IACS UR E26 (Rev.1, Nov 2023) and UR E27 (Rev.1, Sep 2023) apply to covered ships contracted on or after 1 Jul 2024 (non-mandatory guidance for other ships). UR E26 sets five functional elements, while UR E27 sets 30 baseline plus 11 untrusted-network capabilities based on IEC 62443-3-3.
IACS UR E22 (Rev.3 Corr.1, Sep 2025) governs classification-required CBSs on new ships contracted on or after 1 Jul 2024, graded by Table 3 into Categories I to III. UR E10 (Rev.10, Aug 2024) applies to type-approval applications dated on or after 1 Jan 2026.
UMS relies on separate alarms (UR M29), independent manual-reset shutdowns (UR M30) and, where one generator normally supplies the load, standby power preferably within 30 s and no more than 45 s (longer only where Class accepts it for slow-starting prime movers) (SOLAS II-1/41.5.1.1, UI SC 157 Rev.1; UR M31 deleted Jan 2023). Engines and bridge control follow UR M35 (Rev.8, Corr.1 Jul 2025), M36 (Rev.6) and M43 (Rev.1, ships contracted from 1 Jan 2025).
IMO Res. MSC.428(98) (16 Jun 2017) affirms an approved SMS should take cyber risk into account and encourages Administrations to ensure this is done no later than the first annual DOC verification after 1 Jan 2021. MSC-FAL.1/Circ.3/Rev.4 (28 May 2026) sets six non-mandatory elements: Govern, Identify, Protect, Detect, Respond and Recover.
HSSC A.1207(34) and PSC A.1206(34) contain no direct cyber clauses. HSSC checks UMS via (CI) 2.1.4.57 (.1 to .7) and annual random tests ((CA) 2.2.2.26). PSC looks at faulty alarms (App. 6 3.3) and UMS evidence (App. 12 Part A Item 50), and raises ISM-related deficiencies under App. 8.
IACS UR E26 (Rev.1) 1.3.1 to 1.3.2, 4.2.1.3, 4.2.5
Contracted on or after 1 Jul 2024. Safety zones and untrusted networks need physical segmentation, and in-scope wireless gear cannot be dual-homed.
Keep zone diagrams current, keep nav/comms out of machinery/cargo zones and check firewalls at commissioning and Special Survey.
Vendor PLC/IAS security and updates
IACS UR E27 (Rev.1) 4.1 to 4.2, 5.1 to 5.7, 6.1 to 6.3
30 baseline (Table 1) plus 11 untrusted-network items (Table 2, Item 31 MFA) based on IEC 62443-3-3, and 7 SDLC practices from IEC 62443-4-1.
Hold ship-specific System Certificates (Type Approval may waive survey/FAT and trim submittals), change defaults and keep the maker's update notices (5.2 to 5.3).
Unlogged engine or IAS software edits
IACS UR E22 (Rev.3 Corr.1 Sep 2025) Table 3, 6.8 to 6.12
Impact analysis (6.8) decides testing, notice and approval. Change records (6.11) are always required, and new software versions must be able to roll back to the previous version (6.9).
Control master/backup handling (6.6 to 6.7), log edits in PMS or a registry, run regression checks and show logs at annual survey.
Panel trips from EMI, heat or power loss
IACS UR E10 (Rev.10 Aug 2024) Items 3 to 6, 13 to 20
Type-approval applications dated on or after 1 Jan 2026: 3x30 s power interruptions, 55 °C / 70 °C dry heat, 10 V/m RF and Criterion A vs B.
Check UR E10 hardware evidence for Cat. II/III gear, confirm each unit's type-test grade (55 °C, or 70 °C for hot consoles) suits where it is fitted and screen emissions (Items 19 to 20).
Independent manual-reset shutdowns (M30.2.3, .2.8). Any fitted overrides block accidental use and alarm (M35 35.4.2 to .3). Single-generator standby power: 30 s preferred, 45 s max unless Class accepts longer (UI SC 157 2.2; UR M31 deleted Jan 2023).
Prove bridge/cabin mute leaves engine-room horn active (M29.2.9), test standby backup (no-break where needed, M29.2.8) and verify UMS tests ((CA) 2.2.2.26).
Six recommendatory elements (Govern to Recover, 3.5). PSCOs do not audit ISM (App. 8 1.3), applying 7.1.2.2 (3 months) or 7.1.2.3/.4/7.1.3.
Keep a hard-copy IRP onboard and a hard-copy Recovery Plan onboard and ashore (E26 4.4.1, 4.5.1), run annual and OT-specific training and close alarm defects fast.
1. IACS UR E26 (Rev.1) Ship Cyber Resilience: Scope, Five Elements & Segmentation
IACS UR E26 (Rev.1, Nov 2023, a complete revision replacing the Apr 2022 version, which was withdrawn before it came into force) applies to the ship as a whole. IACS Societies apply Rev.1 to covered ships contracted on or after 1 Jul 2024 (contract date as defined in IACS PR No. 29), and other ships may use it as non-mandatory guidance.
Under 1.3.1, mandatory scope covers five groups: international passenger ships including passenger HSC (any GT), international cargo vessels and HSC at 500 GT+, MODUs at 500 GT+ and self-propelled offshore construction units. Guidance covers warships/troopships, sub-500 GT cargo ships, non-mechanically propelled or primitive wooden craft, passenger yachts carrying no more than 12 passengers, pleasure yachts not in trade, fishing vessels and site-specific FPSOs/FSUs.
Scope (1.3.2) covers OT Computer-Based Systems (CBSs) and names nine ship functions in particular: propulsion, electrical power, steering, fire detection/extinguishing, anchoring/mooring, bilge/ballast and loading computers, watertight integrity/flooding detection, lighting and required safety systems (such as ESD and gas detection). Statutory nav gear, class/statutory comms and IP links to other networks (crew, passenger, admin or maintenance) also sit in scope. Plain system failures are not cyber incidents (§2). Class may accept IEC 61162-460 or equivalent for nav/radio gear instead of UR E27 §4 if UR E26 stays met.
UR E26 sets five concurrent functional elements (§3.2): Identify, Protect, Detect, Respond and Recover. Under Identify (4.1.1), the Systems Integrator (the Shipyard until delivery unless another firm is contracted) builds a lifetime inventory of hardware, software, firmware and connecting networks, and the Shipowner keeps it updated in service. Under Protect (4.2.1.3), general security zones require logical or physical segmentation, keeping navigation and communication gear out of machinery or cargo zones. Required safety-function zones and untrusted networks need physical segmentation, though out-of-scope OT gear may share a zone if it meets that zone's full requirements. In-scope wireless devices sit in dedicated zones and cannot be dual-homed (4.2.1.3, 4.2.5.3). Where antimalware software cannot be installed or would impair required service (such as real-time Cat. II/III tasks), operational procedures, physical safeguards or maker recommendations substitute (4.2.3.3).
Cat. II and III CBSs generally sit in lockable rooms, controlled spaces or lockable cabinets/consoles (4.2.4.3.1). Immediate-access operator HMIs inside physically access-controlled areas need not enforce login if specified in design docs (4.2.4.4.1), and unique logins for every human user are not universally required (4.2.4.3.5 Note). No in-scope CBS IP address may face untrusted networks (4.2.6.3). Remote maintenance adds seven controls (4.2.6.3.2): shore-link documents, pre-tested patches with a supplier confirmation report before remote updating, supplier update plans, interrupt/abort with roll-back, MFA, a temporary block after repeated failed logins and auto-logout if the link drops. These sit on top of 4.2.6.3.1: onboard acceptance and cut-off, safe handling of interruptions and logging of remote sessions. Portable-media ports follow E27 Item 10 and are physically blocked on any CBS that cannot fully meet it (4.2.7.1), networks require fault and abnormal-bandwidth alarms (4.3.1), and an optional IDS must be supplier-qualified and passive (4.3.1.3).
Local backup CBSs under SOLAS II-1/31 must run independently and, if networked, sit inside a separate security zone unless Class accepts an alternative concept (4.4.2). Zones need clearly marked isolation means (4.4.3), and impaired CBSs must drop to a minimal risk state (4.4.4). In good time before the first annual survey, the Owner submits the 12-area Ship Cyber Security and Resilience Programme (5.3.1, App. I); by that survey a hard-copy IRP (4.4.1) and a Recovery Plan in hard copy onboard and ashore with RTO/RPO targets (4.5.1) must be on board. Offline backups must be considered (4.5.2.3.2), CBSs need controlled shutdown, reset, roll-back and restart from a read-only image (4.5.3), and each Special Survey (class renewal) repeats witnessed tests, some only where CBSs have changed (5.3.3). Excluding an in-scope CBS needs a Class-accepted Risk Assessment meeting four §6.4 rules: zero IP links, no accessible ports (unused logically disabled), controlled access and no multi-function integrated scope (plus three advisory criteria: avoid Cat. III functions, cover known vulnerabilities in the assessment and minimise the attack surface). See our Marine IT, OT Network Segmentation & PMS Integration Guide for VSAT/LEO connectivity.
Verify 1 Jul 2024+ contract date, 4.1.1 inventory, safety/untrusted physical segmentation (4.2.1.3) and non-dual-homed wireless zones (4.2.5.3).
Verify remote maintenance MFA, onboard approval, cut-off, abort/rollback and supplier confirmation reports (4.2.6.3.1 to .2).
Keep hard-copy IRP onboard (4.4.1), Recovery Plan onboard/ashore (4.5.1) and tested backups with RTO/RPO targets.
IACS UR E27 (Rev.1, Sep 2023) sets minimum equipment security rules for non-excluded CBSs, including PLCs, servers, workstations, firewalls, switches and cloud VMs (2.1.2). It shares the 1 Jul 2024 contract trigger (non-mandatory guidance for other ships). Essential-system controls must never impair availability or safety (2.3). Compensating countermeasures may replace or add to built-in capabilities if they cover the same threats with equal protection, are not a control already required elsewhere in E27 and add no higher security risk (2.4, 3.1.3).
Section 4 is based on selected requirements of IEC 62443-3-3 (2013). Table 1 (4.1) mandates exactly 30 baseline security capabilities (Items 1 to 30) for all in-scope CBSs. Access covers user auth, accounts and roles (Items 1 to 3), changing defaults (Item 4), password strength and masked entry (6 to 7), least privilege (8) and session lock (12). Safeguards cover portable-media controls (Item 10, where port blockers or silicone may be accepted for a specific system), read-only overflow-resilient timestamped logs (13 to 16, 23) and wireless encryption (17, 21) and approved cryptography wherever used (22). They add deterministic predetermined output (20), DoS resilience (24), backup/recovery (26 to 27), backup-power transfer (28) and least functionality (30).
Table 2 (4.2) adds 11 security capabilities (Items 31 to 41) required only for CBSs with network links to untrusted networks. Access adds Item 31 (MFA), process/device auth (32), login throttling (33), banners (34), monitored access (35) and onboard approval (36). Session controls add inactivity or user-initiated remote termination (37), transit crypto integrity (38), syntax, length and content input validation (39) and session-ID protection plus logout invalidation (40 to 41).
Section 5 adapts seven controlled practices from IEC 62443-4-1 (2018) across a seven-phase Secure Development Lifecycle spanning requirements through end of life. Suppliers guard code-signing keys if used (5.1 SM-8), publish update/non-patching notices (5.2 SUM-2) and document dependent-component/OS compatibility (5.3 SUM-3). They deliver verifiable QA-tested updates (5.4 SUM-4) plus defence-in-depth and hardening guides (5.5 to 5.7 SG-1 to SG-3).
For every CBS where UR E27 is mandatory and not excluded under UR E26 §6, certification (§6) leads to a ship-specific System Certificate (UR E22 §2). Without Type Approval, suppliers submit nine documents (3.1.1 to 3.1.9, four upon request) and complete Class-witnessed survey and FAT (6.2 to 6.3). Subject to Class approval, voluntary Type Approval covering UR E27 may waive survey/FAT and trim submittals to inventory (3.1.1), topology (3.1.2) and supplier-signed test/hardening reports (3.1.10, App. II).
Hold ship-specific UR E27 System Certificates (or, for nav/radio equipment only, a Class-accepted IEC 61162-460 route), changed defaults (Item 4) and unneeded ports and services limited (Item 30).
Keep the maker's hardening guides (5.7), update notices (5.2 to 5.3) and IRP/recovery information (3.1.8) onboard.
3. IACS UR E22 (Rev.3 Corr.1 Sep 2025) CBS Lifecycle, Change Control & UR E10 (Rev.10)
IACS UR E22 (Rev.3 Jun 2023, Corr.1 Sep 2025) governs design, construction, commissioning and upkeep of software-dependent CBSs delivering classification-required control, monitoring, alarm, safety or internal comms functions (1.1). Rev.3 applies to ships contracted on or after 1 Jul 2024 and serves as non-mandatory guidance for other ships (Note 4). Statutory SOLAS Chapter IV radio, Chapter V navigation and loading or stability computers sit outside UR E22 scope (1.2 Guidance, while IACS Rec. 48 may assist loading computers).
UR E22 Table 3 (3.1) grades systems by failure consequence. Cat. I failures cannot cause hazards (3.3 examples: fuel monitoring, diagnostics, CCTV) and normally skip Class review unless category or non-interference verification is requested (3.2). Cat. II failures could eventually create hazards (fuel treatment, inert gas, machinery alarm/safety). Cat. III failures could immediately trigger dangerous events (propulsion, steering, power management, DP Class 2/3). Every CBS needs vessel-specific categorisation (3.3, 4.3.3), and Cat. II/III need a vessel-specific Society Certificate (2.1) not normally waived by Type Approval (2.2).
During Cat. II/III development, Suppliers and Integrators (default: Shipyard, 4.3.1) run a recognised QMS (ISO 9001/90003 principles) across applicable Table 4 topics (15 total, 4.1.2). In service, the Owner becomes default Integrator for change management unless another party is appointed (5.1.1, 5.2.1). Cat. II/III systems include a failure mode description in the system description (4.2.3), pre-FAT fault simulation (4.2.6), witnessed FAT on actual hardware as a rule with network resilience checks (4.2.7), onboard SAT (4.3.6) and integrated SOST trials (4.3.7). Single data-link loss must never disable Cat. III functions (fail-to-safe), remote-control loss on Cat. II/III needs local/manual fallback, and link faults must alarm (7.2.1). Cat. III wireless links are barred unless Class accepts a standard-based engineering analysis (7.2.2).
Undocumented software changes leave nothing to show the surveyor. Under UR E22 Section 6, every post-FAT hardware, logic, software or parameter edit needs a pre-change impact analysis (6.8) setting criticality, verification scope and whether prior Class or Owner approval is required. Modifications require off-ship verification where practical and post-install functional plus regression checks (6.10), while new software versions must be able to roll back to the previously installed version, and any rollback is recorded and its root cause analysed (6.9). Mandatory 6.11 change records capture purpose, scope, 6.8 conclusions, new version IDs and test summaries in the PMS, a software registry or equivalent for annual survey review (6.12.1). Automatic logging to an ISO 24060 Ship Software Logging System (SSLS) is recommended rather than mandatory (7.1.1).
IACS UR E10 (Rev.10, Aug 2024) sets environmental and EMC type-approval tests for shipboard control, monitoring, alarm and protection gear. It applies to type-approval applications dated on or after 1 Jan 2026 for new, substantially modified or renewed types (Page 1 Notes 6 and 9), not to ship contract dates. Power tests run three 30 s interruptions in 5 min plus a mid-boot interruption for booting gear (Item 3) and supply swings (Item 4). Climate covers 16 h dry heat at 55 °C or 70 °C in hot consoles (Item 5, Note 1) and damp heat at 55 °C/95% RH (Item 6). Mechanical and cold tests cover vibration at ±0.7 g, or ±4.0 g at severe-vibration locations such as diesel engines and air compressors (Item 7), and cold at +5 °C, or -25 °C for non-weather-protected or cold locations (Item 11, Note 2). EMC adds 6/8 kV ESD (13), 10 V/m RF at 80 MHz to 6 GHz (14), 3 V rms / 10 V rms bridge-deck spot-frequency conducted RF (16, Table Note 6), 2/1 kV burst (17) and 1/0.5 kV surge (18). Continuous tests require Criterion A (zero degradation), while transient tests allow self-recoverable Criterion B with no operating-state change or stored-data loss (Notes 4 and 5). Gear outside class and convention rules liable to cause interference must still meet Emission Items 19 and 20 (Note a).
Maintain ship-specific Society Certificates (UR E22 2.1) and Class-submitted UR E10 hardware evidence (4.2.4) for Cat. II/III CBSs.
Run 6.8 impact analysis before edits, verify rollback capability for new versions (6.9) and log edits under 6.11 for annual survey (6.12.1).
Verify single data-link failure alarms and local/manual fallback for Cat. II/III remote-control loss (UR E22 7.2.1).
4. UMS Alarms, Safety Shutdowns, Standby Power & Bridge Control (IACS UR M29, M30, M35, M36, M43 & UI SC 157)
UMS automation links CBS integrity directly to propulsion safety. IACS UR M29 (Rev.3, 1997, requiring UR E10 compliance under M29.1) keeps alarm loops separate from control and safety loops, sharing Gr 1 sensors only per UR M35 (M29.2.1). Faults display at control stations (M29.2.2), alert duty engineers (M29.2.3) and update a sole bridge watchkeeper when faults start, are attended and clear (M29.2.4), separating slowdown/shutdown bridge group alarms (M29.2.5). Independent standby power (no-break where needed) feeds alarms with separate power-loss alerts (M29.2.8). Silencing audible alarms never clears visuals, and muting at the bridge or accommodation must not silence machinery-space alarms (M29.2.9). A second fault while a first stays unrectified re-triggers alarms, and fleeting faults latch until acknowledged (M29.2.10).
IACS UR M30 (Rev.1, 1997) governs UMS safety systems executing standby start, output reduction or critical shutdown (M30.1). Every safety action shall raise an alarm (M30.2.2) and intervene sequentially from least drastic to shutdown (M30.2.4). Shutdown systems must stay independent of all control and alarm systems (M30.2.3) and independent across separate plant units (M30.2.6), with cause traceability (M30.2.7). After a safety trip stops machinery, automatic restart is prohibited until manual reset (M30.2.8). IACS deleted UR M31 (1978) in Jan 2023; main electrical continuity is covered by SOLAS II-1/41.5.1.1 as interpreted by IACS UI SC 157 (Rev.1, Feb 2005, applied from 1 Jan 2006). Where one generator normally supplies load, standby start and connection should preferably take no more than 30 seconds and must not exceed 45 seconds (unless Class approves slower prime movers), with sequential essential-auxiliary restarts (SC 157 2.2). Parallel plants should provide automatic load shedding to protect remaining generators from overload (2.1, 2.3.1). See our Emergency Diesel Generator (EDG) & SOLAS Testing Guide and Marine Switchboard Earth Fault & Preferential Trip Guide for electrical handover checks.
Main reciprocating internal combustion engines in UMS follow IACS UR M35 (Rev.8 Jan 2019, applied to certification requests or ships contracted on or after 1 Jan 2020, with Corr.1 Jul 2025). Where fitted, slowdown or shutdown overrides must block accidental use and alarm when active (35.4.2 to .3). After an automatic stop, restart stays barred until manual reset (M30.2.8). Table 1 (cross-head) and Table 2 (trunk-piston) separate sensors into Gr 1 (indication/alarm/slowdown), Gr 2 (standby pump) and Gr 3 (shutdown). Low main/thrust bearing lube pressure and overspeed trigger Gr 3 shutdown on both designs, and a power-supply failure of the control, safety and alarm system raises an alarm (Table 1 item 13.0, Table 2 item 11.0). Crankcase oil-mist or bearing monitoring (where UR M10.8 or SOLAS II-1/47.2 requires it) triggers slowdown on cross-head engines (Table 1) versus shutdown on trunk-piston engines (Table 2, allowing one detector with two independent outputs). Trunk-piston cylinder cooling outlet temperature also requires two separate sensors for alarm and slowdown (Table 2 fn 5), and on trunk-piston engines per-cylinder exhaust temperature monitoring applies above 500 kW/cyl (Table 2 fn 6). See our Crankcase Oil Mist Detector Alarm & Bearing Scuffing Guide for sensor checks.
Auxiliary trunk-piston fuel-oil generator engines in UMS follow IACS UR M36 (Rev.6 Dec 2018, applied to engine certification applications or ships contracted on or after 1 Jan 2020). Table 1 lists 15 monitored parameters, specifying individual control-station alarms (or a local panel plus common control-station alarm, M36.2) across 14 entries plus overspeed shutdown (which alarms via M30.2.2). Conditional alarms include per-cylinder exhaust temp above 500 kW/cyl (Note 2) and Category B/C turbocharger speed (Note 4). Automatic shutdown applies to only three parameters: low lube-oil pressure, overspeed, and oil-mist or bearing monitoring where UR M10.8 or SOLAS II-1/47.2 requires it. High cooling water or air temperature is alarm only in UR M36 Table 1.
Bridge propulsion control follows IACS UR M43 (Rev.1 Feb 2024, applied to ships contracted on or after 1 Jan 2025). Remote control must prevent overload and prolonged critical-speed running (M43.1) and stay independent of the other transmission system (M43.2, where one lever may be accepted). It must also sequence emergency reversing safely (M43.3) and inhibit remote starts under hazards like engaged turning gear or low lube pressure (M43.4). On bridge-control failure, SOLAS vessels follow SOLAS II-1/49.5, while non-SOLAS vessels raise an alarm and hold propeller speed and thrust direction until local takeover unless impracticable (M43.6). See our CPP, Stern Tube Seal & ShaPoLi Guide for pitch failure modes.
Test the alarm system's standby supply and the separate alarm for failure of either supply (M29.2.8), and prove bridge/cabin mute leaves engine-room horns active (M29.2.9).
Verify fitted overrides block accidental use and alarm (M35 35.4.2 to .3), and automatic shutdowns require manual reset (M30.2.8).
Verify UR M43.4 remote-start inhibits (turning gear, low lube pressure) and UI SC 157 2.2 standby continuity on single-generator ships (30 s preferred, 45 s max unless Class accepts longer).
IMO's cyber framework spans the SOLAS Chapter IX fleet via the SMS. IMO Res. MSC.428(98) (16 Jun 2017) uses no 'shall' verbs. Paragraph 1 affirms an approved SMS should take cyber risk management into account under the ISM Code's objectives, while para 2 encourages Administrations to ensure this is done no later than the first annual DOC verification after 1 Jan 2021. Legal enforcement runs through the mandatory ISM Code (A.741(18) as amended, including MSC.353(92)) and Flag/RO audits.
IMO issued MSC-FAL.1/Circ.3/Rev.4 on 28 May 2026 after approval by FAL 50 (Mar 2026) and MSC 111 (May 2026). It uses no 'shall' or 'must' wording: it gives high-level recommendations and minimum controls that should be implemented (1.1, 3.5). Section 2 defines CBS, IT and OT (2.1) and flags nine vulnerable system groups (2.2.1.1 to .9, from bridge, cargo/ballast/bunkering and propulsion/machinery/power systems to security, passenger/crew, administrative and welfare systems, ship-port interfaces and ship-to-shore remote/MASS systems). It recommends segmenting OT from IT and Internet-facing systems (2.2.2) and highlights third-party vendor and maintenance-device supply-chain risks (2.2.6).
Paragraph 3.5 structures recommended minimum controls across six concurrent, continuous functional elements (with the NIST 2.0 Framework listed separately among discretionary references in 4.3.3). First, Govern (3.5.1) designates an accountable person or entity with authority, support and cyber expertise to steer policies and continuity plans. Second, Identify (3.5.2) builds a digital-system inventory and assesses risks to systems whose sudden failure creates hazards. Third, Protect (3.5.3.1 to .9) recommends unique accounts and timely removal, changing defaults and using MFA where appropriate, OT/IT segmentation, log storage, external-interface safeguards (such as firewalls or antivirus) and removable-media controls. Protect also recommends annual basic cyber training for all staff, OT-specific training for OT users, onboarding familiarisation and occasional drills testing cybersecurity knowledge (3.5.3.6), plus backups, IR plans, supply-chain policies and audits.
Fourth, Detect (3.5.4) covers threat tracking, active monitoring and incident-recognition training. Fifth, Respond (3.5.5) covers Administration-defined incident reporting, incident records and response training. Sixth, Recover (3.5.6) covers reinstatement strategies for critical assets, recovery training and root-cause reviews to prevent recurrence. Section 4 lists non-IMO reference standards for discretionary use: ISO/IEC 27001, IACS UR E26, IACS UR E27, industry onboard cyber guidelines, IACS Rec. 166, NIST 2.0 and IAPH port guidelines (4.2 to 4.3). Inside the mandatory ISM Code, cyber hygiene and OT reliability align with risk safeguards and taking recommended guidelines into account (1.2.2 to 1.2.3), manning (6.2, amended by MSC.353(92)), familiarisation and training (6.3 to 6.5) and operational plans (7). They also link to emergency preparedness and drills (8), critical-equipment standby tests inside routine maintenance (10.3 to 10.4) and periodic checks of delegated ISM tasks (12.2, inserted by MSC.353(92)).
Appoint an accountable cyber lead in the SMS (Circ.3/Rev.4 3.5.1) and map digital risks under ISM 1.2.2 and 10.3.
Log annual basic and OT-specific training, sign-on familiarisation and occasional cybersecurity drills (3.5.3.6).
Control visiting laptops/media (2.2.6, 3.5.3.5, 3.5.3.8), check delegated ISM tasks (ISM 12.2) and protect logs (3.5.3.3, 3.5.5.2, 3.6).
6. HSSC Surveys (A.1207(34)), PSC Inspections (A.1206(34)) & Technical Support
Under the recommendatory 2025 HSSC guidelines (IMO Res. A.1207(34), 3 Dec 2025), HSSC does not audit cyber risk or ISM DOC/SMC. Instead, Annex 1 section (C) 2 (SAFCON) reviews Initial UMS plans ((CI) 2.1.1.10, SOLAS II-1/46 to 53 and II-2/4.2.5). It verifies seven (CI) 2.1.4.57 items: fire precautions (.1), flooding (.2), bridge control (.3), vocal comms (.4), random alarms (.5), automatic shutdowns (.6) and special rules (.7). Annual (CA) 2.2.2.26 checks UMS random alarm, automatic and shutdown tests (cascading to (CIn) 2.3.2.1 and (CR) 2.4.2.1). Passenger UMS follows SOLAS II-1/54 ((PI) 5.1.3.69, (PR) 5.2.2.66), and IP Code ships carrying over 240 persons mirror passenger UMS ((TI) 4.1.1.10.2, (TA) 4.2.2.12). Gas carriers add IGC Ch. 13 checks ((GA) 2.2.2.35), and gas-fuelled ships under the IGF Code add Ch. 15 checks ((CA) 2.2.5.4, (CIn) 2.3.5.2).
IMO Res. A.1206(34) (3 Dec 2025) likewise omits direct cyber citations, targeting tangible UMS, alarm and SMS evidence. Appendix 12 Part A checks SAFCON (Item 4), DOC copy (Item 22), SMC (Item 23) and SOLAS II-1/46.3 UMS evidence (Item 50). Appendix 6 section 3.3 treats disconnected safety devices and faulty automatic alarms as grounds to inspect the engine-room log and the record of machinery failures and to ask for running tests. Appendix 7 Part 2 lets PSCOs check officers' familiarity with bridge controls, steering-mode changes and alarm procedures (1.1.1, 1.1.5), local control of bridge-controlled systems (1.3.5.2), emergency stops, fire detection/alarms and watertight/fire-door operation (1.3.5.5) and auto-to-manual cooling/lube changeover (1.3.5.6). Appendix 2 Section 5 (SOLAS) lists non-exhaustive detention examples covering propulsion, essential machinery and electrical installations (Item 1), emergency power (Item 3), fire detection and fire alarms (Item 6) and serious Appendix 7 operational deficiencies (Item 13).
When technical or alarm defects indicate weak SMS execution, Appendix 8 governs ISM escalation without PSCOs performing ISM audits (1.3). Technical or operational defects (detainable or not) showing no ISM implementation failure or ineffectiveness raise no ISM deficiency (7.1.2.1). Non-detainable defects indicating ineffective ISM implementation lead to one non-detainable ISM deficiency giving three months for corrective action (7.1.2.2). Where individually non-detainable defects collectively warrant detention and indicate serious ISM failure, an ISM deficiency is recorded requiring an Administration or RO safety management audit before release (7.1.2.3). Where at least one detainable defect indicates serious ISM failure, a detainable ISM deficiency is recorded requiring that flag or RO audit before release (7.1.2.4). If a later PSC check past three months (6.3.2) finds follow-up unsatisfactory, a new detainable ISM deficiency requiring a flag or RO audit follows (7.1.3). Set the intervals for cyber drills (ISM 8.2) and backup-restore tests (ISM 10.3) in your SMS and planned maintenance system, and record each one.
Marvel Solutionz helps Superintendents, DPAs, Chief Engineers and ETOs audit IACS UR E26/E27 compliance, UR E22 change control and UMS faults. Book $350 USD for a 1-hour consultancy (+ 5% sales tax). Join the LNG, Dual-Fuel & Spark-Gas Academy at $395 USD self-paced (+ 5% sales tax) with a 5-minute simulator trial. Corporate Team Training for up to 10 engineers is $3,500 USD (+ 5% sales tax).
For UMS ships, keep UMS evidence (SOLAS II-1/46.3, A.1206(34) App. 12 Part A Item 50), a copy of the DOC, a valid SMC and UR E22 6.11 change records ready.
Demonstrate random alarm, automatic and shutdown tests for HSSC annual survey ((CA) 2.2.2.26) with no alarms left bypassed.
Drill local manual takeover of bridge-controlled gear (App. 7 Part 2 1.3.5.2) and manual cooling/lube changeover (1.3.5.6).
Frequently Asked Questions
Which vessels must comply with IACS UR E26 (Rev.1) and UR E27 (Rev.1)?
IACS Societies apply both to covered ships contracted on or after 1 Jul 2024: international passenger ships including passenger HSC (any GT), international cargo vessels and HSC at 500 GT+, MODUs at 500 GT+ and self-propelled offshore construction units. Other ships may use them as non-mandatory guidance.
How many capabilities does IACS UR E27 (Rev.1) specify, and which IEC standards apply?
UR E27 (Rev.1, Sep 2023) sets 41 security capabilities based on IEC 62443-3-3 (2013): 30 baseline (Table 1, Items 1 to 30) plus 11 untrusted-network items (Table 2, Items 31 to 41, starting with MFA). Section 5 adapts seven SDLC practices from IEC 62443-4-1 (2018).
Does IACS UR E22 (Rev.3 Corr.1) cover ECDIS, GMDSS radio or loading computers?
No. UR E22 (Rev.3 Jun 2023, Corr.1 Sep 2025) covers classification-required software CBSs (control, monitoring, alarm, safety and internal comms). Statutory SOLAS Ch. IV radio, Ch. V navigation and loading/stability computers sit outside scope (IACS Rec. 48 may assist loading computers).
Does IACS UR E26 require antivirus and unique logins on every engine-room HMI?
No. Under 4.2.3.3, antimalware software may be left off where it cannot be installed or would impair required service (such as real-time Cat. II/III tasks), but malware protection is still required through operational procedures, physical safeguards or maker recommendations. Under 4.2.4.4.1, specified immediate-access HMIs in controlled spaces need not enforce login, and 4.2.4.3.5 notes unique per-person logins are not strictly mandatory.
What are the six elements in IMO MSC-FAL.1/Circ.3/Rev.4 (28 May 2026)?
Paragraph 3.5 sets six concurrent, non-mandatory elements: Govern (accountable person or entity), Identify (digital inventory and critical-asset risk review) and Protect (nine controls including OT/IT segmentation and annual plus OT training). It completes the cycle with Detect, Respond and Recover.
Can faulty UMS alarms or weak cyber hygiene warrant PSC detention under A.1206(34)?
Yes, indirectly through machinery and ISM findings. While A.1206(34) omits cyber rules, faulty automatic alarms prompt running tests (App. 6 3.3), and detention may be considered under App. 2 (3.4.3, SOLAS Item 1). Serious ISM failure behind defects warranting detention (App. 8 7.1.2.3, 7.1.2.4), or unsatisfactory corrective action found more than three months later (6.3.2, 7.1.3), leads to a flag or RO safety management audit before release.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.
/guides/shipboard-cyber-resilience-iacs-ur-e26-ur-e27-and-ums-automation-guide/