Under SOLAS II-2/10.2.2.3.1.2 and FSS Code Chapter 12, every SOLAS cargo ship (500 GT and upwards under SOLAS I/3) and every passenger ship under 1,000 GT needs an EFP if one compartment fire could disable all main pumps. Passenger ships of 1,000 GT+ sit outside Chapter 12 and separate main pumps under 10.2.2.3.1.1.
FSS Code Chapter 12 sets output at 40% or more of total required main capacity: at least 25 m³/h on cargo ships 2,000 GT+ or passenger ships under 1,000 GT, and 15 m³/h on cargo ships under 2,000 GT. Suction head and NPSH must sustain flow and SOLAS II-2/10.2.1.6 pressures across service list, trim, roll, and pitch, excluding dry-dock ballast condition.
Under FSS Code Chapter 12 para. 2.2.2.1 (MSC.339(91), effective 1 July 2014), diesel drives need 0 °C hand cranking, or flag-approved stored energy for six starts in 30 minutes (two in the first 10 minutes). Unheated spaces also require electric cooling-water or lube-oil heating where needed. Para. 2.2.2.2 mandates a 3-hour service tank plus 15 hours outside Category A spaces, and 43 °C to under 60 °C fuel triggers four SOLAS II-2/4.2.1.3 safeguards.
IMO guidance MSC.1/Circ.1432 recommends monthly fire-pump pressure runs and EFP fuel and heating checks (5.1.2 and 5.1.3), and an annual flow test of all fire pumps with the EFP tested with its isolation valves closed (7.1.2). It lists no weekly EFP items. Prepare for A.1207(34) Safety Equipment dual-jet checks and A.1206(34) Appendix 7 crew familiarity checks.
SOLAS Chapter II-2 (Regs. 10.2 & 4.2.1.3) and FSS Code Chapter 12 (MSC.98(73) & MSC.339(91)) Emergency Fire Pump Baselines
Regulatory Parameter
Cargo Ships (SOLAS II-2/10.2 & FSS Ch. 12)
Passenger Ships (SOLAS II-2/10.2 & FSS Ch. 12)
Statutory Boundary & Cross-Rules
Trigger & FSS Ch. 12 applicability
All SOLAS cargo ships (500 GT+ under SOLAS I/3, no higher Ch. II-2 floor) need an FSS Ch. 12 EFP if one compartment fire could disable all main pumps (10.2.2.3.1.2).
Under 1,000 GT: FSS Ch. 12 EFP applies (10.2.2.3.1.2). At 1,000 GT+, ships sit outside FSS Ch. 12 (para. 1) and must separate main fire pumps (10.2.2.3.1.1).
Main pump counts (10.2.2.2): 3+ pax 4,000 GT+, 2+ pax under 4,000 GT, 2+ independent cargo 1,000 GT+, 2 power (1+ independent) cargo under 1,000 GT.
Minimum EFP output & hydrant pressure
At least 40% of total required main capacity (10.2.2.4.1, 180 m³/h cap). Floors: 25 m³/h (2,000 GT+) or 15 m³/h below (FSS 12/2.2.1.1). Hydrant floor: 0.27 N/mm² (6,000 GT+) or 0.25 N/mm² below (10.2.1.6.2).
Under 1,000 GT: at least 40% of total required main capacity and 25 m³/h minimum (FSS 12/2.2.1.1.1), holding 0.30 N/mm² (10.2.1.6.1). Separate main pumps on 4,000 GT+ pax ships hold 0.40 N/mm².
No numeric upper ceiling in SOLAS (10.2.1.6.3 caps pressure at safe hose control). Relief valves apply only if pump pressure can exceed system design pressure (10.2.1.4.3).
Suction head, NPSH & sea-chest piping
Total suction head and NPSH must sustain output and hydrant pressure across service list, trim, roll, and pitch, excluding dry-dock entry or exit ballast condition (FSS 12/2.2.1.3).
Identical FSS 12/2.2.1.3 service suction-head and NPSH requirement for covered passenger ships under 1,000 GT.
Sea inlet and pipes sit outside machinery space (Reg. 10, para. 2.1.4.1). Where impracticable, an engine-room sea chest needs an EFP-room remote valve, shortest suction run, and short penetrating lengths in steel casing or A-60, wall 11 mm+, welded except inlet flange.
Diesel starting & preheating
0 °C hand cranking, or if impracticable with flag approval, stored energy (air, electric, hydraulic, cartridges) for 6 starts in 30 min including 2 in first 10 min (FSS 12/2.2.2.1 via MSC.339(91)).
Identical FSS 12/2.2.2.1 rules for diesel-driven EFPs on covered passenger ships under 1,000 GT.
From 1 July 2014 (MSC.339(91)), in an unheated space, electric cooling-water or lube-oil heating is mandatory if ready starting is uncertain, hand cranking is impracticable, or sub-zero air is expected.
Fuel endurance, flashpoint & electric backup
Service tank for at least 3 h full load plus 15 h reserve outside Category A spaces (FSS 12/2.2.2.2). Where an electric EFP depends on the emergency generator, the emergency source normally supplies it for 18 h (II-1/43.2.5); for regular short voyages the Administration may accept not less than 12 h (43.2.6.2).
Identical 3 h plus 15 h diesel fuel tankage where diesel-driven (FSS 12/2.2.2.2). On passenger ships the emergency source normally supplies one of the fire pumps for 36 h (II-1/42.2), or not less than 12 h where the Administration accepts this for regular short voyages (42.2.7).
Fuel with a flashpoint from 43 °C to under 60 °C may be permitted (II-2/4.2.1.3) only with all four safeguards: tanks outside Cat. A spaces unless in the double bottom, oil-temperature measurement on the fuel-pump suction, stop valves or cocks on both sides of the strainers, and welded or cone/spherical union joints as far as practicable.
Space boundary, access & isolating valves
No boundary touching Cat. A or main-pump spaces unless impracticable, then insulated to control-station standard (A-60 vs Cat. A under II-2/9). No direct machinery-space access; where impracticable, the Administration may accept an airlock or a remotely operated watertight door, with a second means of access (10.2.2.3.2.2).
Identical SOLAS II-2/10.2.2.3.2 boundary, airlock/watertight-door access, and smoke-precluding ventilation safeguards.
Machinery-space fire-main isolating valve sits in an accessible tenable spot outside machinery spaces (Reg. 10, para. 2.1.4.1). Tankers also fit poop-front and tank-deck isolating valves max 40 m apart (10.2.1.4.4).
1. SOLAS II-2/10.2 and FSS Code Chapter 12: Applicability, Capacity and Hydrant Pressure
A fire inside one machinery space can disable every main fire pump installed in that compartment. To preserve fire-main water from outside that space, SOLAS Chapter II-2 Regulation 10.2 (IMO Resolution MSC.99(73), effective 1 July 2002) pairs with FSS Code Chapter 12 (IMO Resolution MSC.98(73)).
Start by separating ship classes cleanly. Under FSS Code Chapter 12 paragraph 1 and SOLAS II-2/10.2.2.3.1.1, passenger ships of 1,000 GT and upwards sit outside Chapter 12. Those ships must arrange sea connections, fire pumps, and power sources so no single compartment fire disables all fire pumps.
By contrast, SOLAS II-2/10.2.2.3.1.2 applies to passenger ships under 1,000 GT and all SOLAS cargo ships (500 GT and upwards under SOLAS I/3, with no higher Chapter II-2 tonnage floor). Whenever one compartment fire could disable all main pumps, the vessel needs an FSS Code EFP whose power source and sea connection sit outside the space holding the main pumps and their driving power sources.
Verify exact SOLAS II-2/10.2.2 numbers before auditing schematics. Paragraph 10.2.2.1 accepts general-service, bilge, ballast, or sanitary pumps as fire pumps if they do not normally pump oil. Paragraph 10.2.2.2 sets minimum main pump counts: three on passenger ships of 4,000 GT+, and two on smaller passenger ships. Cargo ships of 1,000 GT+ need at least two independent pumps, while smaller SOLAS cargo ships need two power pumps with at least one independent.
Under paragraph 10.2.2.4.1, total required main output equals at least two-thirds of total required bilge-pump output on passenger ships (.1). On cargo ships (.2), total main capacity equals at least four-thirds of the capacity required for each independent bilge pump aboard an equal-sized passenger ship, capped at 180 m³/h. Paragraph 10.2.2.4.2 requires each main pump to deliver at least 80% of total required capacity divided by minimum pump count, never under 25 m³/h, while feeding two jets. Cargo fire-main piping need not exceed the diameter for 140 m³/h (10.2.1.3).
Against that baseline, FSS Code Chapter 12 paragraph 2.1 mandates a fixed, independently driven power pump. Paragraph 2.2.1.1 sets minimum EFP output at 40% of total required main capacity. Output must never drop below 25 m³/h on passenger ships under 1,000 GT or cargo ships of 2,000 GT+, or 15 m³/h on cargo ships under 2,000 GT.
Chapter 12 paragraph 2.2.1.2 sets no pressure figure of its own: while the pump delivers its required output, hydrant pressure must be no less than the minimum required by SOLAS Chapter II-2, which means the figures in II-2/10.2.1.6. That is at least 0.30 N/mm² on covered passenger ships under 1,000 GT (passenger ships of 4,000 GT+ use separated main pumps at 0.40 N/mm²). Cargo ships require 0.27 N/mm² at 6,000 GT+, or 0.25 N/mm² below 6,000 GT.
SOLAS II-2/10.2.1.6.3 sets no numeric upper pressure ceiling, stipulating only safe hose control. Relief valves under paragraph 10.2.1.4.3 apply only if pump pressure can exceed system design ratings. Under SOLAS II-2/19.3.1.5, an EFP does not count toward the four-nozzle main water supply on dangerous-goods ships.
Verify the vessel's exact statutory class: SOLAS cargo ship (500 GT+, II-2/10.2.2.3.1.2) or passenger ship under 1,000 GT under FSS Code Chapter 12, versus separated main pumps on passenger ships of 1,000 GT and upwards.
Cross-check EFP nameplate flow against FSS Code 12/2.2.1.1: at least 40% of total required main capacity. Minimum floors are 25 m³/h (cargo 2,000 GT+ or pax under 1,000 GT) and 15 m³/h (cargo under 2,000 GT).
Confirm hydrant pressure floors match SOLAS II-2/10.2.1.6 (0.30 N/mm² covered pax under 1,000 GT, 0.27 N/mm² cargo 6,000 GT+, 0.25 N/mm² cargo below 6,000 GT) using 12, 16, or 19 mm dual-purpose shut-off nozzles (10.2.3.3).
Verify an international shore connection (minimum one unit) sits aboard ships of 500 GT+ (SOLAS II-2/10.2.1.7 & FSS Ch. 2), usable either side. Check specs: 178 mm OD, 64 mm ID, 132 mm BCD, four 19 mm slots, 14.5 mm min thick, 1 N/mm² gasket, four 16 × 50 mm bolts, eight washers, and four 16 mm nuts.
2. Suction Head, NPSH, Light-Ballast Submergence and Priming Hydraulics
Losing prime at light ballast draught can prevent an EFP from building required fire-main pressure. Under FSS Code Chapter 12 paragraph 2.2.1.3, total suction head and net positive suction head (NPSH) must preserve required flow and hydrant pressure across service list, trim, roll, and pitch. Ballast condition when entering or leaving dry dock is excluded.
One key regulatory boundary matters here: FSS Code Chapter 12 contains no maximum suction-lift figure and no fixed priming-time limit, and neither does SOLAS II-2/10; the Code requires the suction head and NPSH to be designed for the service conditions. For cargo ships constructed on or after 1 January 2012, IMO unified interpretation MSC.1/Circ.1388 adds that it should be documented that the suction inlet stays fully submerged: in the lightest seagoing ballast condition with the tabulated pitch, roll and heave; at a still waterline through 2/3 propeller immersion at even keel; and in the arrival ballast condition with 10% stores and fuel. Available NPSH should exceed required NPSH, and the capacity test should be carried out, as far as practicable, at the lightest seagoing draught. If your class rules or the pump maker quote a suction-lift limit, priming target or NPSH margin, apply it as that class or maker requirement, not a treaty number.
Centrifugal hydraulics explain why light ballast stresses priming. Available NPSH (NPSHa) starts with atmospheric head on the sea surface minus seawater vapour pressure head at operating temperature. Subtract static lift above the waterline (or add positive submergence) and subtract entrance and friction losses across the sea chest, strainer, check valve, and suction line.
In light ballast, two effects compress NPSHa together. Static lift rises on dry-mounted pumps above the waterline, while pitching or rolling can bring the sea chest closer to the surface and pull air vortices into the inlet. Fouled gratings, choked mud-box strainers, or warm tropical seawater raise friction loss and vapour pressure further.
If NPSHa drops near required NPSH (NPSHr), vapour bubbles form at the impeller eye and collapse downstream, causing cavitation noise, erratic gauge bounce, and pressure collapse. Even before cavitation starts, a small air leak across a worn mechanical seal, dried packing, loose strainer gasket, or leaking priming valve breaks vacuum and stops water lift.
Ships counter air-lock risk with two layouts. Vertical deepwell or submerged-impeller pumps place the impeller below the lightest seagoing waterline so positive static head feeds the eye without vacuum priming. Dry-mounted pumps above the waterline rely on self-priming casings or dedicated liquid-ring, diaphragm, or ejector primers that must stay charged, sealed, and vented.
During light-ballast trials, read the compound suction vacuum gauge alongside discharge pressure. High vacuum with low discharge points toward a throttled sea-inlet valve, fouled grating, or plugged mud box. Near-zero vacuum with zero discharge points toward suction-side air ingress, a stuck priming valve, a worn shaft seal, or a dry priming chamber.
Verify EFP layout (submerged vertical deepwell vs dry-mounted self-priming or vacuum-primed unit) and keep priming chambers charged per maker instructions.
Inspect suction integrity before light-ballast runs: check mud-box gaskets, drain plugs, vent cocks, priming valves, and shaft packing or mechanical seal leakage.
Monitor compound suction vacuum and discharge gauges during tests so cavitation, blocked strainers, and air ingress separate cleanly.
Confirm suction and discharge gauges are calibrated and readable, and verify any automatic priming cut-out disengages once full discharge pressure establishes.
3. EFP Space Boundaries, Airlock Access, Sea-Chest Piping and Isolating Valves
FSS Code Chapter 12 finishes at paragraph 2.2.2.2, meaning there is no Chapter 12 paragraph 2.2.2.3 and no 20 m² ventilation clause. Space location, structural fire boundaries, compartment access, smoke-precluding ventilation, and machinery-space piping rules sit directly in SOLAS Chapter II-2 Regulations 10.2.2.3.2 and 10.2.1.4.
Under SOLAS II-2/10.2.2.3.2.1, the EFP space must not share boundaries with Category A machinery spaces or main-fire-pump spaces. Where separation is impracticable, the shared bulkhead must meet control-station structural fire protection. Under SOLAS II-2/9 tables, a bulkhead between a control station and a Category A machinery space requires A-60 insulation (and A-15 against other machinery spaces on cargo ships).
Compartment access follows paragraph 10.2.2.3.2.2. Direct access linking the machinery space with the EFP or its power source is prohibited. Where separation cannot be achieved, the flag Administration can approve one of two options paired with a second access route into the EFP compartment.
Option one is an airlock. Its machinery-space door must be A-60 class and the other door at least steel. Both doors must be reasonably gastight and self-closing, with no hold-back arrangements. Option two is a watertight door remotely operated from outside both spaces that fire in either space is unlikely to cut off. Under 10.2.2.3.2.3, ventilation to the independent power-source space must preclude machinery-space fire smoke from entering as far as practicable.
Fire-main isolation and piping survivability sit in SOLAS Reg. II-2/10 (para. 2.1.4.1). Isolating valves separating the machinery-space fire-main loop from the remaining deck fire main must sit outside machinery spaces in a readily accessible, tenable spot. Closing them must let another pump or the EFP supply every hydrant outside that isolated space.
Paragraph 2.1.4.1 of SOLAS Reg. II-2/10 also requires placing the EFP, its sea inlet, suction piping, discharge lines, and isolating valves outside the machinery space. Only where impracticable may the sea chest sit inside the machinery space under tight safeguards. The sea-inlet valve must operate remotely from inside the EFP compartment, with the suction line as short as practicable. Any short penetrating suction or discharge length needs a substantial steel casing or A-60 insulation, wall thickness of at least 11 mm, and all-welded joints except the bolted sea-inlet flange.
Two additional valve rules protect fire-main integrity. On tankers, paragraph 10.2.1.4.4 mandates isolating valves at a protected poop-front position and along the tank deck spaced no more than 40 m apart. Across SOLAS ships, paragraph 10.2.1.1 requires isolation valves on open-deck fire-main branches used for other duties, such as deck or anchor washing. It also requires the piping to be arranged to avoid freezing and to have suitable drainage.
Walk the EFP room access route and confirm zero unapproved direct entry from the machinery space. If an airlock is fitted under II-2/10.2.2.3.2.2, verify both self-closing doors shut reasonably gastight without wedges or hold-back hooks.
Exercise the machinery-space fire-main isolating valve outside the engine room (SOLAS Reg. II-2/10, para. 2.1.4.1), deck/anchor-wash branch valves (10.2.1.1), and tanker 40 m deck valves (10.2.1.4.4).
Where an approved machinery-space sea chest exists under SOLAS Reg. II-2/10 (para. 2.1.4.1), verify remote sea-inlet valve control from inside the EFP room and inspect steel casing or A-60 insulation.
Confirm unobstructed ventilation serving the EFP compartment precludes machinery-space smoke entry per II-2/10.2.2.3.2.3 (and check any fitted duct dampers under II-2/9.7).
In practice, emergency fire pumps are driven by an independent diesel prime mover or an electric motor fed from the emergency switchboard (FSS Code 12/2.1 requires a fixed, independently driven, power-operated pump). Where an electric EFP depends on the emergency generator, cargo ships normally provide 18 hours of emergency power for it (SOLAS II-1/43.2.5), which the Administration may reduce to not less than 12 hours for ships regularly on short voyages (II-1/43.2.6.2). Passenger ships normally provide 36 hours for one of the fire pumps (II-1/42.2), with the same 12-hour short-voyage option under II-1/42.2.7.
Diesel starting reliability sits in FSS Code Chapter 12 paragraph 2.2.2.1, replaced by IMO Resolution MSC.339(91) (adopted 30 November 2012, effective 1 July 2014). Every diesel prime mover must readily start cold down to 0 °C by hand cranking.
Before 1 July 2014, the 2000 FSS Code text only required consideration to be given to heating arrangements acceptable to the Administration. MSC.339(91) replaced that wording with a mandatory safeguard. In an unheated space, where reliable cold starting is uncertain, hand cranking is impracticable, or lower ambient temperatures are expected, electric heating of cooling-water or lube-oil circuits must be fitted to flag satisfaction.
Where hand cranking is impracticable, paragraph 2.2.2.1 allows Administration-approved stored-energy starting via compressed air, electricity, or other means, naming hydraulic power and starting cartridges since MSC.339(91). Approved stored-energy systems must deliver at least six starts within 30 minutes, including at least two starts inside the first 10 minutes.
Fuel endurance follows FSS Code Chapter 12 paragraph 2.2.2.2. The service fuel tank must hold enough fuel to run the pump on full load for at least 3 hours, and reserve fuel kept outside Category A machinery spaces must run it on full load for a further 15 hours (18 hours in total). Keeping the reserve inside a Category A machinery space does not meet 2.2.2.2.
Emergency fire pump engines do not follow the same fuel flashpoint clause as emergency generators. SOLAS II-2/4.2.1.1 sets a 60 °C minimum closed-cup flashpoint for shipboard oil fuel, while 4.2.1.2 permits emergency generators to burn fuel down to 43 °C directly. Emergency fire pump engines outside Category A spaces instead sit under paragraph II-2/4.2.1.3.
SOLAS II-2/4.2.1.3 permits 43 °C to under 60 °C fuel in an EFP engine only subject to all four safeguards. Non-double-bottom fuel tanks must sit outside Category A machinery spaces (.3.1), with oil-temperature measurement fitted on the fuel-pump suction pipe (.3.2). Stop valves or cocks must sit on both inlet and outlet sides of fuel strainers (.3.3), and welded or circular-cone/spherical union joints must be used as far as practicable (.3.4). Under II-2/4.2.2.3.4, any oil fuel pipe that could spill oil if damaged from any daily service, settling, or storage tank (500 litres+, above the double bottom) needs a tank-mounted remote-closing valve.
Verify diesel starting under FSS Code 12/2.2.2.1 (MSC.339(91)): test hand cranking or stored-energy starters (six starts in 30 min, two in first 10 min) and confirm electric cooling-water or lube-oil heaters work in unheated spaces.
Confirm the service tank holds at least 3 hours of full-load fuel and verify 15 hours of reserve fuel sit outside Category A spaces (FSS Code 12/2.2.2.2).
Check bunker flashpoint certificates: if burning 43 °C to under 60 °C gas oil on an EFP engine, confirm all four SOLAS II-2/4.2.1.3 safeguards (.3.1 to .3.4) are fitted and intact.
For electric EFPs, confirm breaker settings, switchboard feeders, and generator endurance (normally 18 h cargo under II-1/43.2.5 or 36 h passenger under II-1/42.2, unless a 12 h short-voyage acceptance applies under 43.2.6.2 / 42.2.7).
Operational readiness rests on SOLAS II-2/14, which applies to ships in service including pre-2002 hulls via II-2/1.2.2.2. Under paragraph 14.2.2, ships must keep an onboard maintenance plan covering fire pumps, fire mains, hydrants, nozzles, fire hoses, and international shore connections (14.2.2.3.1). Execution follows IMO guidance in MSC.1/Circ.1432.
Keep two boundaries clear on MSC.1/Circ.1432. First, it is IMO guidance, not a regulation in its own right, although SOLAS II-2/14.2.2.1 requires maintenance to be based on IMO guidelines. Second, Weekly Section 4 lists zero fire-main or EFP items (Section 4.7 covers sprinkler, water-spray, and water-mist installations only). Similarly, MSC.1/Circ.1516 changed only the water-quality and sprinkler, water-spray and water-mist paragraphs (3.4, new 6.5, 7.5 and 9.3) and left the fire-main intervals unchanged. Weekly EFP runs are company SMS or flag practice, not an MSC.1/Circ.1432 rule.
Under MSC.1/Circ.1432 Monthly Section 5.1, crew confirm hydrants, hoses, and nozzles stay stowed and serviceable (5.1.1), run all fire pumps for adequate pressure (5.1.2), and inspect EFP fuel and heating readiness (5.1.3). Quarterly Section 6.1 checks international shore connections. Annual Section 7.1 adds visual inspections (7.1.1), flow-testing all fire pumps plus testing the EFP with isolation valves closed (7.1.2), and exercising hydrant valves (7.1.3). Annual checks also pressure-test a sample of hoses at the maximum fire-main pressure, so that every hose is tested within five years (7.1.4). They confirm that any fire-pump relief valves are correctly set (7.1.5), examine all filters and strainers for debris or contamination (7.1.6), and check that nozzles are the correct size and type, maintained and working (7.1.7).
Statutory HSSC surveys follow IMO Resolution A.1207(34) (adopted 3 December 2025). On cargo ships, fire pumps are surveyed only under the Safety Equipment guidelines (Annex 1, Section (E) 1). The Safety Construction guidelines (Section (C) 2) contain no II-2/10.2 items, though they cover areas around the EFP such as structural fire boundaries ((CI) 2.1.4.59, (CA) 2.2.2.28), emergency power ((CI) 2.1.4.54, (CA) 2.2.2.24), and oil fuel systems (II-2/4.2). Bottom sea chests and strainers sit in Annex 1, Section (B) 3 under (CB) 3.1.5.
At Cargo Safety Equipment Initial survey, (EI) 1.1.1.1 reviews drawings and (EI) 1.1.4.1 (both citing MSC.1/Circ.1388 in footnotes) verifies three layers. Surveyors inspect hardware visually and run each fire pump, covering the EFP too, for two simultaneous jets from separate hydrants at required pressure. They also verify dedicated EFP capacity, including any fixed extinguishing system for which it is the main water supply. Maintenance plans are checked under (EI) 1.1.7.2 and (EA) 1.2.1.10.
At Cargo Annual survey, (EA) 1.2.2.1 repeats visual checks and separate pump operational tests (covering the EFP) for two simultaneous jets at required pressure, without repeating the separate Initial capacity-test clause. The Periodical survey (EP) 1.3.2.1 applies all of (EA) 1.2.2, including the two-jet test, and the Renewal survey (ER) 1.4.2.1 applies (EP) 1.3.2 in turn, while weather-deck container monitors test operationally at Initial (EI) 1.1.4.2 and Renewal (ER) 1.4.2.2. Tankers add simultaneous deck-foam fire-main pressure checks under (EI) 1.1.5.1 and (EA) 1.2.3.1. Dangerous-goods ships test water supplies under (EI) 1.1.4.16 and (EA) 1.2.2.17.
Passenger Ship Safety surveys mirror that split on a 12-month Renewal cycle. Initial (PI) 5.1.1.12 reviews plans and (PI) 5.1.3.71 carries all three physical verification layers, both citing MSC.1/Circ.1388 in footnotes. Annual Renewal (PR) 5.2.2.68 verifies visual condition and separate pump dual-jet pressure (covering any EFP) alongside readiness under (PR) 5.2.2.80.
Under IMO Resolution A.1206(34) (adopted 3 December 2025), Appendix 2 Section 5 lists non-exhaustive detention examples under PSCO professional judgement. Examples include fire-fighting equipment that is missing, non-compliant or so deteriorated that it cannot do its job (SOLAS item 6), failure of the emergency generator, lighting, batteries or switches (item 3), which matters where the EFP is electrically driven, and a serious deficiency in the operational requirements listed in Appendix 7 (item 13). Under Appendix 6 para. 6.1, fire and wash-deck lines and hydrants in poor condition, or missing hoses, may prompt a closer inspection of all fire safety equipment, while Appendix 12 Part B item 49 lists SOLAS II-2/14 maintenance plans.
IMO Resolution A.1206(34) Appendix 7 sets specific crew familiarity checks for emergency fire pumps. Part 1 para. 3.1 expects responsible crew to operate essential gear without coaching. Part 1 para. 5.1.4.6 states that detention may be considered if relevant officers or crew are unfamiliar with EFP starting location or starting operation. Part 2 para. 1.3.4.2 allows the PSCO to verify crew knowledge of pump counts and positions (.1), starting procedures (.2), and correct valves (.3). Part 2 para. 2.5.4 brings personnel assigned to EFPs into PSC-witnessed fire drills for explanation and demonstration.
Keep the SOLAS II-2/14 maintenance plan (A.1206(34) App. 12 Part B item 49) updated with monthly fire-pump runs and EFP fuel/heating checks (MSC.1/Circ.1432 5.1.2 to .3). Also log annual isolated EFP flow tests (7.1.2) and 5-year rolling hose tests (7.1.4).
Prepare for the A.1207(34) Annual (EA) 1.2.2.1 or Passenger Renewal (PR) 5.2.2.68 two-jet test, in which each pump, including the EFP, is run on its own. In your own annual test, run the EFP with its isolation valves closed, as MSC.1/Circ.1432 7.1.2 recommends.
Train every watchkeeping officer and engine rating to pass A.1206(34) Appendix 7 uncoached (Part 1 3.1): locate the EFP, line up valves (Part 2 1.3.4.2), and start the pump cleanly (Part 1 5.1.4.6).
Involve assigned EFP personnel actively during shipboard and PSC-witnessed fire drills (A.1206(34) Appendix 7 Part 2 para. 2.5.4) rather than leaving the pump station unmanned.
6. Onboard Emergency Fire Pump Readiness Walkaround, Troubleshooting and Fleet Support
Treat the checks below as shipboard SMS and maker maintenance discipline supporting SOLAS and FSS Code baselines rather than convention intervals. Keeping an EFP reliable across light-ballast passages and winter ports depends on consistent mechanical, hydraulic, and starting-gear checks.
Begin every routine check at the valves and gauges. Confirm the sea-suction valve opens smoothly, or verify its remote actuator inside the EFP room moves freely where the sea chest sits in the machinery space (SOLAS Reg. II-2/10, para. 2.1.4.1). Verify the discharge check valve seats cleanly without backflow, and check gauge isolation cocks and calibration stickers.
Inspect priming and shaft seals before starting. On vacuum-primed or liquid-ring units, verify priming-tank level, check strainer gaskets and drain plugs for air leaks, and inspect packing or mechanical seals for drips or scoring. On vertical deepwell units, inspect shaft-tube lubrication, thrust bearing temperature, and discharge flanges for weeping.
Run an isolated pressure test under the ship's SMS at planned intervals, such as before an Annual Safety Equipment survey or pre-arrival check. Close the machinery-space isolating valve outside the engine room and open two remote hydrants (bridge wing and forecastle) with 12, 16, or 19 mm nozzles. Start the EFP and confirm steady vacuum plus hydrant pressure at or above the II-2/10.2.1.6 floor. Drain exposed deck lines in freezing trades (II-2/10.2.1.1) and restore the isolating valve.
Verify diesel readiness against FSS Code 12/2.2.2 before sailing. Confirm the service tank holds 3-hour capacity, verify 15-hour reserve fuel sits outside Category A spaces, and inspect fuel strainers. In cold trades, check electric cooling-water or lube-oil heaters alongside battery voltage, hydraulic pre-charge, or air pressure. On electric EFPs, verify emergency-switchboard feeders, insulation logs against maker limits, and controls.
For light-ballast cavitation, priming loss, relief-valve chatter, cold-start faults, or survey prep, Marvel Solutionz provides chief-engineer troubleshooting at $350 USD for a 1-hour consultancy (+ 5% sales tax). Fleet teams can also enrol in the LNG, Dual-Fuel & Spark-Gas Academy at $395 USD self-paced (+ 5% sales tax) or Corporate Team Training up to 10 engineers at $3,500 USD (+ 5% sales tax).
Check sea-suction valve lineup, mud-box gaskets, priming-tank level, and shaft seal condition before running the EFP.
Run isolated dual-jet tests with the machinery-space isolating valve closed, logging suction vacuum, discharge pressure, and nozzle flow against SOLAS II-2/10.2.1.6.
Verify 3-hour day tank plus 15-hour external reserve fuel, cooling/lube heaters, starting charge, and insulation readings before cold voyages or surveys.
Restore the machinery-space isolating valve, drain frost-prone deck lines in sub-zero trades, and update the SOLAS II-2/14 maintenance log after every run.
Frequently Asked Questions
Does FSS Code Chapter 12 require a fixed 4.5-metre maximum suction lift on emergency fire pumps?
No. FSS Code Chapter 12 sets no fixed suction-lift figure. Under paragraph 2.2.1.3, the total suction head and NPSH must be determined so that the pump keeps its required capacity and hydrant pressure under all list, trim, roll and pitch likely in service. The ballast condition when entering or leaving dry dock does not count as a service condition. For cargo ships built on or after 1 January 2012, IMO unified interpretation MSC.1/Circ.1388 adds that the suction inlet should be documented as fully submerged in the lightest seagoing condition (with pitch, roll and heave) and in two still-water conditions, with available NPSH greater than required NPSH. If a class rule or the pump maker quotes a suction-lift limit, treat it as that class or maker requirement, not a Code figure.
What minimum flow and hydrant pressure must an emergency fire pump deliver?
Under FSS Code Chapter 12 paragraph 2.2.1.1, output must equal at least 40% of total required main capacity. Floors are 25 m³/h on cargo ships 2,000 GT+ or passenger ships under 1,000 GT, and 15 m³/h on smaller cargo ships. Hydrant floors (SOLAS II-2/10.2.1.6) are 0.30 N/mm² for covered passenger ships under 1,000 GT (4,000 GT+ pax ships use separated main pumps at 0.40 N/mm²), and 0.27 N/mm² (6,000 GT+) or 0.25 N/mm² below on cargo ships.
Does MSC.1/Circ.1432 require testing the emergency fire pump every week?
No. MSC.1/Circ.1432 is IMO recommendatory guidance whose Weekly Section 4 lists zero fire-main or EFP items. Monthly Section 5.1 recommends running all fire pumps for adequate pressure and checking EFP fuel and heating, while Annual Section 7.1 recommends flow-testing the EFP with isolation valves closed. Weekly tests are company SMS or flag practice.
What starting and fuel rules apply to diesel-driven emergency fire pumps?
Under FSS Code Chapter 12 para. 2.2.2.1 (MSC.339(91), effective 1 July 2014), diesel drives need 0 °C hand cranking, or flag-approved stored energy for six starts in 30 minutes (two in the first 10 minutes). Unheated spaces also require electric cooling-water or lube-oil heating if cold starting is uncertain, hand cranking is impracticable, or sub-zero air is expected. Para. 2.2.2.2 mandates a 3-hour service tank plus 15 hours outside Category A spaces.
Can crew unfamiliarity with the emergency fire pump lead to PSC detention under IMO Res. A.1206(34)?
Yes, subject to PSCO professional judgement. A.1206(34) Appendix 7 Part 1 para. 5.1.4.6 states that detention may be considered if relevant officers or crew are unfamiliar with EFP starting location or starting operation. Part 2 paras. 1.3.4.2 and 2.5.4 also check pump counts, valve lineups, and PSC-witnessed fire-drill participation.
Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).
Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.
Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.