3.8.3-1.3.8.4).
During HV hookup (MSC.1/Circ.1675 Section 3.2.1), both teams define restricted-access areas and verify fire-fighting, first-aid and PPE readiness. Next, they verify breakers are open, isolated and earthed, pay out de-energised cables via the CMS, enable tension/length limits and simulate the pilot safety loop to prove breaker trip before lifting earths and energising.
Testing frequency turns on two calendar gates across MSC.1/Circ.1675 and IACS Rec. 182. On an initial connection at a given terminal shore substation, both sides should run a 12-item integration suite (MSC.1/Circ.1675 Section 2.1.2, Rec. 182 Section 5.5.1). That suite spans visual checks, switchgear and cable withstand tests, insulation and earthing resistance, protection, interlocks, controls, bonding monitor, phase sequence, CMS, integration and E-stops.
However, the three heavy electrical tests (power-frequency/cable voltage withstand, insulation resistance and earthing resistance) depend on a 30-month idle gate. MSC.1/Circ.1675 Section 2.1.3 advises running them whenever either shipboard or shoreside gear sits idle beyond 30 months, while Rec. 182 Section 5.5.2 specifies that 30-month gate for shipside gear.
On repeated calls within 12 months at the same shore point with neither shore nor shipside gear modified, MSC.1/Circ.1675 Section 2.2.2 and Rec. 182 Section 5.6.1 trim testing to five checks. Those cover visual inspection, zero earth fault, voltage/frequency statement, authorised switching steps and E-stop test. Gaps over 12 months restore the 12-item suite, applying the 30-month idle gate under Section 2.2.4.
For newly installed shipside HV cables or additions entering service, mandatory IACS UR E11 Section 7.2.6 prescribes a four-stage dielectric sequence. After an initial insulation-resistance check, cables rated at 1.8/3 kV or less take 4 U0 DC for 15 minutes. Above 1.8/3 kV (Um = 3.6 kV), on cable-maker advice, engineers may apply AC withstand (5 minutes phase-to-phase between conductor and metallic screen/sheath, or 24 hours at operating voltage) or 4 U0 DC for 15 minutes. Finally, conductors are earthed to discharge trapped charge before repeating insulation resistance.
Before any OPS maintenance, MSC.1/Circ.1675 Section 4 (and Rec. 182 Appendix Section 1.2.1) advises five steps: open breakers, lock against reclosure (LOTO), prove lines dead, earth and short-circuit all phases, and partition nearby live parts. Joint ship-shore LOTO stays under dual PIC control (Section 2.1.4).
Under MSC.1/Circ.1675 Section 6.1, the Company (as defined in SOLAS IX/1.2) should ensure OPS familiarisation in line with STCW I/14 paragraph 1.5. Only familiarised crew authorised by the PIC should perform connection, transfer or disconnection (Section 6.2). The onboard PIC for HV or LV OPS should hold an STCW III/6 ETO certificate or an STCW III/2 or III/3 Chief/Second Engineer CoC (Section 6.3), with a PIC or PIC-designated personnel on duty throughout supply (Section 6.4). MSC.1/Circ.1675 relies on existing STCW certificates and familiarisation and sets no new certificate.
Include OPS operating procedures in the SMS (Section 5.1) and keep all nine MSC.1/Circ.1675 Section 5.2 documents on board: diagrams/set points, compatibility and port switching records, connect/disconnect steps, large-load inhibition, TTL settings, ESD/blackout recovery, stowage, maintenance plan and pre-connection checklist.
Log every terminal connection date and any shore or shipside modifications so Chief Engineers and ETOs immediately identify whether the 12-month 5-check scope or full 12-item suite applies.
Verify E-stop push buttons and manual reset work at every Rec. 182 Sections 2.6.5-2.6.6 station (manned control room, onboard CMS positions and shipside breaker locations).
Record STCW I/14.1.5 OPS familiarisation for all participating crew and designate an STCW III/6 ETO or STCW III/2-III/3 senior engineer as onboard PIC.
Accurate shore-power metering now serves both EU FuelEU reporting and global MARPOL Annex VI verification. IMO Resolution MEPC.385(81) was adopted on 22 March 2024 and entered into force on 1 August 2025, with early use invited from 1 January 2025. It replaced Appendix IX of MARPOL Annex VI for Chapter 4 vessels rated at 5,000 GT or more, subject to Regulation 19.2 exclusions.
Revised Appendix IX mandates annual reporting of delivered shore electricity in kWh plus fuel burned by machinery group (main engines, auxiliary engines/generators, oil-fired boilers and others) and fuel burned while the vessel is not under way. Laden distance remains voluntary, while total transport work is mandatory strictly for Regulation 28 (CII) ships. IMO Resolution MEPC.407(84) (adopted 1 May 2026, entering into force 1 September 2027) makes further Appendix IX changes: separate reporting-period start and end dates for Regulation 27 and Regulation 28, and "Oil-fired Boiler(s)" becomes "Fired Boiler(s)". The shore-power kWh entry is unchanged.
For SEEMP Part II, IMO Resolution MEPC.395(82) (adopted 4 October 2024) revoked MEPC.346(78) and carried forward MEPC.388(81) paragraph 7.10. MEPC.401(83) (adopted 11 April 2025) renumbered it as paragraph 7.11, and MEPC.413(84) (adopted 1 May 2026) amended only the distance-travelled entries, so the shore-power text is unchanged. That non-mandatory guidance advises summing shore-power kWh from stored supplier documents, which could be included in the electronic record. Under MEPC.348(78) (amended by MEPC.389(81)), paragraph 6.3 advises withholding the Statement of Compliance for unresolved discrepancies exceeding ±5%.
Statutory annual DCS milestones under MARPOL Annex VI Regulations 6, 9 and 27 remain unchanged (MEPC.328(76)). Ships report aggregated annual data by 31 March (Regulation 27.3) and receive the Statement of Compliance by 31 May (Regulation 6.6.4). Underlying data stays accessible for 12 months (Regulation 27.8), SoCs are retained aboard the vessel for 5 years minimum (Regulation 9.12), and Flag transfers data to IMO within one month of SoC issue (Regulation 27.9).
For statutory surveys, IMO Resolution A.1207(34) (HSSC 2025, adopted 3 December 2025) includes zero dedicated OPS switchboard items. Its 'shore connection' wording strictly means the SOLAS II-2/10.2 firefighting international shore connection. Surveyors check SOLAS II-1/40-45 electrical plant via Cargo Ship items (CI) 2.1.1.8, (CI) 2.1.4.53-2.1.4.56, (CA) 2.2.2.23-2.2.2.25, (CIn) 2.3.2.1, (CIn) 2.3.3.3 (oil tankers, dangerous-zone IR) and (CR) 2.4.2.1, plus Passenger items (PI) 5.1.1.9, (PI) 5.1.3.64-5.1.3.67.1, 5.1.3.68 and (PR) 5.2.2.60-5.2.2.65.
A.1207(34) Appendix 1 reflects MARPOL amendments up to and including MEPC.385(81). Surveyors verify the IEE Certificate, SEEMP Confirmation of Compliance and DCS/CII Statements of Compliance under Annex 3 items (AA) 4.2.1.3 to 4.2.1.5, plus (AIn) 4.3.1.1 and (AR) 4.4.1.1. For ships built on or after 1 Jul 1998 (MSC.57(67)), SOLAS II-1/41.5 and II-1/42.3.4 / II-1/43.3.4 anchor switchboard resilience. On ships whose propulsion depends on electrical power, they cover main busbar subdivision (41.5.1.3) and restoring propulsion within 30 minutes of a blackout.
Port State Control inspection duties also split cleanly by jurisdiction. Under IMO Resolution A.1206(34) (adopted 3 December 2025), officers progress from initial inspection to a more detailed inspection on clear grounds (Sections 1.7.2, 1.7.6, 2.4-2.5), checking electrical plant under Appendix 6 Sections 3.1, 3.4 and 3.5. Examples of SOLAS II-1 detainable deficiencies that may warrant detention sit in Appendix 2 SOLAS items 1 and 3. Missing MARPOL VI certificates, SEEMP and DCS/CII SoCs sit in Appendix 2 MARPOL VI items 1 to 3 (certificate lists in Appendix 12, inspection guidelines in Appendix 18).
Checking the FuelEU Maritime Document of Compliance sits strictly under European Union regional PSC law (Directive 2009/16/EC, Annex IV, item 51, inserted by EU 2023/1805 Article 31), never A.1206(34). A ship may lack a valid FuelEU DoC (Article 24) for two or more consecutive reporting periods. If other enforcement measures have failed, a port Member State may then issue an expulsion order, after which other Member States refuse entry until the company complies. If the ship flies a Member State's flag and enters one of its ports, that flag State must order a flag detention (Article 25(3)).
Need independent engineering support on HVSC compatibility studies, FuelEU Article 8(3)(e) load balances or UR E11 switchgear audits? Marvel Solutionz provides $350 USD for a 1-hour consultancy (+ 5% sales tax). Engineers can also enrol in the LNG, Dual-Fuel & Spark-Gas Academy at $395 USD self-paced (+ 5% sales tax) or $3,500 USD (+ 5% sales tax) for Corporate Team Training up to 10 engineers.
Reconcile every port Electricity Delivery Note (kWh) across both the EU FuelEU 5-year archive and MARPOL Annex VI Appendix IX annual DCS reporting (MEPC.395(82) para. 7.11, as amended by MEPC.401(83)).
Hold valid IEE, SEEMP Confirmation and 5 years of DCS/CII Statements of Compliance for IMO PSC (A.1206(34) Appendices 12 and 18) alongside the separate EU FuelEU DoC due by 30 June (Dir. 2009/16/EC Annex IV item 51).
Keep SOLAS II-1/40-45 electrical drawings, insulation logs and dead-ship recovery proofs ready for HSSC (CA) 2.2.2.23-2.2.2.25 and (PR) 5.2.2.60-5.2.2.65 surveys.
Book $350 USD for a 1-hour consultancy (+ 5% sales tax) with Marvel Solutionz before HVSC retrofit tenders or initial terminal compatibility reviews.
Frequently Asked Questions
Which ships must connect to Onshore Power Supply (OPS) under FuelEU Maritime and when?
Under FuelEU Maritime (EU 2023/1805, Articles 2(1) and 6), commercial containerships and passenger ships strictly exceeding 5,000 GT moored at EU quays for 2 hours or more must plug in. The duty begins 1 January 2030 in AFIR Article 9 ports and 1 January 2035 in other OPS-equipped ports, while stays under 2 hours are exempt (Article 6(5)(a)).
How is the FuelEU Maritime OPS non-compliance penalty calculated?
Article 23(5) multiplies EUR 1.5 by established berth power demand in kW and the total non-compliant berth hours rounded upward to a whole hour. Berth kW comes from the approved SOLAS II-1/40-41 load balance or a 25% main-engine MCR fallback (Article 8(3)(e)), with no consecutive-year 10% multiplier.
Who can act as the onboard Person in Charge (PIC) for OPS under IMO MSC.1/Circ.1675?
Under non-mandatory IMO MSC.1/Circ.1675 Section 6.3, the onboard PIC for HV or LV shore power should hold an STCW III/6 ETO certificate or an STCW III/2 or III/3 Chief/Second Engineer CoC. Participating crew should complete STCW I/14 paragraph 1.5 familiarisation and hold PIC authorisation.
When are the 12-month and 30-month OPS electrical test gates triggered?
Under non-mandatory MSC.1/Circ.1675 Section 2.2 and IACS Rec. 182 Section 5.6, repeat calls within 12 months where neither shore nor shipside equipment was modified need five checks, whereas intervals over 12 months restore the 12-item integration suite. Dielectric, insulation-resistance and earthing-resistance tests apply if gear sits idle beyond 30 months (ship or shore per MSC.1/Circ.1675 Section 2.1.3, shipside per Rec. 182 Section 5.5.2).
What is the difference between IACS UR E24 harmonic limits and shore-converter harmonic caps?
Mandatory IACS UR E24 (Rev.1) caps THD at 8% on ships with main-busbar harmonic filters, unless all installed equipment is designed for a higher limit documented in an on-board calculation report. It also requires continuous monitoring and alarms, or annual checks for ships contracted before 1 July 2017. Tighter 5% THD and 3% single-harmonic figures for shore converters belong to individual Class rules such as IRClass IRS-G-DES-03 (Rev. 01, July 2025), not UR E24.
Do ships now have to report shore power kWh under IMO DCS?
Yes. IMO Resolution MEPC.385(81) (in force 1 August 2025, early use invited from 1 January 2025) amended MARPOL Annex VI (Appendix IX) for Chapter 4 vessels rated at 5,000 GT or more. Ships report annual delivered shore electricity in kWh by 31 March, with MEPC.395(82) paragraph 7.11 (as amended by MEPC.401(83)) advising stored supplier bills.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/onshore-power-supply-ops-cold-ironing-and-hvsc-safety-guide/