Fixed CO2 Fire-Extinguishing System, Cylinder Weighing, Hydrostatic Testing & FSS Code Chapter 5 Guide

SOLAS II-2/10.4-10.9 & FSS Code Ch. 5 fixed CO2 guide: charge sizing, 2-control interlocks, MSC.1/Circ.1318/Rev.1 weighing & hydrotest, HSSC and PSC.

← All technical guides · Category: Dual-Fuel & Marine Engines · Updated: · 16 min read

Key Takeaways (TL;DR)

  • SOLAS II-2/10.4 to 10.9 (MSC.99(73), with II-2/10.4.1.5 added by MSC.256(84)) and FSS Code Chapter 5 (MSC.206(81), updated by MSC.339(91)) govern fixed CO2 systems. MSC.327(90) amended Chapters 6 (foam) and 8 (sprinklers), not Chapter 5.
  • FSS Code Chapter 5 para. 2.2.1.5 computes free CO2 at 0.56 m³/kg, sizing machinery spaces for the larger of 40% gross volume excluding upper casing or 35% gross volume including casing (85% discharged in 2 minutes). Cargo holds take 30%, sealable ro-ro spaces take 45%, and special category spaces bar CO2.
  • Where crew work or have access, FSS 5/2.2.2 requires two separate controls that can only be used in order (distribution valve first, then the cylinders), and 2.1.3.2 requires an automatic audible and visual alarm for at least 20 seconds before release. Ships built before 1 July 2002 had to bring machinery-space and cargo pump-room CO2 controls up to 2.2.2 by the first scheduled dry-docking after 1 January 2010 (II-2/10.4.1.5). CO2 rooms below deck or without open-deck access need low-level exhaust of at least 6 air changes an hour (II-2/10.4.3).
  • IMO guidance MSC.1/Circ.1318/Rev.1 (25 May 2021; SOLAS II-2/14.2.2.1 bases maintenance on IMO guidelines, and flag, class or the SMS can make it binding) outlines 30-day checks, biennial passenger or cargo-survey charge checks (>90% HP main/pilot plus LP level), and isolated dry-air blow-through. It also outlines 5-year internal control-valve checks and 100% hydrotesting prior to year 20.

SOLAS Chapter II-2 (Regs. 10.4 to 10.9), FSS Code Chapter 5 (MSC.206(81) & MSC.339(91)) and IMO Guidance MSC.1/Circ.1318/Rev.1 Baselines

System ParameterMachinery Spaces & Pump-RoomsCargo, Vehicle & Ro-Ro SpacesStatutory Rule vs IMO Guidance
Free CO2 ratio (at 0.56 m³/kg)Larger of 40% gross volume excluding upper casing (above where casing plan area is 40% or less of mid-space area) or 35% including casing (2.2.1.3). Cargo ships under 2,000 GT may use 35% / 30% for combined non-separated spaces (2.2.1.4).General cargo: 30% gross volume of largest protected space (2.2.1.1). Sealable non-special-category vehicle/ro-ro: 45% gross volume (2.2.1.2). FSS 5/2.2.1.2 bars CO2 in special category spaces (fixed water-based system via II-2/20.6.1.2).Statutory: FSS Ch. 5 paras. 2.2.1.1 to 2.2.1.5 (MSC.339(91)). Add starting-air receiver free air unless safety valves vent to open air (2.1.1.2).
Discharge rate & sequencing85% of required gas mass discharged within 2 minutes (2.2.1.6). Two separate controls with positive sequence means (2.2.2.1) inside a dedicated release box (2.2.2.2) for personnel-accessible spaces.Sealable vehicle/ro-ro (2.2.1.2) and container/general cargo (2.2.1.7): at least two-thirds in 10 minutes. Solid bulk (2.2.1.7): at least two-thirds in 20 minutes. Controls allow 1/3, 2/3, or full release across 2.2.1.7 holds.Statutory: SOLAS II-2/10.4.1.1.1 (post-2002), II-2/10.4.1.5 (pre-2002 via MSC.256(84)), FSS 5/2.2.1.2, 2.2.1.6, 2.2.1.7, 2.2.2. Pump-rooms need anti-inerting notice (II-2/10.9.1.1.2).
Pre-discharge alarm & pipingAutomatic audible and visual alarm giving 20 seconds escape warning minimum (2.1.3.2). Discharge piping, fittings, and nozzles in the space are made of materials melting above 925 °C (2.1.2.5).Automatic audible/visual alarm covers ro-ro spaces, container holds equipped with integral reefer containers, and door/hatch-accessible spaces (2.1.3.2). Conventional holds and small local-release lockers are exempt.Statutory: FSS Ch. 5 paras. 2.1.2.4 (closed-section relief to open deck) and 2.1.3.1 (accommodation pipes substantial, welded, no drains/openings, 5 N/mm² min test, outside refrigerated spaces).
Storage room & low-pressure tanksExternal room (FSS 5/2.1.2.2) aft of collision bulkhead, sole purpose, independent access, gastight boundaries, outward doors, control-station insulation, 6 ACH low-level exhaust if below deck or lacking open-deck access (II-2/10.4.3).High-pressure storage suits expected service temperatures (2.1.1.4) with hanging bars or other weighing means (2.1.1.3). No fixed 55 °C SOLAS cap sits in Chapter 5.Statutory LP CO2 (2.2.4): 1.8 to 2.2 N/mm², 95% max fill (2.2.4.2), vessel level indicator (2.2.4.3.6), 24 h hold at 45 °C air (2.2.4.5), two reefers rated at 32 °C sea & 45 °C air (2.2.4.6-8).
Monthly, annual, biennial & 5-year checksMonthly (30 d, § 4.1 all systems): stop valves closed, controls ready, piping/bottles/alarms intact. LP additionally (§ 4.2): pressure/level normal, main service & vapour valves open. Annual (§ 5): visual, boundaries, hoses, protected-space doors.Passenger biennial (2 y +/- 3 m) or cargo intermediate, periodical, or renewal survey (§ 6.1): verify >90% HP main & pilot charge plus LP level (§ 6.1.1), and blow isolated lines with dry air/N2 (§ 6.1.3).IMO guidance (Circ.1318/Rev.1, applied via flag/class/SMS): specialist head/pilot-line test (§ 6.2) biennially pax or renewal cargo, and 5-year internal examination of every HP/LP control valve (§ 7).
Hydrostatic tests & survey anchorsIMO guidance (§ 6.1.2 & App. HP item 19): at the 10-year inspection, test at least a 10% main/pilot sample (ISO 18119:2018). Any fail widens to 50% cumulative, further fail to 100%. Prior to year 20 & every 10 years after: 100% tested.IMO guidance (§ 6.1.2 & App. HP item 24): replace flexible manifold hoses at maker intervals not exceeding 10 years, and visually inspect manifold check valves every 10 years.HSSC/PSC guidance: A.1207(34) cargo (EP) 1.3.2.2 checks CO2 capacity and clear lines, (EA) 1.2.2.8 checks two controls. A.1206(34) App. 2 Sec. 5 (SOLAS item 6) & App. 7 Part 2 2.5.4.

1. SOLAS II-2/10.4 to 10.9 and FSS Code Chapter 5: Sizing, 0.56 m³/kg and Discharge Rates

Fixed carbon dioxide remains the primary total-flooding extinguishing medium across engine rooms, cargo holds, and tanker pump-rooms. Because CO2 displaces oxygen rapidly and endangers anyone still inside the compartment, statutory design rules demand strict accuracy.

Trace the IMO resolution timeline first. SOLAS Chapter II-2 Regulation 10 (MSC.99(73)) and the original FSS Code Chapter 5 (MSC.98(73)) took effect starting 1 July 2002. MSC.256(84) (adopted 16 May 2008, effective 1 January 2010) added SOLAS II-2/10.4.1.5, which reaches back to ships built before 1 July 2002. MSC.206(81) (adopted 18 May 2006, effective 1 July 2010) replaced Chapter 5, adding visual alarms, positive interlocks, air-flow tests, and low-pressure CO2 rules.

MSC.339(91) (adopted 30 November 2012, effective 1 July 2014) amended Chapter 5 paragraphs 2.1.1.1, 2.1.1.3, 2.1.3.2, 2.2.1, and 2.2.2, and deleted old section 2.4. Avoid one citation mix-up: MSC.327(90) amended FSS Code Chapters 6 (foam) and 8 (sprinklers) only, leaving Chapter 5 untouched.

Under paragraph 2.2.1.5, engineers calculate free CO2 gas at 0.56 m³/kg. Multiplying protected compartment gross volume by its statutory percentage and dividing by 0.56 m³/kg yields minimum liquefied CO2 mass.

For machinery spaces (2.2.1.3), required gas equals the larger of two gross-volume calculations. Compare 40% of gross space volume excluding the casing above the level where casing horizontal area stays at or below 40% of mid-space area (midway between tank top and lowest casing part) against 35% including the casing. Cargo ships under 2,000 GT may use 35% and 30% when combined non-separated engine compartments count as one space (2.2.1.4).

Check two Section 2.1.1 volume rules. Under 2.1.1.2, if starting-air receivers sit inside the protected space without safety-valve pipes venting to open air, add their free-air volume to gross machinery volume. Under 2.1.1.1 (MSC.339(91)), adjacent spaces with independent ventilation lacking minimum A-0 fire divisions should be treated as the same space.

For cargo holds, paragraph 2.2.1.1 sets general cargo spaces at 30% of the largest protected cargo space gross volume. Added by MSC.339(91), paragraph 2.2.1.2 sets sealable vehicle and ro-ro spaces at 45% gross volume while barring CO2 inside special category spaces (SOLAS II-2/20.6.1.2 calls for a fixed water-spraying or water-based system there instead).

Discharge rate rules are equally strict. Machinery systems must discharge 85% of required CO2 within 2 minutes (2.2.1.6). Sealable vehicle/ro-ro spaces (2.2.1.2) and container/general cargo holds (2.2.1.7) require at least two-thirds within 10 minutes. Solid bulk holds require at least two-thirds within 20 minutes, with controls across 2.2.1.7 holds permitting one-third, two-thirds, or full release.

Three companion SOLAS II-2 rules also apply. Paint lockers require 40% gross volume if protected by CO2 (II-2/10.6.3), with portable options allowed only under 4 m² deck area when the locker does not open into accommodation spaces (10.6.3.3, via external discharge port). Tanker pump-room CO2 controls must display a warning barring inerting use due to electrostatic ignition hazards (II-2/10.9.1.1.2).

Finally, SOLAS II-2/10.5.6 requires a fixed water-based or equivalent local-application system in Category A spaces above 500 m³ on passenger ships 500 GT+ and cargo ships 2,000 GT+. It works alongside fixed CO2 and protects fire-risk areas without engine shutdown, evacuation, or sealing the space (10.5.6.3) (automatic and manual in UMS spaces, while only manual release is required if continuously manned under 10.5.6.2).

  • Verify the approved CO2 booklet against gross volume, casing cut-off level, and starting-air receiver relief routing (FSS 5/2.1.1.2, 2.2.1.3 to 2.2.1.5).
  • Combine adjacent compartments with independent ventilation lacking minimum A-0 fire divisions in sizing checks (FSS 5/2.1.1.1).
  • Verify paint-locker CO2 sizing (40% gross, portable only under 4 m² without accommodation access, II-2/10.6.3) and tanker pump-room warnings (II-2/10.9.1.1.2).
  • Keep SOLAS II-2/10.5.6 local-application readiness alongside fixed CO2 in covered Category A spaces over 500 m³.

2. Two-Control Release Interlocks, 20-Second Pre-Discharge Alarms and Piping Integrity

An accidental CO2 release into an occupied space can kill within minutes. SOLAS II-2/10.4.1.1.1 requires a fixed gas system to comply with the FSS Code, so a system built to the current Chapter 5 follows para. 2.2.2 directly. For ships built before 1 July 2002, SOLAS II-2/10.4.1.5 (MSC.256(84)) required CO2 systems protecting machinery spaces and cargo pump-rooms to meet para. 2.2.2 by the first scheduled dry-docking after 1 January 2010.

Under MSC.339(91), para. 2.2.2 covers ro-ro spaces, container holds with integral reefer containers, spaces accessible by doors or hatches, and other spaces where people work or have access. Para. 2.2.2.1 mandates two separate controls: Control 1 opens the distribution valve and Control 2 discharges cylinders, with positive sequence means (such as mechanical or pneumatic interlocks) enforcing that order.

Under para. 2.2.2.2, both controls sit inside a clearly marked release box for the target space. If locked, its key must hang inside a break-glass box right beside the cabinet.

Automatic pre-discharge warnings sit in FSS 5/2.1.3.2. Spaces where crew work or have access, including ro-ro spaces, require automatic audible and visual alarms. MSC.339(91) added container holds equipped with integral reefer containers and compartments entered via doors or hatches. Conventional cargo holds and small local-release lockers (paint stores, compressor rooms) are exempt.

The alarm activates automatically (for example, opening the release box door) before the medium is released. Pre-discharge warning time must allow safe escape and last 20 seconds minimum (2.1.3.2), usually provided by a pneumatic or electric time-delay device before pilot gas opens the main cylinders (the setting is the maker's value, checked by the service specialist).

Under para. 2.1.2.5, piping, fittings, and discharge nozzles inside protected spaces must be made of materials melting above 925 °C so machinery fires cannot sever manifolds. Where sections can sit isolated between closed valves, para. 2.1.2.4 mandates pressure-relief devices venting to open deck.

Under para. 2.1.3.1, pipes crossing accommodation must have substantial thickness, welded joints, zero drains or openings, a 5 N/mm² minimum installed pressure test, and zero routing through refrigerated spaces. After installation, pressure testing and inspection, para. 2.2.3 requires a free-air flow test of all pipes and nozzles and a functional test of the alarms. Pair CO2 drills with external air-opening closures (II-2/10.4.2), remote fan stops, skylights, funnel flaps, ventilator dampers (II-2/5.2, 8.3, 9.5), and quick-closing fuel and lube valves (II-2/4.2.2.3.4, 4.2.3.2).

  • Inspect CO2 cabinets for two labelled controls, valve-first interlocks, clear instructions, and an adjacent break-glass key box if locked (FSS 5/2.2.2.1, 2.2.2.2).
  • Verify automatic audible/visual alarms activate and documented escape delay lasts 20 seconds minimum (FSS 5/2.1.3.2).
  • Confirm closed-section relief vents to open deck (2.1.2.4) and accommodation pipes stay welded without drains or openings (2.1.3.1).
  • Test remote stops, ventilator dampers, flaps, skylights, and quick-closing fuel/lube valves outside the engine room (II-2/5.2, 10.4.2, 4.2.2.3.4, 4.2.3.2).

3. CO2 Storage Room Boundaries, Ventilation (6 ACH) and Low-Pressure Bulk Tanks (2.2.4)

Under FSS 5/2.1.2.2, CO2 storage sits outside the protected space unless permitted otherwise, and SOLAS II-2/10.4.3 governs that external room. It must lie aft of the forward collision bulkhead and serve zero other purposes (never store spares, drums, or rags there).

Access must stay independent of the protected space and open preferably from weather deck. Otherwise, the room may sit maximum one level beneath weather deck with direct stairway or ladder access. Boundaries bordering adjacent enclosed spaces must stay gastight, doors must swing outwards, and insulation follows control-station rules (A-60 vs Category A under II-2/9). Below-deck rooms or rooms lacking open-deck access need mechanical low-level exhaust at six hourly air changes minimum (II-2/10.4.3).

Neither SOLAS II-2/10.4.3 nor FSS Chapter 5 sets a numeric 55 °C cap for high-pressure rooms. Para. 2.1.1.4 states qualitatively that storage suits expected ambient temperatures (the Administration or class sets the design limits), while para. 2.1.1.3 (MSC.339(91)) mandates overhead hanging bars above each row or other safe charge-checking means.

Low-pressure bulk CO2 tanks follow FSS 5/2.2.4 (MSC.206(81)). Para. 2.2.4.2 sets working pressure between 1.8 and 2.2 N/mm² and caps volumetric fill at 95%. Under 2.2.4.5, insulation on vessels and filled outgoing pipes must hold pressure below relief lift for 24 hours without refrigeration at 45 °C ambient air.

Under 2.2.4.6 to 2.2.4.8, two independent automated refrigerating units (separate main-switchboard feeders for each electric unit) must each maintain temperature under 24-hour continuous duty at up to 32 °C sea water and 45 °C ambient air.

Low-pressure vessels require two relief valves venting to open air (lifting at 1.1x working pressure minimum, max 20% fire-condition rise, 2.2.4.4) and a vessel liquid CO2 level indicator (2.2.4.3.6). Central audible/visual alarms cover high pressure, low pressure, reefer failure, and lowest permissible level (2.2.4.3.2, 2.2.4.3.3, 2.2.4.11). Because leaking CO2 pools silently along deck plates, treat the room as an enclosed space: run the exhaust and check oxygen with a calibrated SOLAS XI-1/7 portable meter before entry.

  • Keep the CO2 room clear of non-CO2 gear, with gastight boundaries and outward doors intact (II-2/10.4.3).
  • Verify 6 ACH low-level mechanical exhaust in below-deck or non-open-deck CO2 rooms (II-2/10.4.3).
  • Inspect overhead hanging bars or equivalent weighing gear (FSS 5/2.1.1.3) plus cylinder clamps and bases.
  • On LP CO2 tanks, check 1.8 to 2.2 N/mm², vessel level indicator (2.2.4.3.6), both switchboard-fed reefers (2.2.4.6, 2.2.4.8), central alarms (2.2.4.11), and 95% fill logs (2.2.4.2).

4. IMO MSC.1/Circ.1318/Rev.1 Cadence: Monthly, Annual, Biennial and 5-Year Valve Checks

Clarify circular legal status first. SOLAS II-2/14.2.1.2 requires fire-fighting systems to be kept in good working order, and II-2/14.2.2.1 requires maintenance, testing and inspection based on IMO guidelines, under a maintenance plan kept on board (14.2.2.2). IMO circular MSC.1/Circ.1432 section 1 excludes fixed CO2 systems. Instead, MSC.1/Circ.1318/Rev.1 (25 May 2021, MSC 103, replacing the 2009 text) provides recommendatory IMO minimum maintenance guidelines that become binding where incorporated into flag, class, or SMS rules.

Before starting work, Section 2 recommends a safety plan accounting for all personnel, effective communications between inspection staff and watch crew, and advance notice to everyone aboard. As the opening safeguard, lock or remove directional-valve operating levers, or close and lock the system block valve to prevent accidental release.

Section 4.1 sets the 30-day check across ALL fixed CO2 installations (high-pressure and low-pressure). Verify five items: stop valves closed (4.1.1), releasing controls positioned and accessible (4.1.2), and discharge piping plus pneumatic tubing undamaged (4.1.3). Also verify high-pressure bottles stay properly secured (4.1.4) and alarm devices sit undamaged in place (4.1.5).

Section 4.2 adds four extra 30-day checks IN ADDITION to Section 4.1 for low-pressure units. Distribution stop valves stay closed under 4.1.1, while crews additionally verify normal tank pressure (4.2.1), proper liquid level (4.2.2), and confirm the manual tank main service valve (4.2.3) and vapour supply line valve (4.2.4) remain secured OPEN.

Section 5 covers annual visual checks (5.1 to 5.5): confirm protected boundaries lack uncloseable openings (5.1), inspect all storage containers (retesting or replacing leaking, corroded, dented, or bulging bottles, 5.2), and check piping and nozzles (5.3). Verify flexible hoses and manifold connections sit tight (5.4). Confirm protected-space entrance doors close cleanly with CO2 warnings, and check remote release controls show clear instructions and space served (5.5). Annual checks exclude bottle weighing and pipe blow-through.

Section 6.1 recommends heavier checks at least biennially (2 years +/- 3 months) on passenger vessels, or at cargo intermediate, periodical, or renewal surveys. Under 6.1.1, verify charge mass on BOTH high-pressure main and pilot bottles (refilling any bottle losing over 10%, below 90% remaining) plus low-pressure tank liquid level for the largest hazard. Compare this 10% CO2 threshold against non-CO2 fixed gas systems under MSC.1/Circ.1432 paragraph 8.1.1 (above 95% charge / 5% max loss).

On the same Section 6.1 schedule, paragraph 6.1.3 recommends isolating system discharge lines before blowing dry air or nitrogen through the piping and nozzles to prove they are not blocked. Avoid un-dried service air because moisture freezes inside nozzles during discharge and corrodes internal pipe walls.

Section 6.2 recommends specialist tests at least biennially (2 years +/- 3 months) on passenger ships and at cargo renewal surveys, carried out by service technicians or specialists trained to standards accepted by the Administration. Where possible, remove activating heads and test at full working pressure via pilot lines (6.2.1). Otherwise, uncouple pilot tubing from bottle valves and cap or loop those lines together for release-station pressure/leakage tests, followed by alarm, delay, cable, and restoration checks (6.2.2 to 6.2.3).

Finally, Section 7 recommends an internal inspection of all control valves at least once every five years (Appendix HP item 20). The circular does not set the method, so follow the maker's instructions and any flag or class requirement.

  • Follow a Section 2 safety plan covering personnel accountability, communications, and prior notice, locking out directional-valve levers or the system block valve first.
  • Run 30-day checks across Section 4.1 (stop valves closed, controls ready, piping/tubing intact, HP bottles secured, alarms intact) plus Section 4.2 LP checks.
  • Verify biennial passenger or cargo intermediate/periodical/renewal logs prove >90% HP main/pilot charge plus LP level (6.1.1) and dry-air blow-through (6.1.3).
  • Track renewal specialist pilot-line/head/alarm tests (6.2) and five-year internal inspections of all control valves (Section 7).

5. 10-Year and 20-Year Hydrostatic Testing, 50% Failure Escalation and Manifold Hoses

MSC.1/Circ.1318/Rev.1 supersedes the 2009 circular, and its cover note (para. 2) says it was issued to clarify the hydrostatic testing regime for high-pressure CO2 cylinders. The rules sit in para. 6.1.2 and Appendix HP items 19 and 24, so a maintenance plan still based on the 2009 text should be checked against them.

Check hydrostatic test dates on every Section 6.1 cycle. Para. 6.1.2 recommends periodical high-pressure bottle tests within a 10-year ceiling. During the year-10 check, a minimum 10% sample of main and pilot cylinders (Appendix HP item 19) should complete internal inspection and hydrostatic testing to ISO 18119:2018. Any failure widens testing to 50% cumulative (another 40%), and any further failure triggers 100%.

Prior to year 20 and on every tenth year afterwards (year 30, year 40), para. 6.1.2 and Appendix HP item 19 recommend hydrostatically testing 100% of main and pilot bottles.

Plan bottle removals ahead of dry-dock. Under 6.1.2, removed bottles should be temporarily replaced while in service so onboard gas meets FSS 5/2.2.1, subject to SOLAS II-2/14.2 readiness rules (consult the flag Administration if full capacity cannot remain aboard).

Beside bottle tests, para. 6.1.2 recommends renewing flexible manifold hoses at maker intervals not exceeding every 10 years (log fitment dates per Appendix HP technical item 9). Appendix HP item 24 also recommends visually inspecting manifold non-return (check) valves every 10 years.

  • Maintain a cylinder register logging serial number, manufacture date, tare weight, net CO2 mass, and last ISO 18119:2018 test date for main and pilot bottles.
  • Plan dry-dock logistics early ahead of year 20 or 30 so 100% of main and pilot bottles complete hydrotesting without breaching II-2/14.2.
  • Track flexible hose fitment dates and renew at maker intervals not exceeding 10 years (Circ.1318/Rev.1 § 6.1.2).
  • Include 10-year visual inspection of manifold check valves in the PMS (Appendix HP item 24).

6. Ultrasonic vs Load-Cell Weighing, Pilot-Bottle Faults and Field Troubleshooting

Verify high-pressure CO2 charges by calibrated weighing (FSS 5/2.1.1.3 hanging bars or approved gear) or an approved ultrasonic liquid-level meter. Carbon dioxide has a critical temperature of about 31 °C (88 °F). Well below it, liquid CO2 sits beneath its vapour and an ultrasonic probe finds a clear liquid level.

As the cylinder temperature nears about 31 °C the difference between liquid and vapour fades, and above it there is no liquid level at all, so readings on full cylinders become erratic. When the room is near the meter maker's temperature limit, cool the room or weigh the cylinders against their stamped tare weights.

Weighing also catches swapped cylinders carrying heavier valve assemblies and logbook errors. Compute net CO2 mass as measured gross mass minus stamped tare weight (per maker data), refilling any bottle below 90% nominal charge (under 40.5 kg on a 45 kg bottle).

Separate monthly visual pilot checks from periodic weighing and specialist tests. Visually inspect pilot bottles, seals, tubing, and lever position/accessibility monthly under Section 4.1 WITHOUT touching live levers. Verify pilot charge (>90% nominal) on the Section 6.1.1 cycle, leaving lever, cable, and pilot-line actuation tests to Section 6.2 specialists under Section 2 lockout.

As field practice (separate from Section 4.1), investigate any slow 1 to 2 bar rise on the main manifold gauge. Unlike a ruptured burst disc (which vents to the room or vent line), slow manifold pressure rise signals a weeping discharge valve seat against closed stop valves. Verify room air with a SOLAS XI-1/7 meter, run low-level exhaust, apply Section 2 lockout, and leak-test valves.

After Section 6.1.3 isolated pipe blow-through and Section 6.2.3 specialist servicing, reconnect every union cleanly, check burst discs and caps, reset pressure-switch interlocks, verify stop valves sit closed and controls sit ready, and log all readings.

  • Log CO2 room temperature before ultrasonic checks, switching to weighing with the 2.1.1.3 gear near the meter maker's temperature limit (CO2 critical temperature about 31 °C).
  • Compare gross weight against tare weight on the Section 6.1.1 cycle and refill any bottle under 90% nominal charge.
  • Visually check pilot bottles, seals, tubing, and levers monthly without actuating live levers (Section 4.1), testing actuation under Section 2 lockout at Section 6.2.
  • Investigate manifold gauge creep as a weeping valve seat only after SOLAS XI-1/7 gas testing, running exhaust, and Section 2 lockout.

7. HSSC (A.1207(34)) Surveys and Port State Control (A.1206(34)) Inspection Readiness

Separate survey guidelines from advisory servicing circulars ahead of class or PSC audits. Neither IMO Resolution A.1207(34) (2025 HSSC Survey Guidelines, adopted 3 December 2025) nor IMO Resolution A.1206(34) (2025 IMO PSC Procedures, adopted 3 December 2025) cites MSC.1/Circ.1318/Rev.1 or MSC.1/Circ.1432. Both verify CO2 servicing via SOLAS II-2/14 operational readiness and onboard maintenance plans.

Under A.1207(34) Annex 1 Section (E) 1 (Cargo Ship Safety Equipment), initial surveys review machinery-space plans ((EI) 1.1.1.4), installation tests ((EI) 1.1.4.6), and two separate CO2 controls ((EI) 1.1.4.7, citing SOLAS II-2/10.4.1.5). Initial checks also cover remote stops and closures ((EI) 1.1.4.8), tanker pump-rooms ((EI) 1.1.5.3), and fire-control plans, maintenance plans, and fire training/operational booklets ((EI) 1.1.7.1 to 1.1.7.3).

Annual Cargo Ship Safety Equipment surveys verify maintenance plans ((EA) 1.2.1.10), post-fire system usage ((EA) 1.2.1.12), and operational readiness ((EA) 1.2.2.5). They also verify clear operating markings ((EA) 1.2.2.6), remote machinery closures ((EA) 1.2.2.7), and two separate CO2 release controls ((EA) 1.2.2.8).

Periodical surveys (2nd or 3rd anniversary) deepen inspection scope. Item (EP) 1.3.2.2 confirms CO2 capacity checks and clear-passage verification of discharge lines, while (EP) 1.3.2.3 escalates remote machinery closures and stops to active testing. On tankers, (EP) 1.3.3.2 confirms clear pump-room pipework and checks remote opening closures. Renewal surveys inherit periodical equipment and tanker checks via (ER) 1.4.2.1 and (ER) 1.4.3.1, plus records via (ER) 1.4.1.1.

Note two A.1207(34) boundaries. The Cargo Ship Safety Construction guidelines have no CO2-specific item; at initial survey, (CI) 2.1.4.59 tests the fire dampers, the closing of the main ventilation inlets and outlets, and the stopping of power ventilation from outside the space served. On passenger ships, initial-survey item (PI) 5.1.3.78 checks the two separate CO2 controls in a release box for machinery spaces (SOLAS II-2/10.4 and FSS 5/2.2.2).

Under A.1206(34), fixed CO2 defects create serious detention exposure. Appendix 2 Section 5 (SOLAS item 6) lists missing, non-compliant, or heavily degraded fixed extinguishing gear, ventilation valves, fire dampers, or quick-closing devices unable to perform intended use as examples that may warrant detention. SOLAS item 13 links detention to serious Appendix 7 operational failures.

During detailed inspections under Appendix 6, PSCOs check frayed or disconnected quick-closing wires (3.2), poor machinery cleanliness paired with fixed-system defects (6.1), fire doors and dampers (6.3), and Safety Construction air/oil shut-offs (8). Appendix 12 checks cargo-space fixed-gas Exemption Certificates (Part A item 43, SOLAS II-2/10.7.1.4) plus fire-control plans, operational booklets, training manuals, training/drill/maintenance records, and SOLAS II-2/14 maintenance plans (Part B items 13 to 15, 17, and 49).

Crew familiarity under Appendix 7 decides clean inspections versus detentions. Part 1 para. 5.1 says detention may be considered when relevant officers and crew are unfamiliar with the release system for the fixed fire-fighting system, the ventilation stops, or the fuel quick-closing valves. Separately, 5.2.1 cites an engineer failing remote fuel-valve demonstrations (SOLAS II-2/4.2.2.3.4) as a Convention deficiency linked to SOLAS XI-1/4. Para. 4.6 asks the PSCO to verify communications between the safety centre, the control stations and the fire-extinguishing storage rooms (passenger ships built on or after 1 July 2010 carry a safety centre, para. 4.5). Part 2 item 1.4.2.1 checks fire maintenance/operation instructions sit under one cover, while 2.5.4 recommends involving CO2-room crew in fire drills where the PSCO may test their duties.

  • Keep one binder holding SOLAS II-2/14 maintenance plans, fire-fighting/containment maintenance and operation instructions under one cover (App. 7 Part 2 1.4.2.1), weighing/blow-through logs, 5-year valve checks, and hydrotest certificates.
  • Pre-audit Cargo Ship SEC checkpoints: (EA) 1.2.2.8 two controls, (EP) 1.3.2.2 CO2 capacity and clear lines, and (EP) 1.3.2.3 remote-closure tests.
  • Involve CO2-room crew during fire drills (App. 7 Part 2 2.5.4) so each explains and demonstrates release sequence, delay, ventilation stops, and quick-closing valves unassisted.
  • Book a 1-hour consultancy ($350 USD + 5% sales tax) via Marvel Solutionz for 20-year CO2 hydrotest planning or PSC/class rectification.

Frequently Asked Questions

What is the maximum recommended CO2 weight loss before refilling a high-pressure cylinder?

Under recommendatory IMO guidance MSC.1/Circ.1318/Rev.1 para. 6.1.1 (binding where flag, class, or SMS adopts it), both high-pressure main and pilot CO2 bottles should retain above 90% nominal charge, refilling any bottle over 10% loss. Compare this 10% CO2 threshold against 5% for non-CO2 fixed gas systems under MSC.1/Circ.1432 para. 8.1.1.

How does the 20-year hydrostatic testing guidance in MSC.1/Circ.1318/Rev.1 differ from the 10-year check?

At the 10-year inspection, MSC.1/Circ.1318/Rev.1 para. 6.1.2 and Appendix HP item 19 recommend internal inspection and hydrostatic testing (ISO 18119:2018) of a 10% main/pilot sample (widening to 50% cumulative on fail, then 100%). Prior to year 20 and every tenth year afterwards, 100% of main and pilot bottles should undergo hydrostatic testing.

Does MSC.1/Circ.1318/Rev.1 recommend annual cylinder weighing and discharge-pipe blow-through?

No. Under recommendatory IMO guidance MSC.1/Circ.1318/Rev.1, Section 5 annual checks cover boundaries, storage containers, piping, nozzles, tightened hoses, protected-space doors, and release instructions. Charge checks (6.1.1) and isolated dry-air/N2 blow-through (6.1.3) sit on Section 6.1: biennially (2 years +/- 3 months) on passenger ships, or at cargo intermediate, periodical, or renewal surveys.

Why do ultrasonic CO2 level meters fail in hot tropical CO2 rooms?

Carbon dioxide has a critical temperature of about 31 °C (88 °F). As the cylinder nears it, the liquid and vapour become alike, and above it there is no liquid level for the probe to find, so full cylinders can read wrongly. Near the meter maker's temperature limit, cool the room or weigh the cylinders with the FSS 5/2.1.1.3 hanging bars or approved gear.

Does SOLAS Chapter II-2 or FSS Code Chapter 5 set a 55 °C maximum temperature for high-pressure CO2 rooms?

No. FSS 5/2.1.1.4 states qualitatively that high-pressure storage suits expected ambient temperatures, while the Administration (often through class rules) sets the numeric design limits. On low-pressure CO2 tanks, para. 2.2.4.5 sets 45 °C ambient air for the 24-hour unpowered hold, while para. 2.2.4.7 sets up to 32 °C sea water and 45 °C air for continuous reefer duty.

Can Port State Control detain a ship if crew cannot explain CO2 room duties during a fire drill?

Yes. A.1206(34) Appendix 2 Section 5 (SOLAS item 13) links detention to serious Appendix 7 operational deficiencies. Part 1 para. 5.1 lists officers and crew unfamiliar with the release system for the fixed fire-fighting system as a case where detention may be considered, while Part 2 item 2.5.4 recommends involving CO2-room crew in drills where the PSCO may test their duties.

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.