SOLAS II-2/10.8, 10.11 PFOS ban (MSC.532(107)) and FSS Code Ch. 14 deck foam guide: delivery rates, IBC Ch. 11, MSC.1/Circ.1312 lab tests, HSSC & PSC.

← All technical guides · Category: Dual-Fuel & Marine Engines · Updated: · 15 min read

Key Takeaways (TL;DR)

  • SOLAS II-2/10.8 (MSC.99(73)) and FSS Code Chapter 14 (replaced by MSC.339(91), effective 1 July 2014) govern oil tanker deck foam. Tankers below 20,000 DWT and tankers carrying petroleum above 60 °C flashpoint still need fixed deck foam.
  • FSS Ch. 14 para. 2.2.1.1 sizes oil flow at the largest of 0.6 L/min/m² deck area, 6 L/min/m² biggest tank, or 3 L/min/m² protected forward of the largest monitor (no monitor should deliver less than 1,250 L/min). Supply lasts at least 20 min with inert gas, or 30 min without it or where inerting is not required; IBC 11.3 uses 2, 20, and 10 L/min/m² for 30 min.
  • SOLAS II-2/10.11 and II-2/1.2.10 (MSC.532(107), effective 1 January 2026) ban the use or storage of extinguishing media containing PFOS (foams included) on ships built from 1 January 2026, and on earlier ships by their first survey on or after 1 January 2026. The unified interpretations in MSC.1/Circ.1694 read 'containing PFOS' as above 10 mg/kg (0.001% by weight), shown by a maker's declaration or a laboratory test report.
  • Recommendatory guidance MSC.1/Circ.1312 sets periodical lab tests within 3 years of supply then annually (pre-delivery plus annually for protein-AR acetone stability). MSC.1/Circ.1432 covers monthly valve checks (5.3), quarterly tank quantity checks (6.2), annual flow tests (7.4), and five-year proportioner checks (+30% to -10%, 9.2.4).

SOLAS II-2/10.8 & 10.11, FSS Ch. 14 (MSC.339(91)), IBC 11.3 & IMO Guidance Baselines

ParameterOil Tankers (FSS Ch. 14)Chemical Tankers (IBC 11.3)Statutory vs Guidance Basis
Delivery rate (largest of 3)0.6 L/min/m² deck, 6 L/min/m² biggest tank, or 3 L/min/m² protected forward of largest monitor (output should reach 1,250 L/min, 2.2.1.1 rate .3).2 L/min/m² deck, 20 L/min/m² biggest tank, or 10 L/min/m² protected forward of largest monitor (1,250 L/min mandatory floor, 11.3.5.3 & 11.3.7; < 4,000 DWT flag-set).Statutory: FSS 14/2.2.1.1 vs IBC 11.3.5. Oil above 60 °C uses FSS Ch. 14 (II-2/1.6.4); IBC ships solely carrying cargoes of 60 °C flashpoint and above may apply II-2/1.6.4 (11.1.3); solely NF ships need no foam (11.1.2).
Duration & foam gradeAt least 20 min with inert gas, or 30 min lacking inert gas or where inerting is not required (2.2.1.3). Common fire main adds 2 nozzles (2.1.3). Single grade: Type B non-polar, Type A polar (2.2.1.4).At least 30 min at peak rate (11.3.6). Regular protein foam barred (11.3.2). One concentrate for widest cargo range (11.3.2), matched to IBC Ch. 17 col. l (11.4).Statutory: FSS 14/2.1.3, 2.2.1.3, 2.2.1.4, IBC 11.3.2, 11.3.6 & 11.4. SOLAS II-2/1.6.2.1.3 lets flags accept 20 min with inert gas on additional-hazard cargoes.
Monitors & < 4,000 DWTEach monitor gives 50%+ flow (2.2.2.1); farthest forward point stays inside 75% still-air throw (2.3.2.2). Below 4,000 DWT, flags may waive monitors for 25%+ applicators. Four 400 L/min, 15 m applicators minimum (2.2.2.2, 2.3.3.1).Monitors give 50%+ of 11.3.5.1/2 flow within 75% still-air throw (11.3.7, 11.3.8). No monitor waiver below 4,000 DWT. Four 400 L/min, 15 m applicators (11.3.10); bow/stern cargo transfer adds 1 monitor + 1 applicator (11.3.16).Statutory: FSS 14/2.2.2 to 2.3.3, IBC 11.3.7 to 11.3.16. MSC.339(91) dropped Ch. 14 12:1 cap & added +/-10% prototype tests (MSC.327(90) also dropped 12:1 from new Ch. 6 para. 4.1.2, for ships built from 1 Jan 2014).
PFOS ban & proofPFOS media barred on ships built from 1 Jan 2026 (10.11.1, 10.11.2.2) and on earlier ships by the first survey on or after 1 Jan 2026 (1.2.10). Landed media go to appropriate shore reception (10.11.2.1).Applies identically on SOLAS chemical tankers via II-2/1.2.10 & 10.11. HSC Code 7.9.4 mirrors it (MSC.536(107) uses should for 1994 HSC; MSC.537(107) uses shall for 2000 HSC).Statutory: II-2/1.2.10 & 10.11 (MSC.532(107)). IMO unified interpretations MSC.1/Circ.1694 (4 July 2025): 'containing PFOS' means above 10 mg/kg (0.001% by weight), shown by a maker's declaration or a lab test report.
Maintenance & lab testsZero weekly, 2-year, or 10-year foam items in Circ.1432. Monthly valves/gauges (5.3), quarterly tank quantity (6.2), annual flow/strainers/samples (7.4), 5-year valves & proportioner +30% to -10% (9.2).Portable containers (guidance Circ.1432 7.11): check seals & maker life (7.11.2). Sealed non-protein < 10 yr normally skip Circ.1312 (7.11.3). Protein > 5 yr should test/renew (7.11.4); unsealed/undocumented should test (7.11.5).IMO Guidance (via II-2/14 & SMS): Circ.1312 (3 yr then annual; protein-AR acetone pre-delivery + annual) & Circ.1432 (Circ.1516 edits sprinkler, water-spray, and water-mist only).

1. Statutory Scope: SOLAS II-2/10.8, MSC.339(91) & Small or High-Flashpoint Tankers

Tanker deck foam systems take their legal mandate from SOLAS Chapter II-2 Regulation 10.8, adopted by IMO Resolution MSC.99(73) on 5 December 2000 (effective 1 July 2002). Technical rules sit in FSS Code Chapter 14 (MSC.98(73)). On 30 November 2012, IMO Resolution MSC.339(91) replaced Chapter 14 completely, taking effect on 1 July 2014. The new Chapter 14 text has no construction-date clause of its own, so confirm with the flag or class which edition the ship's deck foam system was approved to.

Some operators assume tankers under 20,000 tonnes deadweight need no fixed deck foam. SOLAS II-2/10.8.1.3 confirms the opposite: tankers below 20,000 DWT must carry an FSS Code deck foam system. In the text, the 20,000 DWT line in Regulation 10.8.1.1 only decides where the flag may accept other fixed installations giving equivalent protection under Regulation I/5 (ships of 20,000 DWT and upwards). Any accepted alternative must extinguish spill fires, stop unignited oil igniting, and fight fires inside ruptured tanks (10.8.1.2).

Flashpoint exemptions are equally narrow. Under SOLAS II-2/1.6.1, tanker rules cover crude oil, petroleum products, and other liquid cargoes with a similar fire hazard at or below 60 °C closed-cup flashpoint and Reid vapour pressure below atmospheric. Under Regulation 1.6.3, liquid cargoes above 60 °C that are neither oil products nor IBC Code liquids are classed as low fire risk and need no fixed deck foam. Regulation 1.6.4 covers oil tankers carrying petroleum cargoes above 60 °C, which still require FSS Code deck foam, 40 m fire-main isolation valves (10.2.1.4.4), and two extra fire-fighter's outfits (10.10.2.3).

Do not confuse the FSS Code amendment resolutions. IMO Resolution MSC.403(96) (adopted 19 May 2016, effective 1 January 2020) amended FSS Code Chapter 8 on automatic sprinklers and added Chapter 17 for helicopter facility foam appliances. It made zero changes to Chapter 14 tanker deck foam rules. Under SOLAS II-2/14.4, every tanker must also have a maintenance plan for its inert gas system, deck foam system, cargo pump-room fire safety arrangements, and flammable gas detectors.

  • Check the Record of Equipment (Form E) of the Cargo Ship Safety Equipment Certificate or the IBC Certificate of Fitness to confirm whether FSS Code Chapter 14 or IBC Section 11.3 governs the deck foam system.
  • Verify tankers below 20,000 DWT and oil tankers carrying petroleum above 60 °C keep full FSS Code Chapter 14 readiness under SOLAS II-2/10.8.1.3 and 1.6.4.
  • Confirm the onboard fire binder holds the tanker deck foam maintenance plan required under SOLAS II-2/14.4 (item .2, deck foam systems) alongside maker manuals.

2. Delivery Rates, 20 vs 30 Minute Reserves & IBC Code Chapter 11 Rules

Under MSC.339(91) FSS Code Chapter 14 paragraph 2.2.1.1, oil tankers must size foam solution flow at the largest of three figures. Cargo scope covers crude oil, petroleum, and IBC Chapter 18 liquids at or below 60 °C where regular foam works (cargo scope .1), petroleum above 60 °C (.2), and IBC Chapter 17 products above 60 °C (.3). Rate criterion .1 is 0.6 L/min/m² across cargo deck area (maximum breadth times cargo tank space length). Criterion .2 is 6 L/min/m² over the largest single tank horizontal area, and criterion .3 is 3 L/min/m² of the area protected forward of the largest monitor.

Watch a subtle wording shift between FSS Code editions. Original MSC.98(73) used shall for a 1,250 L/min floor both in rate criterion 2.2.1.1.3 and for every monitor in 2.2.2.2. In MSC.339(91), old 2.2.2.2 was deleted, and paragraph 2.2.1.1 (rate criterion .3) phrases the 1,250 L/min monitor floor with should. Each monitor must still supply at least 50% of the required solution rate under mandatory paragraph 2.2.2.1. Verify with flag or class how the 1,250 L/min guideline is applied on board.

Concentrate tank volume hinges on inert gas fitment and seawater piping layout. Under FSS Chapter 14 paragraph 2.2.1.3, concentrate stocks must support at least 20 minutes of full-rate generation on tankers with inert gas. Tankers lacking an inert gas plant, or where using inert gas is not required, need at least 30 minutes. MSC.339(91) also expanded paragraph 2.1.3: where a common fire-main line feeds the foam system, extra concentrate must cover two fire-main nozzles over the same period. The minimum required fire-main jets must remain usable at the required pressure on deck over the full length of the ship, and in the accommodation, service spaces, control stations and machinery spaces.

Chemical tankers under the IBC Code (IMO Resolution MSC.176(79), adopted 10 December 2004, effective 1 January 2007) follow Chapter 11 regardless of tonnage (11.1.1), replacing SOLAS II-2/10.8 with Section 11.3 (11.1.1.1, 11.1.1.4). Two carve-outs apply: ships carrying solely non-flammable cargoes (entry NF in column i) need no deck foam (11.1.2), and ships carrying solely cargoes at or above 60 °C (entry Yes) may apply SOLAS II-2/1.6.4 instead (11.1.3). IBC 11.3.5 raises all three rates to 2 L/min/m² over deck area, 20 L/min/m² over the biggest tank, and 10 L/min/m² over the area protected forward of the largest monitor. Paragraphs 11.3.5.3 and 11.3.7 mandate a 1,250 L/min floor, leaving minimum monitor capacity below 4,000 DWT to the Administration. IBC 11.3.6 requires at least 30 minutes of supply with no inert-gas discount (contrast SOLAS II-2/1.6.2.1.3, where flags may accept 20 minutes with inert gas on additional-hazard cargoes). IBC 11.3.2 bans regular protein foam and requires one concentrate grade suited to the widest range of intended cargoes. Effective media appear in IBC Chapter 17 column l (IBC 11.4), where code A means alcohol-resistant or multi-purpose foam and code B means regular foam (any foam that is not alcohol-resistant, including fluoroprotein and AFFF). FSS 14/2.2.1.4 similarly pairs Type A with polar solvents and Type B with non-polar cargoes.

  • Audit concentrate volume against the governing rate (0.6/6/3 L/min/m² under FSS Ch. 14 or 2/20/10 L/min/m² under IBC 11.3.5), duration (at least 20 or 30 min), and induction percentage.
  • On MSC.339(91) tankers fed through a common fire-main line, confirm concentrate sizing includes the extra two-nozzle reserve required under FSS 14/2.1.3.
  • Match the IBC Certificate of Fitness cargo list (Chapter 17 column l) against concentrate approval, confirming one grade only is stored aboard (FSS 14/2.2.1.4 & IBC 11.3.2).

3. Monitors, Applicators, Isolation Valves, Prototype Tests & Expansion Rules

Deck foam hardware pairs fixed monitors with portable applicators. Under FSS Chapter 14 paragraph 2.2.2.1, each fixed monitor must deliver at least 50% of required foam solution supply rate. On oil tankers under 4,000 DWT, flags may waive monitors in favour of applicators rated at least 25% of required supply rate each. Chemical tankers under IBC 11.3.5.3 and 11.3.7 receive no monitor waiver below 4,000 DWT: only minimum monitor capacity falls to the Administration.

Monitor placement and reach define deck coverage. Under FSS 14/2.3.2.2 and IBC 11.3.8, distance from each monitor out to the furthest protected forward point cannot exceed 75% of still-air throw. Port and starboard sides of the accommodation or poop front facing the cargo deck need a monitor plus an applicator hose outlet (2.3.2.3). Even where flags waive monitors below 4,000 DWT, those port and starboard applicator connections stay mandatory. MSC.339(91) added to 2.3.2.3 that monitors and hose connections stay aft of the cargo tanks, but may stand in the cargo area above pump-rooms, cofferdams, ballast tanks or void spaces next to cargo tanks if they can protect the deck below and aft of each other. Chemical tankers arranged for bow or stern cargo transfer need one extra monitor plus one extra applicator under IBC 11.3.16.

Applicators cover deck manifolds and pipe racks screened from fixed jets. Under FSS 14/2.2.2.2 and 2.3.3.1 (plus IBC 11.3.10), every tanker carries four or more applicators rated at 400 L/min minimum with at least 15 metres still-air throw. Deck outlets must let two applicators reach any part of the cargo deck. Isolation valves must protect both the foam header and any integral fire-main section immediately forward of each monitor so damaged forward lines can be shut off (FSS 14/2.3.4.1 & IBC 11.3.11). Tanker fire mains also fit isolation valves at the protected poop front and at intervals up to 40 metres along the deck (SOLAS II-2/10.2.1.4.4). The main foam control station sits outside the cargo area beside the accommodation (FSS 14/2.3.1.1 & IBC 11.3.4).

Expansion ratio rules changed across both Chapter 14 and Chapter 6 in 2014. Original MSC.98(73) Chapter 14 para. 2.2.1.2 kept expansion ratios at or below 12 to 1 in general and defined medium expansion as 50:1 to 150:1. MSC.339(91) (effective 1 July 2014) removed that 12:1 cap from Chapter 14 completely and widened medium expansion to 21:1 through 200:1. It also added a mandatory prototype test in 2.2.2.1 keeping monitor and applicator expansion ratio and drainage time within +/-10% of the concentrate approval values under 2.2.1.4. Similarly, MSC.327(90) (adopted 25 May 2012, effective 1 January 2014) replaced FSS Code Chapter 6 and moved machinery-space low-expansion foam to para. 4.1.2. That amendment removed the 12:1 cap for ships built from 1 January 2014 onwards, leaving old Chapter 6 para. 2.3.1.2 relevant only to pre-2014 builds.

  • Test every foam-header and integral fire-main isolation valve forward of each deck monitor (FSS 14/2.3.4.1) for smooth stem travel, clear marking, and intact handwheels.
  • Verify all four or more foam applicators (minimum 400 L/min, 15 m reach) are stowed cleanly near deck hydrants with intact nozzles, couplings, and spanners.
  • Confirm the main foam control station outside the cargo area (2.3.1.1) displays clear valve line-up diagrams, operating steps, and unobstructed access.

4. SOLAS II-2/10.11 PFOS Prohibition (MSC.532(107)) & MSC.1/Circ.1694 Verification

On 8 June 2023, IMO adopted Resolution MSC.532(107), taking effect on 1 January 2026 to ban perfluorooctane sulfonic acid (PFOS) in shipboard fire-extinguishing media. Ships built on or after 1 January 2026 must not use or store extinguishing media containing PFOS (SOLAS II-2/10.11.1 application, 10.11.2.2 prohibition). Ships built before 1 January 2026 must comply with 10.11.2 not later than their first survey on or after 1 January 2026 (SOLAS II-2/1.2.10). Companion resolutions MSC.536(107) and MSC.537(107) add paragraph 7.9.4 across the 1994 and 2000 high-speed craft codes (the 1994 HSC Code text uses should and applies to all craft by the first survey on or after 1 January 2026; SOLAS and the 2000 HSC Code use shall).

Removed stocks go ashore, never overboard. Under SOLAS II-2/10.11.2.1, prohibited PFOS media removed from a ship must be delivered to appropriate shore-based reception facilities. Keep signed waste reception receipts and disposal records on board and ashore to prove clean removal.

Because MSC.532(107) prints no concentration threshold inside Regulation 10.11 itself, IMO issued Unified Interpretation MSC.1/Circ.1694 on 4 July 2025 (approved at MSC 110) as guidance starting 1 January 2026. Paragraph 1 interprets fire-extinguishing media to include fire-fighting foams. Paragraph 2 reads 'containing PFOS' as concentrations above 10 mg/kg (0.001% by weight). Under paragraph 3, verification should involve the Administration or its recognised organisation reviewing the maker's declaration or laboratory test reports, provided by shipyards, repair yards and equipment makers. Under paragraph 4, the declaration should include such details as foam type, production period, batch number and the type approval or Marine Equipment Directive certificate reference.

For stocks installed prior to 1 January 2026 lacking both a maker's declaration and lab reports, MSC.1/Circ.1694 paragraph 5 says sampling and testing on board to a recognised standard should be required. The ban covers PFOS, not every fluorinated foam. Where a tank or proportioner that held PFOS-containing concentrate is refilled, follow the maker's and class guidance on cleaning so that residues do not contaminate the new stock, and send the removed media and rinse water to shore reception.

  • Compile PFOS-free proof for every foam stock aboard: fixed deck foam tank, machinery-space foam tank, portable applicator drums, and portable foam extinguishers.
  • Check each maker's declaration against MSC.1/Circ.1694 para. 4 (foam type, production period, batch number, type approval or MED reference) and confirm PFOS is not above 10 mg/kg.
  • For undocumented pre-2026 foam stocks, book recognised-standard lab testing (MSC.1/Circ.1694 para. 5) ahead of the ship's first survey on or after 1 January 2026, and file shore disposal receipts.

5. MSC.1/Circ.1312 Foam Lab Controls & MSC.1/Circ.1432 Maintenance Schedule

Ongoing foam care rests on two recommendatory IMO circulars applied through the ship's SOLAS II-2/14 maintenance plan and flag or class instructions where adopted. MSC.1/Circ.1312 (approved at MSC 86, issued 10 June 2009, as corrected, superseding MSC/Circ.582 and Corr.1 and MSC/Circ.799) covers foam concentrates for tanker and chemical tanker fixed deck foam, machinery-space fixed foam (FSS Ch. 6) and portable foam applicators (FSS Ch. 4). It covers the concentrate alone, never generating hardware.

Engineers must keep MSC.1/Circ.1312 section 3 type-approval tests (done by makers) separate from section 4 onboard periodical controls (done by operators at Administration-accepted labs or service suppliers). Type-approval-only checks include four freeze-thaw cycles plus 7 days at 60 °C (3.1), 7-day 60 °C heat stability (3.2), and kinematic viscosity up to 200 mm²/s via ISO 3104 or ASTM D 445-86 (3.4.1). Under 3.4.2, non-Newtonian concentrates or those exceeding 200 mm²/s use an Administration-accepted method such as EN 1568. Section 3 also covers film spreading coefficient (3.6) and 4.5 m² steel tray fire tests needing extinction within 5 minutes and 25% burnback of at least 15 minutes (3.9).

Onboard periodical controls under section 4 use a representative 2-litre sample stored in a filled container (section 2). Samples for sedimentation (4.1), expansion ratio (4.3), and 25% drainage (4.4) are heat-conditioned at 60 °C for 24 hours before cooling. Labs check sedimentation up to 0.25% after 10 minutes at 6,000 (+/-100) m/s² through a 180 micrometre sieve (3.3) and pH between 6 and 9.5 at 20 (+/-2) °C (4.2). They also check simulated-seawater expansion at 11.4 L/min and 6.3 (+/-0.3) bar (4.3), 25% drainage (4.4), and volumic mass per ASTM D 1298-85 (4.5) against batch-certificate baselines (3.12). Protein-based alcohol-resistant foams add a small-scale fire test (4.6: SP Method 2580, ISO 7203-3 Annex C, or EN 1568-4 Annex I) and an acetone stability check (4.7, failing whenever foam solution blends into the acetone layer). Under section 5, general checks (4.1 to 4.6) run within 3 years of onboard supply then annually, while section 4.7 acetone stability runs prior to delivery and annually thereafter.

Hardware intervals sit in recommendatory circular MSC.1/Circ.1432 (issued May 2012), which holds zero weekly, zero two-year, and zero ten-year foam items. Note that MSC.1/Circ.1516 (issued June 2015) amended sprinkler, water-spray, and water-mist sections only, leaving all foam paragraphs untouched. Monthly items check valve positions and pressure gauges (5.3) plus portable applicator stowage (5.8), while quarterly checks verify tank concentrate quantity (6.2). Annual checks (7.4.1 to 7.4.10) cover visual condition, audible alarms, pump flow tests with fresh-water flushing (7.4.3), cross-connections, relief valves, strainers, valve line-up, Circ.1312 sampling (7.4.9) and fuel shut-off controls linked to fire systems (7.4.10); the air blow-through in 7.4.8 is for high-expansion systems. Under portable-container guidance (7.11.2 to 7.11.5), crew check factory seals and maker service life (7.11.2), and sealed non-protein containers under 10 years old can normally pass without lab tests (7.11.3). Protein units past 5 years should be tested or renewed (7.11.4), while unsealed containers or those lacking documented production data should be tested (7.11.5). Five-year guidance opens control valves internally (9.2.1), checks clear nozzles (9.2.3), and tests proportioners within +30% to -10% of nominal ratio (9.2.4; 9.2.2 covers high-expansion piping).

  • Confirm fixed-tank concentrate lab reports fall within 3 years initially and 12 months thereafter, checking sediment (up to 0.25%), pH (6 to 9.5), expansion, 25% drainage, and volumic mass (MSC.1/Circ.1312).
  • Audit portable foam containers under MSC.1/Circ.1432 para. 7.11 guidance: check factory seals, maker service life, 10-year non-protein thresholds, and 5-year protein testing or renewal.
  • Track five-year guidance items cleanly: control-valve internal examination (9.2.1), clear nozzles (9.2.3), and proportioner mixing accuracy within +30% to -10% (9.2.4).

6. Proportioner Diagnostics, Flushing Discipline & Concentrate Ageing

Even approved concentrate underperforms if proportioners drift out of ratio or corrode. Tanker deck installations use balanced-pressure foam pumps, bladder tanks, or inline venturi eductors. In five-year tests (Circ.1432 para. 9.2.4), a lean mix (below -10%) can weaken the foam, while a rich mix (above +30%) uses the concentrate faster than the 20-minute or 30-minute design allows. Common faults stem from sticking balancing spools, torn bladders, choked orifices, or worn pump clearances dropping concentrate pressure below seawater header pressure.

Because concentrates hold organic surfactants and salts, stagnant seawater inside proportioners, headers, or monitor barrels drives pitting and gel deposits. Circ.1432 para. 7.4.3 recommends fresh-water flushing after every service or flow test. Open deck low-point drains after flushing, swing each monitor across its full arc, and check isolation valve bonnets for weeping.

Circ.1312 section 4 warns that high storage temperature, contamination of the concentrate and an incompletely filled tank can cause abnormal ageing. Keep tanks filled to the approved level, keep breathers tight, and keep to the single approved concentrate type (FSS 14/2.2.1.4) so that mixed grades do not form sludge in suction strainers.

Watch cold-weather viscosity on winter voyages or after changing concentrate. Viscous or non-Newtonian concentrates can starve pump suctions or upset eductor mixing unless the foam room stays within the storage temperatures marked on the container (Circ.1312 para. 3.13) and the proportioner setting matches the maker's data for that concentrate.

  • After every annual flow test (Circ.1432 para. 7.4.3), flush the foam main, proportioner loop, and monitor branches with fresh water and drain low points dry.
  • Verify storage-tank concentrate quantity quarterly (Circ.1432 para. 6.2), and check foam-room heating against container marking limits (Circ.1312 para. 3.13) while minimising headspace air.
  • Before changing concentrate, confirm it is approved by the Administration for the cargoes carried (FSS 14/2.2.1.4) and follow the maker's guidance on proportioner setting and tank cleaning.

7. HSSC Survey Items (A.1207(34)) & PSC Detention Triggers (A.1206(34))

Surveyors follow IMO Resolution A.1207(34) (HSSC Survey Guidelines, 2025, adopted 3 December 2025). For oil tankers under Annex 1 (cargo ship safety equipment, (E) items), initial plan checks cover cargo tank protection under (EI) 1.1.2.1 (SOLAS II-2/10.8 and FSS Ch. 14). Installation checks sit at (EI) 1.1.5.1 and Annual checks at (EA) 1.2.3.1, verifying deck foam hardware and concentrate stocks. Those items also test that the minimum number of fire-main jets at the required pressure is obtained while the foam system runs (cross-referring to (EI) 1.1.4.1 and (EA) 1.2.2.1). Periodical (EP) 1.3.3.1 incorporates (EA) 1.2.3 (including (EA) 1.2.3.1), and Renewal (ER) 1.4.3.1 incorporates (EP) 1.3.3, alongside readiness ((EA) 1.2.2.5) and tanker maintenance plans and booklets ((EI) 1.1.7.2, 1.1.7.3, (EA) 1.2.1.10, 1.2.1.11). Note (EP) 1.3.2.2 and 1.3.3.2 cover FSS Ch. 5 to 7 systems rather than Ch. 14 deck foam.

Chemical tankers holding an IBC or BCH Certificate of Fitness follow Annex 5 ((D) items) in A.1207(34). Initial checks verify deck foam hardware and simultaneous fire-main jet pressure ((DI) 1.1.2.21). Annual ((DA) 1.2.2.15) and Intermediate ((DIn) 1.3.2.1, incorporating (DA) 1.2.2) checks examine pump-room and deck foam systems and clear operating markings. A.1207(34) has no separate PFOS survey item, so flag and RO surveyors check SOLAS II-2/10.11 directly, using MSC.1/Circ.1694 where the Administration applies it.

Under IMO Resolution A.1206(34) (2025 PSC Procedures, adopted 3 December 2025), tanker deck fire protection has its own Appendix 2 entry. Appendix 2 section 5 (areas under SOLAS 1974) item 7 lists absence, substantial deterioration or failure of the cargo deck area fire protection on tankers as a deficiency that may warrant detention, alongside Item 6 (fixed fire systems) and Item 13 (Appendix 7 lapses). Inert gas or cargo-gear failures, listed at the end of section 5, are grounds to stop cargo operations even where detention may not be warranted; deck foam failure sits under item 7 instead.

Crew operational readiness carries equal weight in port. Under Appendix 7 Part 1 para. 5.1, detention may be considered if relevant officers and crew are unfamiliar with where and how to start fire-fighting equipment such as the emergency fire pump or the release of a fixed system. Part 2 para. 1.4.2.1 recommends keeping maintenance and operating instructions under one accessible cover. Para. 2.10 guides PSCOs to verify up-to-date fire-control plans (required under SOLAS II-2/15.2.4) and officer familiarity. Appendix 12 Part B lists SOLAS II-2/14.4 maintenance plans (Item 49) plus training, drill, and maintenance logs (Item 17), and Appendix 21 already lists MSC.1/Circ.1694 (issued July 2025).

  • Run a pre-survey trial proving the fire pumps give the minimum required number of jets at the required fire-main pressure while deck foam is in operation (A.1207(34) (EA) 1.2.3.1 / (DI) 1.1.2.21).
  • Walk down the foam room with watchkeeping officers so each explains pump starting, proportioner line-up, monitor isolation valves, and emergency shut-offs unaided (A.1206(34) App. 7 Part 1 para. 5.1).
  • Keep one accessible fire binder holding the II-2/14.4 maintenance plan, Circ.1312 lab reports, five-year proportioner tests, Circ.1694 PFOS declarations, and updated fire-control plans (App. 7 Part 2 para. 1.4.2.1 & App. 12 Part B).

Frequently Asked Questions

Do oil tankers under 20,000 DWT or carrying cargoes above 60 °C flashpoint need fixed deck foam?

Yes. Under SOLAS II-2/10.8.1.3, tankers below 20,000 DWT need an FSS Code deck foam system; the 20,000 DWT line in 10.8.1.1 governs only Regulation I/5 equivalents. Oil tankers above 60 °C need FSS deck foam under II-2/1.6.4, and IBC ships solely carrying products of 60 °C flashpoint and above may apply II-2/1.6.4 (IBC 11.1.3). Solely NF IBC ships (11.1.2) and non-oil, non-IBC liquids above 60 °C (1.6.3) need no deck foam.

How do IBC Code Chapter 11 chemical foam rates differ from FSS Code Chapter 14 oil rates?

FSS Ch. 14 para. 2.2.1.1 sizes oil flow at the largest of 0.6 L/min/m² deck area, 6 L/min/m² biggest tank, or 3 L/min/m² protected forward of the largest monitor. Supply runs at least 20 min with inert gas, or 30 min lacking inert gas or where inerting is not required (2.2.1.3). IBC 11.3.5 raises chemical rates to 2, 20, and 10 L/min/m² for at least 30 min (11.3.6). It also bars regular protein foam (11.3.2), keeps monitors below 4,000 DWT, and adds one monitor and applicator for bow or stern cargo transfer (11.3.16).

Does FSS Code Chapter 14 still cap deck foam expansion ratio at 12 to 1?

No. Original MSC.98(73) Ch. 14 para. 2.2.1.2 kept expansion at or below 12 to 1 in general. MSC.339(91) (effective 1 July 2014) removed that 12:1 cap, widened medium expansion to 21:1 through 200:1, and added a +/-10% prototype test on expansion and drainage time (2.2.2.1). MSC.327(90) (effective 1 January 2014) also replaced FSS Ch. 6 and removed the 12:1 cap from para. 4.1.2, leaving old Ch. 6 para. 2.3.1.2 relevant only to pre-2014 builds.

What is the exact PFOS limit and compliance deadline under SOLAS II-2/10.11?

Under SOLAS II-2/10.11 and II-2/1.2.10 (MSC.532(107), effective 1 January 2026), extinguishing media containing PFOS are barred on ships built on or after 1 January 2026 and on earlier ships by their first survey on or after 1 January 2026. Removed media must be landed ashore at appropriate reception facilities (10.11.2.1). The unified interpretations in MSC.1/Circ.1694 (4 July 2025) read 'containing PFOS' as above 10 mg/kg (0.001% by weight), shown by a laboratory report or a maker's declaration.

At what intervals should fixed-tank concentrate and portable foam containers be lab tested?

Under recommendatory IMO guidance MSC.1/Circ.1312 section 5, periodical lab checks (4.1 to 4.6) run within 3 years of supply then annually, while protein-AR acetone stability (4.7) runs pre-delivery and annually. Under Circ.1432 para. 7.11 guidance, check seals and maker service life (7.11.2); sealed non-protein containers under 10 years old can normally pass untested (7.11.3). Protein units past 5 years should be tested or renewed (7.11.4), and unsealed or undocumented units should be tested (7.11.5).

What tolerance applies to the five-year foam proportioner test under MSC.1/Circ.1432?

Recommendatory circular MSC.1/Circ.1432 para. 9.2.4 tests proportioners every five years to confirm delivered mixing stays within +30% to -10% of nominal. Five-year guidance also opens control valves internally (9.2.1) and checks clear nozzles (9.2.3). MSC.1/Circ.1516 amended sprinkler, water-spray, and water-mist sections only, leaving every foam paragraph untouched.

Regulatory & Technical Sources

Train with Marvel Solutionz or get expert help

Try the LNG, Dual-Fuel & Spark-Gas simulator free for 5 minutes, then enrol in the Academy: Self-Paced $395 USD or 6-Week Cohort $995 USD (+ 5% sales tax). Or book a 1-hour consultancy for $350 USD (+ 5% sales tax).

Let’s talk about your operation and maintenance.

Enquiries welcome at any time. Book our daily 1-hour consultation at 12:00 PM Central Time (CT) ($350 USD + 5% sales tax) or send an enquiry about your vessel, power plant or project.

ACADEMY MEMBER & CLIENT COMMENTS

Have an Academy Access Key? Sign in on this page to send comments or questions straight to our instructors.