LNG Cargo Submerged Pumps, Cryogenic Cooldown & ESD Systems: IGC Code (MSC.370(93)), HSSC A.1207(34) & PSC Guide

IGC Code (MSC.370(93)) LNG submerged cargo pump & cooldown guide: 10.2.9 motor trips, 5.6.1 redundancy, 13.7 gradients, 18.10 30 s ESD, A.1207(34) and PSC.

← All technical guides · Category: LNG FGSS & GVU · Updated: · 15 min read

Key Takeaways (TL;DR)

  • IMO Resolution MSC.370(93) (adopted 22 May 2014, effective 1 January 2016) replaced the IGC Code for vessels constructed or converted on or after 1 July 2016 (1.1.2.1, 1.1.3), regardless of tonnage. Ships constructed on or after 1 July 1986 and before 1 July 2016 stay under the earlier edition named in 1.1.2.3 unless the Code expressly says otherwise (for example the stability instrument, 2.2.6.1).
  • Under IGC Code 10.2.9, submerged electric cargo pump motors require automatic low-liquid-level shutdown (which may sense low motor current, low liquid level, or low pump discharge pressure), a cargo control station alarm, and gas-freeing electrical isolation. Where pumps are inaccessible in service, 5.6.1 mandates at least two separate transfer means per tank.
  • Piping designed at -110 °C or lower requires a complete stress analysis (5.11.5), while cargo temperatures below -110 °C require a shore-manifold hull water curtain (5.7.3). Isolatable liquid piping needs thermal relief valves (5.5.6), and non-open-ended lines designed below -55 °C restrict flanges to welded-neck types (5.8.3.2.1, relaxations 5.8.1/5.8.5).
  • IGC 18.5 mandates closely following the approved Cargo Operations Manual (18.2) during cooldown (18.5.1) and respecting design gradients while loading (18.5.2), backed on secondary-barrier tanks below -55 °C by insulation or hull sensors and design-appropriate boundary sensors (13.7.2). Numeric cooldown rates (°C/h) and motor Megger limits (MΩ) come from maker and approved ship manuals.
  • Under 18.10 and Table 18.1, liquid-line ESD valves close fully and smoothly within 30 s (18.10.2.1.3), and an ESD stops main, booster, and spray/stripping pumps (spray/stripping pumps may be left out only while supplying a forcing vaporiser, Note 5), with no automatic restart after a blackout until safe conditions are confirmed (Note 7). HSSC A.1207(34) Annex 5 audits hazardous-area insulation records ((GIn) 2.3.2.3 / (GR) 2.4.2.1) and post-dry-dock topping-off ((GIn) 2.3.2.6 / (GR) 2.4.2.4).

IGC Code Statutory Mandates (MSC.370(93)) vs Ship-Specific Approved Manual & Maker Limits on LNG Carriers

Engineering AreaMandatory IGC Code Rule (MSC.370(93) & NV.004)Ship Manual / Maker / Class Domain (Not Set in IGC)HSSC A.1207(34) & PSC A.1206(34) Audit Hook
Submerged pump motor protectionPermitted in containment systems. Automatic low-liquid-level shutdown (may sense low motor current, low liquid level, or low discharge pressure), cargo control station alarm, and gas-freeing electrical isolation (10.2.9). Where inaccessible in service, at least 2 separate transfer means per tank (5.6.1).Minimum winding insulation resistance (MΩ), Megger test voltage, winding/bearing RTD trips, minimum submergence depth, and NPSH margin.HSSC (GA) 2.2.2.5 and 2.2.2.21, plus (GIn) 2.3.2.3 insulation testing/records. PSC App. 2 IGC Item 7.
Electrical bonding vs motor IRThermally isolated tanks, piping, hose connections, and gasketed pipe joints must be electrically bonded. Without straps, joint resistance must stay below 1 MΩ (5.7.4).Stator-to-earth winding insulation resistance baseline before energising submerged pump cables (maker and class rules).HSSC (GIn) 2.3.2.2 hull electrical bonding vs (GIn) 2.3.2.3 hazardous-area circuit insulation resistance.
Cryogenic piping & thermal reliefDesign pressure at least 1 MPa gauge (or 10x PRV set / 0.5 MPa gauge, whichever is less, on open-ended or PRV discharge lines, 5.4.1). Thermal relief on isolatable liquid lines (5.5.6) and fire PRV over 0.05 m³ trapped liquid (5.5.7). Welded-neck flanges below -55 °C design temp except open-ended lines (5.8.3.2.1, 5.8.1/5.8.5), stress analysis at -110 °C or lower (5.11.5).Exact pipe-rack sliding-shoe clearances, spring-hanger cold/hot load settings, and cryogenic flange bolt-torque sequences.HSSC initial 2.1.2.12.8 and 2.1.2.14, annual 2.2.2.13–2.2.2.14. PSC App. 2 IGC Items 5 and 6.
Tank cooldown & thermal gradientsFollow approved cooldown procedure closely (18.2.2.1, 18.5.1) and stay within design gradients during loading (18.5.2). At least 2 tank temp sensors (13.5.1), plus secondary-barrier insulation or hull sensors and design-appropriate boundary sensors below -55 °C (13.7.2.2–13.7.2.3).Numeric cooldown rate (°C/h), max top-to-bottom ΔT, target spray-cooldown finish temperature, and heel volume.HSSC (GI) 2.1.2.12 initial cooldown witnessing, (GA) 2.2.1.11 manuals, and 2.2.2.31 sensors. PSC App. 7 Part 2 1.2.6 and 1.2.8.
Tank & manifold ESD valvesFail-closed ESD valves (5.11.6.3 NV.004, 18.10.2.1.2). Manifold ESD mandatory (5.5.3.1, or excess flow up to 50 mm per 5.5.4), while tank ESD and extra manual manifold valves apply only when MARVS exceeds 0.07 MPa gauge (5.5.2.2, 5.5.3.2). Liquid lines close within 30 s (18.10.2.1.3).Hydraulic/pneumatic actuator stroke damping profiles, solenoid response tuning, and shore SSL connector hardware.HSSC (GI) 2.1.2.4 and (GA) 2.2.2.5. PSC App. 2 IGC Item 5 and Section 5 closing cargo-stop clause.
Overflow & vacuum interlocksIndependent high-level alarm (13.3.1) plus separate overflow shut-off sensor (13.3.2), closing within 3600 × U / LR s (18.10.2.1.4). Vacuum protection for tanks below 0.025 MPa external diff (8.3.1).Exact ship-specific high-level and high-high alarm % settings (no universal 95%/98% alarm rule in IGC 13.3).HSSC initial first-cargo (2.1.2.12.9), plus intermediate (2.3.2.6) and renewal (2.4.2.4) post-dry-dock topping-off test.
Piping & pump commissioning testsStrength test at least 1.5x design pressure for liquid or max working pressure for vapour (1.25x compressible, on-board welded joints at least 1.5x design pressure, 5.13.2.2). Leak test (5.13.2.3), operational test by first loading (5.13.2.5), valve type test below -55 °C (5.13.1.1).Factory cryogenic submerged-pump performance curve, cavitation/NPSH witness test, and vibration spectrum.HSSC initial 2.1.2.12.2, 2.1.2.14, and 2.1.2.15. CoF Appendix 2 materials, MARVS, and stress factors A/B.

1. Statutory Scope: IGC Code (MSC.370(93)), Corrigendum NV.004 & Pump Redundancy

Liquefied natural gas carriers follow the revised IGC Code adopted by IMO Resolution MSC.370(93) on 22 May 2014 (mandatory under SOLAS Chapter VII Part C). Although MSC.370(93) took effect on 1 January 2016, its construction applicability date sits at 1 July 2016 under 1.1.2.1 (and 1.1.3 for conversions). Coverage applies to ships of all sizes, even below 500 GT, carrying bulk liquefied gases with absolute vapour pressure above 0.28 MPa at 37.8 °C (1.1.1).

Engineers must check which IGC edition governs the ship's construction date (keel laid or similar construction stage under 1.1.2.1–1.1.2.2, or conversion start under 1.1.3). Under 1.1.2.3, gas carriers constructed on or after 1 July 1986 and before 1 July 2016 stay under the earlier IGC edition named there unless the Code expressly says otherwise. The stability instrument rule (2.2.6.1, with the waiver in 2.2.7) is the clear example of such express wording; Chapters 5, 10, 13 and 18 carry none, so an older ship is checked against the earlier edition for those items.

The later amendments checked for this guide left the submerged-pump, piping, instrumentation, and ESD chapters unchanged. MSC.411(97) (1 January 2020, 3.2.5 removing the A-0 wheelhouse-window rating), MSC.441(99) (1 January 2020, Appendix 2 Certificate of Fitness loading and stability entries), MSC.476(102) (1 January 2024, 6.5.3.5.1 weld tests), and MSC.492(104) (1 January 2024, 2.7.1.1 downflooding) left those chapters intact. Likewise, MSC.523(106) (1 January 2026, Table 6.3 high-Mn steel) and MSC.566(109) (1 July 2026, 16.9.2 toxic cargo fuel) did not alter Chapters 5, 7, 8, 10, 13, or 18 (check the IMO list for any amendment adopted after these). Within those chapters, the only corrections come from the 2017 Secretariat corrigendum (Note Verbale NV.004, Supplement QA104E) corrected 5.9.3.1 (butt-weld NDT), 5.11.6.3 (fail-closed ESD valves), and 13.6.4 (O2 monitoring), plus an Appendix 2 fix.

Under 1.2.11, cargo pumps include main pumps, booster pumps, and spray pumps transferring liquid cargo. Because submerged LNG pumps sit inside cold tanks and cannot be opened for repair in service, paragraph 5.6.1 mandates redundancy. Each cargo tank must have at least two separate cargo transfer means so one pump or transfer failure never blocks discharge by another arrangement.

Chapter 4 requires designers to include internal pump-tower, cargo-pump, stripping-pump, and spray-nozzle loads (4.9.1). For membrane tanks, 4.24.6.1 mandates fatigue analysis for internal structures such as pump towers, plus membrane and attachment parts where continuous monitoring cannot reliably detect developing failures. Under 1.4.2, cargo pumps and piping undergo Initial, Renewal, Intermediate, and Annual surveys (issued or endorsed in the vessel's International Certificate of Fitness under 1.4.4 and Appendix 2), plus Additional surveys after an investigation or important repairs or renewals (1.4.2.5).

2. Submerged Electric Pump Motors (IGC 10.2.9) & Electrical Bonding vs Insulation Resistance

Chapter 10 classifies hazardous areas as Zone 0, Zone 1, and Zone 2 (10.1.1) and requires electrical systems to meet recognised standards accepted by the flag Administration or maintained by the recognised organisation (10.2.2, 1.2.44). Electrical equipment may be installed in hazardous areas only where it is essential (10.2.3), and it must be evaluated and certified or listed by an accredited testing authority or notified body recognised by the Administration; automatic isolation of non-certified equipment on gas detection is not an accepted alternative (10.2.4). Under 10.2.6, generation, distribution and control systems must be designed so that a single fault does not lose the ability to keep tank pressure (7.8.1) and hull temperature (4.19.1.6) within normal limits, and the failure modes and effects must be analysed and documented.

The dedicated statutory rule for LNG submerged cargo pump motors sits in paragraph 10.2.9 (not 10.2.4 or 10.2.5). Submerged cargo pump motors and their supply cables may be fitted inside cargo containment systems (in practice the cargo cools the motor, and the tank holds no oxygen). Paragraph 10.2.9 requires arrangements that shut the motors down automatically on low liquid level, sensed by low pump discharge pressure, low motor current, or low liquid level.

Every low-liquid-level shutdown under 10.2.9 must trigger an alarm at the cargo control station. Equally critical for dry-dock prep, 10.2.9 requires submerged pump motors to be capable of electrical isolation whenever tanks are gas-freed. Note that 10.2.9 lists low-liquid-level shutdown only. Winding or bearing RTD trips are maker and class protections rather than 10.2.9 items, while 10.2.8 gastight enclosures apply to depth sounders, logs, and ICCP anodes rather than pump terminal boxes.

Engineers must never confuse two completely different electrical resistance checks on an LNG carrier. Under 5.7.4, thermally isolated tanks, piping, hose connections, and gasketed pipe joints must be electrically bonded against static discharge, with joint resistance proved strictly below 1 MΩ where bonding straps are absent. By contrast, IGC Chapter 10 prescribes no numeric minimum winding insulation resistance (MΩ) or Megger test voltage for submerged motors.

Before energising any main or spray pump after ballast cooldown or dry-docking, verify winding-to-earth insulation resistance and phase balance strictly against the pump maker's acceptance curve and class rules. Also avoid misapplying IGC 17.11.1 (vapour-space inerting for submerged electric pumps) to LNG. In Chapter 19, Methane (LNG) carries Ship Type 2G, flammable vapour detection (F), closed or indirect gauging (C), and a blank Column i, so 17.11.1 applies only to listed products like isoprene or pentane.

3. Cryogenic Piping, Thermal Contraction, Relief Valves & Testing (IGC Chapter 5)

Moving LNG near -162 °C from tank domes to manifolds subjects austenitic stainless steel piping (Chapter 6 Table 6.4, rated down to -165 °C) to thermal contraction and surge loads. Under 5.4.1, cargo and process piping design pressure must be at least 1 MPa gauge (or 10 times PRV set pressure or 0.5 MPa gauge, whichever is less, on open-ended or PRV discharge lines). Under 5.4.2, the design condition is the greatest of: the 45 °C vapour pressure for lines that can be isolated from their relief valves, the MARVS of the cargo tanks and process systems, the pump or compressor discharge relief valve setting, or the maximum discharge or loading head, while liquid piping must withstand surge pressures (5.4.3).

Thermal movement protection under 5.7.1 favours piping offsets, bends, or expansion loops outside cargo tanks, permitting multi-layer bellows only where bends, offsets, or loops are impracticable (slip joints are barred outside tanks under 5.8.4.2). Because LNG piping design temperature sits at -110 °C or lower, 5.11.5 mandates a complete piping stress analysis covering pipe weight, acceleration loads, internal pressure, thermal contraction, and hull hog-and-sag loads. Paragraph 5.7.3 also requires operating a low-pressure hull water curtain beneath shore connections during transfer whenever cargo temperature falls below -110 °C.

Cryogenic fabrication rules tighten sharply below -55 °C. Under 5.8.3.2.1, non-open-ended piping designed below -55 °C must use welded-neck flanges only (subject to 5.8.1 inside-tank relaxations and 5.8.5 Administration alternatives). External piping must use materials melting at 925 °C or above, except short tank-attached pipe lengths with fire-resisting insulation (5.12.2). Stress factors A (min 2.7) and B (min 1.8) appear on the CoF (5.11.3.1). Under 5.9.3.1 (corrected by NV.004), butt welds need 100% radiographic or ultrasonic testing below -10 °C design temperature where inside diameter exceeds 75 mm or wall thickness exceeds 10 mm. Where automatic welding is approved, the extent of testing may be reduced progressively, but never below 10% of each joint (5.9.3.2).

Valve isolation logic prevents two major LNG hazards: liquid lock and uncontrolled manifold releases. Under 5.5.6, every pipe run or component that can be isolated liquid-full must carry a thermal relief valve against warming and evaporation. They discharge into cargo tanks or a cargo vent mast equipped to detect and dispose of liquid cargo (5.2.2.4, where downstream-overpressure pump relief valves discharge to pump suction). Where automatic fire isolation can trap over 0.05 m³ of liquid, 5.5.7 mandates fire-sized pressure relief valves.

Check tank-type valve rules carefully during plan reviews. Under 5.5.3.1, active manifold transfer connections need remotely controlled fail-closed ESD valves (5.11.6.3 per NV.004, or excess flow valves up to 50 mm under 5.5.4). Tank-dome ESD valves (5.5.2.2) and extra manual manifold valves (5.5.3.2) are statutory mandates only where tank MARVS sits above 0.07 MPa gauge (such as Type C tanks). Membrane tanks, and Type A and prismatic Type B tanks built mainly of plane surfaces, have design vapour pressures below 0.07 MPa (4.21.1.1, 4.22.1.1, 4.24.1.4). Under 5.13, valves below -55 °C pass cryogenic type tests (5.13.1.1). Assembled lines pass strength tests at 1.5x design pressure for liquid or max working pressure for vapour (1.25x compressible, 5.13.2.2). On-board welded joints require at least 1.5x design pressure (5.13.2.2), followed by leak (5.13.2.3) and operational testing by first loading (5.13.2.5).

4. Tank Cooldown Discipline, Temperature Sensors (IGC 13.5, 13.7, 18.5) & Vacuum Protection (Ch. 7–8)

Cooldown after dry-docking or warm ballast voyages introduces transient thermal loads that Chapter 4 requires designers to consider for tanks carrying cargo colder than -55 °C (4.13.4.1). Operationally, 18.2.1 mandates Administration-approved Cargo Operations Manuals covering dry-dock-to-dry-dock stages: cooldown, warm-up, transfer, sampling, gas-freeing, and minimum cargo and inner-hull temperatures (18.2.2.1, 18.2.2.3). Paragraph 18.5 turns that manual into a binding duty: officers must follow cooldown steps closely (18.5.1) and respect design gradients while loading (18.5.2). Where fitted, crews must run hull heating systems so hull steel never drops below design temperature (18.5.3).

Chapter 13 defines the instrumentation needed to monitor cooldown safely. Each cargo tank requires at least two cargo temperature sensors (tank bottom and near top below max liquid level), with CoF lowest design temperature marked beside them (13.5.1). On secondary-barrier containment systems below -55 °C, sensors must monitor insulation or adjacent hull steel with low-temperature alarms where applicable (13.7.2.2). Where appropriate for the containment design, tank-boundary sensors also verify unsatisfactory thermal gradients do not develop (13.7.2.3). On a single ship, or first ship of a series, one tank carries extra temporary or permanent sensors to validate initial cooldown (13.7.2.4).

Every cargo-pump discharge line and liquid or vapour manifold needs at least one pressure gauge (13.4.4), backed by local manifold gauges between ship valves and shore hoses (13.4.5). Tank vapour spaces require direct gauges plus remote control-station readouts (13.4.1) and bridge plus control-station high-pressure alarms (and low-pressure alarms where vacuum protection applies, 13.4.2). Under 13.1.3, instruments undergo reliability checks and recalibration at maker intervals rather than a fixed IGC calendar.

Cooldown and high-rate discharge interact closely with Chapters 7 and 8. Chapter 7 disallows cargo venting to control tank pressure and temperature except in emergencies or where permitted for certain cargoes by the Administration at sea and port Administration in port (7.1.3). Instead, 7.1.1 relies on reliquefaction, LNG-only thermal oxidation such as GCUs keeping uptake exhaust below 535 °C with no visible flame (7.4.1, 7.4.1.1), pressure accumulation, or coil-type liquid cooling (7.6, which covers coils rather than spray nozzles). Chapter 8 requires at least two equal-sized tank PRVs (8.2.1) independent of Chapter 7 pressure control gear (8.1). Sequential lifting allows up to 50% of capacity to be set up to 5% above MARVS (8.2.3), while combined PRV sizing caps tank pressure rise at 20% above MARVS (8.4.1).

Vacuum collapse during rapid cooldown condensation or pumping without vapour return is guarded by 8.3.1. Tanks unable to resist a 0.025 MPa external differential, or the differential caused by max discharge with no vapour return, cargo refrigeration, or thermal oxidation, need vacuum protection. They must fit vacuum relief valves admitting inert gas, air, or cargo vapour from a non-vapour-line source, subject to Chapter 17 (8.3.2), or two independent pressure switches. Those switches sequentially alarm and stop all liquid or vapour suction plus any refrigeration unit (8.3.1.1), which 18.10.4.1 permits via an independent low-pressure trip triggering ESD or at least stopping cargo pumps or compressors.

5. Cargo ESD System, 30-Second Closure, Overflow Interlocks & Table 18.1 Pump Trips

Under IGC 18.10, the Cargo Emergency Shutdown (ESD) system halts internal and ship-shore cargo flow while preventing destructive pressure surges (18.10.1.1). The system must incorporate a ship-shore link to recognised standards (18.10.1.4) and display functional flow charts at the cargo control station plus the bridge (18.10.1.5). Manual single-action ESD controls must sit on the bridge, at the 13.1.2 control position or CCR (if installed), and in at least two cargo-area locations (18.10.3.1).

ESD valves must shut automatically if actuating power fails, offer local manual closure (or an adjacent series manual valve with trapped-liquid safeguards), and show positive actual position (18.10.2.1.2). For liquid piping systems, 18.10.2.1.3 mandates smooth full closure within 30 seconds of actuation, with closure-time information kept on board and a closing time that is verifiable and repeatable (5.13.3 requires the closing characteristics to be tested). Under 18.10.3.2, the ESD starts automatically on fire detection on the weather decks of the cargo area and/or in cargo machinery spaces; on deck, detection must at least cover the tank domes, manifolds, and areas where liquid piping is dismantled regularly, using fusible elements melting between 98 °C and 104 °C or area fire detection (the Table 18.1 footnote also allows electronic point temperature monitoring).

Overflow protection under 13.3 pairs an independent audible and visual high liquid level alarm (13.3.1) with a separate sensor that automatically closes a shut-off valve before the tank becomes liquid-full (13.3.2). Neither paragraph sets a fixed 95% or 98% alarm figure; the set points come from the ship's approved design, and the maximum loading limits for each tank and cargo are in the approved document required by 15.6.1. Reference-temperature filling limits default to 98% under 15.3 and never exceed 99.5% under 15.4.2. Under 18.10.2.1.4, overflow valve closing time from signal to closure cannot exceed 3600 × U / LR seconds, where U is ullage at operating signal level (m³) and LR is maximum agreed ship-shore loading rate (m³/h). Officers must trim loading rate where needed to control surge pressure.

Table 18.1 defines exact ESD pump trips. Emergency pushbuttons, deck or compressor-house fire detection, cargo-tank high level, signals from the ship-shore link, and loss of ESD valve motive power stop both main/booster cargo pumps and spray/stripping pumps. Three Table 18.1 notes set critical operating conditions on pump interlocks. Note 5 allows excluding spray/stripping pumps only while supplying a forcing vaporiser. The 13.3.7 level-alarm override may be used at sea to prevent false alarms, but under Note 4 cargo pump operation and manifold ESD valve opening are inhibited while it is active, except during 13.3.5 high-level tests (18.10.3.4). Whenever that override operates, 13.3.7 mandates continuous visual indication on the bridge and each applicable control station. Note 7 forbids automatic pump restart upon power recovery after blackout until safe conditions are confirmed.

Pre-transfer testing is mandatory before every cargo operation under 13.3.6, 18.6.2, and 18.10.5. Even more strictly, 13.3.5 requires verifying high-level alarms by physically raising tank cargo liquid to the alarm point at first full loading following delivery and again after every dry-docking. Automation systems must keep control, alarm/monitoring, and safety layers segregated so single failures stay contained (13.8.7). They must also protect software configuration against unauthorised change (13.8.8) and keep management-of-change approval records on board (13.8.9).

6. Practical Cargo Engineer Diagnostics: Megger Trends, Spray Cooldown & Cavitation Prevention

While the IGC Code defines mandatory safety architecture, day-to-day submerged-pump reliability depends on disciplined maker-manual engineering practices that officers must never confuse with statutory Code limits. Before starting any main or spray pump after a warm voyage or refit, trend stator insulation resistance and phase balance against the pump manufacturer's temperature-corrected baseline. Liquid LNG is a good insulator, whereas moisture from gas-freeing or a damaged cable penetration at the dome junction box typically shows up as falling insulation resistance.

During tank cooldown using spray pumps and spray headers, strictly follow the approved Cargo Operations Manual (18.2, 18.5.1) for target spray pressure, header pre-cooling, and allowable temperature-gradient limits across membrane corners or independent tank equators. Rushing cooldown creates excessive differential contraction across pump-tower sliding guides, spray lines, and insulation panels. Keep vaporised boil-off balanced cleanly via the vapour header, reliquefaction unit, or GCU (7.4) so tank pressure neither approaches MARVS nor falls toward the 8.3.1.1 / 18.10.4.1 low-pressure vacuum trip (or 8.3.1.2 vacuum relief setting).

Protect submerged pump thrust bearings and inducers against dry running and cavitation during start-up and heel stripping. Follow pump OEM procedures for discharge-valve crack-opening on start-up, minimum continuous flow through kickback or recirculation lines, and transition from main cargo pumps to smaller stripping/spray pumps as tank level drops. Verify that the fitted 10.2.9 low-liquid-level shutdown trips (low motor current, low tank level, or low discharge pressure) are healthy and never bypassed to chase extra heel.

Inspect piping mechanical details before every cold transfer. Confirm deck pipe-rack sliding shoes sit free of ice lock and check multi-layer expansion bellows for icing protection (5.8.4.1) and over-extension/compression restraint binding (5.11.6.4). Verify manifold drip-tray protection (5.7.2), the below -110 °C water curtain supply (5.7.3), and electrical bonding (straps or proved below 1 MΩ resistance) across reassembled ship hose connections and gasketed pipe joints (5.7.4). Verify pre-cargo ESD checks and repeatable 30 s valve closure (18.10.5, 18.10.2.1.3), high and overfill level-alarm tests (13.3.6, 18.6.2), and regular gas-detector testing and calibration with the on-board test equipment, used as the maker recommends (13.6.18) before opening manifold valves.

7. HSSC Survey Items (A.1207(34) Annex 5) & PSC Detention Exposure (A.1206(34))

Under the 2025 IMO HSSC survey guidelines, Resolution A.1207(34) (3 December 2025), gas-carrier Certificate of Fitness checks sit inside Annex 5, Section (G) 2 (not Annex 3, which covers MARPOL). Notably, A.1207(34) cites IGC Chapters at chapter level and never prints the word submerged. Instead, submerged cargo pump motors are surveyed under hazardous-area electrical items (Ch. 10) and ESD automatic pump-shutdown items (Chs. 5 and 18).

At Initial survey, surveyors examine plans under (GI) 2.1.1.6 (piping), 2.1.1.7 (pressure/temp control), 2.1.1.10 (electrical), and 2.1.1.13 (instrumentation). They verify ESD/pump auto-shutdown ((GI) 2.1.2.4), piping and valving ((GI) 2.1.2.14–2.1.2.15), certified hazardous-area gear ((GI) 2.1.2.20), level/overflow/pressure/temperature gear ((GI) 2.1.2.30), gas/O2 detection and automation ((GI) 2.1.2.31–2.1.2.34), and approved manuals ((GI) 2.1.3.8). During initial cooldown and first cargo ((GI) 2.1.2.12), surveyors witness gas detection (.1), gauges, temp sensors, and cargo pumps (.2), on-deck piping expansion (.8), and topping-off high-level alarms (.9).

Annual surveys verify approved manuals with ESD and PRV isolation procedures ((GA) 2.2.1.11), ESD and pump auto-shutdown ((GA) 2.2.2.5), and piping, PRVs, hoses, thermal control, and vent/vacuum gear ((GA) 2.2.2.13–2.2.2.17). They also verify hazardous-area electrical maintenance ((GA) 2.2.2.21) plus level, overflow, pressure, temperature, gas/O2 detection, and automation ((GA) 2.2.2.31–2.2.2.35). Intermediate surveys carry annual items forward ((GIn) 2.3.2.1), verify hull electrical bonding ((GIn) 2.3.2.2), inspect hazardous-area cables with insulation tests or maintained logs ((GIn) 2.3.2.3), and witness post-dry-dock topping-off ((GIn) 2.3.2.6). Renewal surveys carry Intermediate items forward ((GR) 2.4.2.1), examine containment insulation and selected tanks ((GR) 2.4.2.2–2.4.2.3), and repeat post-dry-dock topping-off ((GR) 2.4.2.4).

Under the 2025 IMO PSC procedures, Resolution A.1206(34) (3 December 2025), Appendix 12 Part A Item 24 checks the International Certificate of Fitness. Appendix 2 Section 5 (Areas under the IGC Code) lists 11 serious deficiencies that may warrant detention. Key examples include unlisted cargo or missing cargo info (Item 1), defective airlocks (Item 4), absent or faulty quick-closing valves (Item 5), and defective safety valves (Item 6). They also include electrical installations not intrinsically safe or not meeting the Code (Item 7), inoperable cargo ventilators (Item 8), inoperable tank pressure alarms (Item 9), and defective gas detection (Item 10).

Even where a defect may not warrant ship detention, a closing clause at the end of A.1206(34) Appendix 2 Section 5 states that improper operation or maintenance of cargo-handling gear or machinery gives PSCOs grounds to stop cargo operation. Under Appendix 7 Part 2, gas-carrier cargo officers and key crew should know IGC safety measures (1.2.6), and PSCOs may check that manuals hold safe port and transit loading/unloading guidance (1.2.8). During a more detailed inspection, when deck officers and crew fail to monitor loading and apply proper cargo precautions, detention may be considered (Part 1, 5.1.1).

Frequently Asked Questions

Does the IGC Code set a minimum Megger insulation resistance (MΩ) for LNG submerged cargo pump motors?

No. IGC Code paragraph 10.2.9 requires automatic low-liquid-level shutdown (which may sense low motor current, low liquid level, or low discharge pressure), a cargo control station alarm, and gas-freeing electrical isolation, without setting a motor insulation figure. The only 1 MΩ figure in the IGC Code sits in 5.7.4 as a strict below-1 MΩ electrical bonding limit across non-strapped hose connections and gasketed pipe joints. Motor Megger thresholds come from the pump maker and class rules; the survey item that covers insulation resistance of hazardous-area circuits is HSSC (GIn) 2.3.2.3.

What numeric cooldown rate (°C/h) does IGC Code Chapter 18 require for LNG cargo tanks?

The IGC Code specifies no universal numeric cooldown rate (°C/h) or allowable ΔT. Instead, paragraph 18.5 requires officers to follow the ship's Administration-approved Cargo Operations Manual (18.2.1 and 18.2.2.1) closely and stay within the containment system's design temperature gradients. For containment systems with a secondary barrier below -55 °C, paragraph 13.7.2.2 requires insulation or adjacent hull-steel temperature sensors (with low-temperature alarms where applicable), while 13.7.2.3 requires tank-boundary gradient sensors where appropriate for the design.

Do low-pressure membrane LNG cargo tanks require tank-dome ESD valves under IGC Code 5.5.2.2?

No. Under IGC Code 5.5.2.1, liquid and vapour tank connections (except PRVs and level gauges) require local manual shut-off valves (optionally remote). Remotely controlled tank-connection ESD valves (5.5.2.2) and extra manual manifold valves (5.5.3.2) are statutory mandates only where tank MARVS sits above 0.07 MPa gauge, such as pressurised Type C tanks. However, active manifold transfer connections require a remotely controlled fail-closed ESD valve under 5.5.3.1 and 5.11.6.3 (unless an excess flow valve replaces it on pipes up to 50 mm under 5.5.4), and any designated ESD valve must meet 18.10 (18.10.2.3).

How fast must LNG liquid-line ESD valves close, and what stops submerged cargo pumps on ESD?

Under IGC Code 18.10.2.1.3, liquid-line ESD valves must shut completely and smoothly within 30 seconds of actuation, while overflow shut-off valves must also close within 3600 × U / LR seconds (18.10.2.1.4). Under Table 18.1, emergency pushbuttons, fire detection, tank high level, ship-shore link signals, and loss of ESD motive power stop main/booster and spray/stripping pumps. Note 5 exempts spray/stripping pumps only while supplying a forcing vaporiser, and Note 7 bars blackout auto-restart until safe conditions are confirmed.

When must LNG cargo tank high-level alarms be tested by physically raising liquid level?

Under IGC Code paragraph 13.3.5, high-level alarms must be verified by physically raising tank cargo liquid to the alarm point at first full loading following delivery and again after every dry-docking. HSSC A.1207(34) witnesses this topping-off check at Initial (2.1.2.12.9), Intermediate (2.3.2.6), and Renewal (2.4.2.4). Routine pre-cargo functional testing of electrical circuits and sensors is required before every transfer (13.3.6, 18.6.2).

Did post-2014 IGC Code amendments change submerged pump, piping, or ESD chapters?

None of the amendments checked for this guide (MSC.411(97), MSC.441(99), MSC.476(102), MSC.492(104), MSC.523(106) and MSC.566(109)) changed IGC Chapters 5, 7, 8, 10, 13, or 18; check the IMO list for anything adopted later. Within those chapters, only the 2017 Secretariat corrigendum (Note Verbale NV.004, Supplement QA104E) corrected 5.9.3.1 (butt-weld NDT), 5.11.6.3 (fail-closed ESD valves), and 13.6.4 (O2 monitoring), plus an Appendix 2 fix. Gas carriers constructed on or after 1 July 1986 and before 1 July 2016 follow the earlier IGC edition named in 1.1.2.3 unless the Code expressly says otherwise (for example 2.2.6.1).

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.